The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksKavango Resources Regulatory News (KAV)

Ben Turney, CEO, Kavango Resources will be presenting and taking live Q&A at focusIR Investor Webinar on 14th May. Please register here.

Share Price Information for Kavango Resources (KAV)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.175
Bid: 1.10
Ask: 1.25
Change: 0.00 (0.00%)
Spread: 0.15 (13.636%)
Open: 1.175
High: 1.175
Low: 1.175
Prev. Close: 1.175
KAV Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Option to acquire Zimbabwe gold project

26 Jun 2023 12:57

RNS Number : 9304D
Kavango Resources PLC
26 June 2023
 

PRESS RELEASE

 

26 June 2023

KAVANGO RESOURCES PLC

("Kavango" or "the Company")

Option to acquire Zimbabwe gold project

Kavango Resources plc (LSE:KAV), the Southern Africa focussed metals exploration company, is pleased to announce it has signed an exclusive 2-year option to acquire a producing gold exploration project in Matabeleland, southern Zimbabwe (the "Option").

The Nara Project comprises 45 contiguous gold claims (the "Claims"). Kavango believes the Nara Project has potential to host a bulk mineable gold deposit.

The Nara Project area has supported historic high-grade underground mining and continuous surface small-scale mining and custom milling over the last 30 years. This has generated approximately 150,000 to 250,000 tonnes of tailings (the "Tailings"), which present a separate opportunity for potential near-term revenue generation.

Under the terms of the Option, Kavango will have full access to the Nara Project area to conduct field due diligence, through a comprehensive exploration program. This program will include (but not be limited to) surface mapping and geochemistry, geophysics, surface drill testing, underground sampling, underground drill testing and assessing the commercial potential for processing the Tailings.

Kavango will complete its exploration program before deciding whether to exercise the Option to acquire the Nara Project.

Ben Turney, Chief Executive Officer of Kavango, commented:

"After extensive due diligence over the last 12 months, including 4 visits to Matabeleland, we are delighted to announce our first gold exploration project in Zimbabwe.

The greenstone belts in Zimbabwe host prospective rocks for bulk-mineable gold deposits, according to Kavango's internal review and analysis. Many of these belts share notable similarities with some of Australia's most prolific gold-producing regions.

Zimbabwe has a strong tradition of mining. However, exploration and investment has been severely limited over recent decades. In 1980, Zimbabwe produced more gold than Australia but the country has yet to experience the bulk-mining boom Australia did midway through that decade.

We believe this presents a significant opportunity for Kavango and a commercial discovery.

With the strong financial backing of Purebond, Kavango is now positioned to pursue the potential we have identified in Matabeleland alongside our portfolio in Botswana."

The Nara Project

The Nara Project includes 45 contiguous gold claims (10 hectares each in size) and covers four historic mines with total recorded historic production from underground workings of 92,000oz gold averaging 9.76g/t (from the early 1900s to the early 1960s). These historic mines also produced credits of tungsten and silver.

Given the extent of the project, its regional geological setting, the historic high-grade underground potential and the sustained small-scale mining activity, Kavango believes the Nara Project holds considerable prospective potential for a modern commercial gold operation.

Nara Project exploration plan

Kavango has prepared an exploration plan for the Nara Project, which will include (but not necessarily be limited to):

- Surveying the Tailings

- Assessment of the historic mine shaft and possible underground drilling and channel sampling (subject to safety)

- Soil geochemical surveying along the strike extent

- Scout drilling to test artisanal workings/shafts 

- Other drilling and surveying, as budget permits

Kavango will initiate its exploration program in the coming days.

Nara Project Option Terms

Kavango has entered a 2-year exclusive binding option to buy outright 45 gold claims in Matabeleland, Zimbabwe (the "Nara Project"). The 2-year option period will allow Kavango to perform an appropriate exploration program to assess the Nara Project's potential.

To exercise the Option, Kavango has agreed to pay the current claims holder (the "Vendor") US$4million cash (the "Acquisition Price").

Kavango has agreed to pay an option fee to the Vendor of up to US$220,000 over the 2-year option period, split into 4 individual payments of US$55,000 each payable at the start of each half year of the option period (the "Option Payments").

In the event Kavango exercises the Option, any Option Payments paid to the Vendor will be deducted from the Acquisition Price.

