Less Ads, More Data, More Tools Register for FREE

Pin to quick picksLandore Resources Limited Regulatory News (LND)

Share Price Information for Landore Resources Limited (LND)

Share Price is delayed by 15 minutes
Get Live Data
1.80    0.00 (0.00%)
Bid:
1.70
Ask:
1.90
Spread: 0.20 (11.765%)
Market Cap: £6.69m
LND Live PriceLast checked at - London Stock Exchange

Intraday Landore Resources Limited Share Chart

Drilling Report

18 Aug 2009 07:00

RNS Number : 5740X
Landore Resources Limited
18 August 2009
Β 

ο»Ώ

LANDORE RESOURCES LIMITED

18thΒ AugustΒ 2009

DRILLING UPDATE

JUNIORΒ LAKEΒ PROPERTY

HIGHLIGHTS

Infill drilling on the historic B4-7 nickel-copper-cobalt-platinumΒ group elements (Ni-Cu-Co-PGE) deposit, locatedΒ on the Junior Lake property,Β hasΒ projected the deposit up-plunge to nearΒ surfaceΒ intersectingΒ wide zones of nickel mineralization. The deposit remains openΒ along strike andΒ down plungeΒ to theΒ north-west.

The recently completedΒ drilling and trenching campaignΒ on the LamauneΒ Iron deposit, located at theΒ western end of theΒ JuniorΒ LakeΒ property,Β has now successfullyΒ confirmedΒ the presenceΒ of theΒ magnetite iron depositΒ along approximately 5 kilometres of the central part of the trend. Assay and metallurgical results are pending

TheΒ JuniorΒ LakeΒ property:

The Junior Lake property, 100% owned by Landore,Β is located in the province of Ontario, Canada, approximately 235 kilometres north-northeast of Thunder Bay and is host to; the VW NickelΒ deposit,Β theΒ B4-7 deposit, the LamauneΒ Iron deposit, the BAM zone gold occurrence and numerous other highly prospective mineral occurrences.

B4-7Β Deposit:

An infillΒ drill programme, consisting ofΒ 42 NQ size holesΒ for a total ofΒ 8,764Β metres, hasΒ recentlyΒ been completed on the B4-7 deposit. The programme wasΒ designed to provide sufficient information and drill density to advance the deposit to Indicated status. Additional metallurgical testing will be completed using core from the present program

Assay resultsΒ have been received for the last 6Β drill holes.Β Mineralized intersections include:

Drill-hole

From

Width

Nickel

Copper

Cobalt

Platinum

Palladium

No

Metres

Metres

%

%

%

g/t

g/t

0409-236

92.64

17.59

0.73

0.28

0.06

0.25

0.92

0409-239

18.00

5.77

0.84

0.53

0.08

0.10

0.61

0409-240

12.33

7.48

0.84

0.40

0.05

0.10

0.63

including

13.86

1.14

1.02

0.40

0.06

0.19

0.63

including

16.00

1.00

1.02

0.54

0.06

0.08

0.77

and

21.85

6.70

0.87

0.69

0.09

0.06

0-64

0409-241

54.80

4.30

0.77

0.79

0.09

0.15

0.46

0409-242

22.53

3.39

0.90

0.32

0.06

0.23

0.50

0409-243

24.89

14.71

0.79

0.32

0.05

0.18

0.43

including

31.00

1.00

1.06

0.03

0.06

0.12

0.39

including

34.40

1.60

1.01

0.39

0.05

0.31

0.67

In May of 2008, LandoreΒ reportedΒ anΒ InferredΒ resource estimateΒ for the B4-7 depositΒ of 4,650,000 tonnes at 0.55% Nickel Equivalent (NiEq) (nickel plus copper-cobalt-PGE credits) at a 0.3% Ni cutoff. The resource estimate was independently prepared toΒ Australasian Joint Ore Reserves Committee (JORC) Code (2004)Β compliance byΒ Snowden Mining Industry Consultants,Β Perth,Β Australia

Landore has appointedΒ Scott Wilson Roscoe Postle Associates Inc. (Scott Wilson RPA), consulting and engineering group from Toronto,Β Canada, to prepare aΒ CanadianΒ National Instrument 43-101 (NI43-101) compliant resource estimate upgrade on theΒ B4-7 deposit.

The drill campaign has shown that the B4-7 deposit remains open to the west along strike and down plunge to the north-west. A previously completed airborne electromagnetic survey suggests the conductive horizon hosting the B4-7 deposit persists for an additional 500 meters to the west.

A 500 metre drill campaign to test for the above possible extensionΒ is planned for this September.

Lamaune Iron deposit:

In October 2008, Landore reported that exploration, including geophysical surveys, trenching and drilling, hadΒ confirmed the presence of a large magnetite ironΒ deposit at the western end of theΒ JuniorΒ LakeΒ property.

A second campaign, consisting ofΒ 16 trenches for 1,135Β metresΒ excavated and 22 drill-holes for a total of 4,648Β metres of drilling,Β hasΒ nowΒ been completed. The trenches and drill-holesΒ wereΒ planned to give even coverage along approximately 5 kilometres of the central part of the trend.

CuttingΒ and sampling is in progress. Assay results are pending. Sampling is also being undertaken forΒ metallurgical and beneficiation testing.

JuniorΒ LakeΒ Exploration:

An exploration drilling campaign, consisting of 8 holes for a total of 1,500 metres of drilling has commenced on the highly prospective area between the VW Nickel deposit and the B4-7 deposit.

Results are pending.

Marc Sale, (BSC. Geology, Fellow AusIMM, member AIG) aΒ consultant to Landore Resources LimitedΒ Β and a qualified person as defined inΒ the CanadianΒ National Instrument 43-101, has reviewed and verified all scientific or technical mining disclosure contained in thisΒ announcement, which is stated in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum.

- ENDS -

For more information please contact:

Bill Humphries, Chairman

Richard Prickett, Chief Executive

Landore Resources Limited

Tel: 07734 681262Β 

Tel: 07775 651421Β 

www.landore.com

Simon Raggett

Strand Partners Limited

Tel: 020 7409 3494

David Bick

Tel: 07831 381201

This information is provided by RNS
The company news service from the London Stock Exchange
Β 
END
Β 
Β 
DRLEDLFFKVBLBBQ
Date   Source Headline
31st May 20177:00 amRNSFinal Results
17th May 20177:00 amRNSUpdate on BAM East Gold Project
7th Apr 20178:26 amRNSAward & Update on BAM East Gold Deposit
16th Mar 201710:00 amRNSIssue of Equity and Total Voting Rights
13th Mar 201710:20 amRNSHolding(s) in Company
13th Mar 201710:15 amRNSHolding(s) in Company
3rd Mar 201712:50 pmRNSFurther Subscription
3rd Mar 20177:30 amRNSLandore Resources raises C$3.3 million
17th Feb 20177:00 amRNSMAIDEN MINERAL RESOURCE ESTIMATE AND REPORT
23rd Jan 20177:00 amRNSUpdate on BAM East Gold Prospect
12th Jan 20177:00 amRNSUpdate on BAM East Gold Prospect
5th Dec 20167:00 amRNSUpdate on BAM East Gold Prospect
4th Nov 201612:00 pmRNSExercise of Options and Total Voting Rights
4th Nov 20167:00 amRNSNew Corporate Presentation
20th Oct 20167:00 amRNSUpdate on BAM East Gold Prospect
28th Sep 20167:00 amRNSInterim Results
21st Sep 20167:00 amRNSUpdate on BAM East Gold Prospect
5th Sep 20167:00 amRNSUpdate on BAM East Gold Prospect
3rd Aug 20167:00 amRNSUpdate on BAM East Gold Prospect
11th Jul 20167:00 amRNSOption agreement to sell Root Lake Property
23rd Jun 20167:00 amRNSAward of Share Options
21st Jun 201612:00 pmRNSIssue of Shares
21st Jun 201611:52 amRNSResult of AGM
10th Jun 20167:00 amRNSSubscription
17th May 20167:00 amRNSUpdate on BAM East Gold and Junior Lake Lithium
13th May 20167:00 amRNSFinal Results
4th Apr 20167:00 amRNSSignificant Gold Discovery - Junior Lake
14th Mar 20167:00 amRNSJunior Lake Update
18th Feb 20167:00 amRNSDrilling Results
10th Feb 20167:00 amRNSOption agreement to sell Root Lake Property
8th Dec 20157:00 amRNSJunior Lake Update
30th Nov 20157:00 amRNSAdditional Listing
11th Nov 20152:32 pmRNSHolding(s) in Company
30th Oct 20154:08 pmRNSSubscription
12th Oct 20157:00 amRNSJunior Lake - Mineral Potential Investigation
29th Sep 20157:00 amRNSInterim Results
21st Sep 20157:00 amRNSJunior Lake - Geophysics Review
4th Aug 201512:15 pmRNSHolding(s) in Company
7th Jul 20157:00 amRNSJunior Lake - Independent Review
30th Jun 20151:08 pmRNSResult of AGM / Change in Board positions
19th May 20157:00 amRNSFinal Results
13th Apr 20157:00 amRNSDrilling Results
23rd Mar 201511:03 amRNSChange of Broker
4th Mar 20153:40 pmRNSHolding(s) in Company
29th Jan 20157:00 amRNSJunior Lake Nickel-Copper Project Update
19th Dec 201412:02 pmRNSDirector's Dealing
19th Nov 20147:00 amRNSJunior Lake drilling results
23rd Sep 20147:00 amRNSInterim Results
15th Sep 20147:00 amRNSDrilling Results
19th Aug 20147:00 amRNSDrilling Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.