Kavango will commit to spend US$1million on exploration at the Nara Project over the 2-year option period, with a minimum exploration spend of US$500,000 in the first year. Should Kavango not exercise the Option, Kavango will turn over all exploration data to the current operator of the stamp milling operation at the Claims (the "Current Operator"), together with recommendations (where possible) on future development.

Kavango has the right to exercise the Option at its sole discretion, subject to the Company being up to date with the Option Payments and spending commitments. Kavango has the right to cancel the Option at any point during the option period and to exercise the Option at any time during the option period.

Performance Consideration

On declaration of a code-compliant (e.g. JORC or equivalent) gold resource containing in excess of 500,000 ounces of gold (inferred category or above) at the Nara Project by Kavango, the Company will pay the Vendor or his designate/s a payment in shares to a value of up to US$1million in shares in Kavango (the "Performance Consideration Shares").

The aggregate value of the Performance Consideration Shares will be calculated on the basis of the table below:

Resource size (number ounces contained Au in inferred or above resource category)

Performance Consideration shares to be issued to Vendor (in US$)

500,000oz

US$500,000

750,000oz

US$750,000

1,000,000oz or greater

US$1,000,000

The aggregate issue price of the Performance Consideration Shares shall be calculated based on stage gates using the following structure:

- First issue of one quarter of the Performance Consideration Shares shall be 1.8p per share 

- Second issue of one quarter of Performance Consideration Shares based on the closing price of shares traded in Kavango Resources Plc on the date six months after 23 December 2023;

- Third issue of one quarter of the Performance Consideration Shares based on the closing price of shares traded in Kavango Resources Plc on the date twelve months after 23 June 2024;

- Fourth issue of one quarter of the Performance Consideration Shares based on the closing price of shares traded in Kavango Resources Plc on the date 18 months after 23 December 2024.

 

Further information in respect of the Company and its business interests is provided on the Company's website at www.kavangoresources.com and on Twitter at #KAV.

THIS ANNOUNCEMENT CONTAINS INSIDE INFORMATION FOR THE PURPOSES OF ARTICLE 7 OF REGULATION 2014/596/EU WHICH IS PART OF DOMESTIC UK LAW PURSUANT TO THE MARKET ABUSE (AMENDMENT) (EU EXIT) REGULATIONS (SI 2019/310) ("UK MAR"). UPON THE PUBLICATION OF THIS ANNOUNCEMENT, THIS INSIDE INFORMATION (AS DEFINED IN UK MAR) IS NOW CONSIDERED TO BE IN THE PUBLIC DOMAIN.

Further information in respect of the Company and its business interests is provided on the Company's website at www.kavangoresources.com and on Twitter at #KAV.

For further information please contact:

Kavango Resources plc

Ben Turney

+46 7697 406 06

First Equity (Broker)

+44 207 374 2212

Jason Robertson

Kavango Competent Person Statement

The technical information contained in this announcement pertaining to geology and exploration have been read and approved by Brett Grist BSc(Hons) FAusIMM (CP). Mr Grist is a Fellow of the Australasian Institute of Mining and Metallurgy with Chartered Professional status. Mr Grist has sufficient experience that is relevant to the exploration programmes and geology of the main styles of mineralisation and deposit types under consideration to act as a Qualified Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'.

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
ACQBBGDLLUDDGXL
Date   Source Headline
21st Sep 20207:00 amRNSBotswana Strategic Joint Venture with Power Metals
8th Sep 20207:00 amRNS3D Model confirms KSZ Norilsk rock formations
6th Aug 20207:00 amRNSNew Petrology Report for KSZ, Botswana
24th Jul 20207:00 amRNSTR-1 Notification of holdings in the Company
23rd Jul 20201:46 pmRNSResult of Annual General Meeting
17th Jul 20207:00 amRNSConversion of Power Metals Convertible Loan Note
12th Jun 20207:00 amRNSKalahari Suture Zone Botswana, 3D modelling update
3rd Jun 20207:00 amRNSKalahari Copper Belt Prospecting Licences Granted
26th May 20207:00 amRNSResults for the year ended 31 December 2019
13th May 20207:00 amRNSExploration Plan - Kalahari Suture Zone, Botswana
1st May 20207:00 amRNSNew Corporate Presentation
29th Apr 20207:00 amRNSTR-1 Notification of holding in the Company
29th Apr 20207:00 amRNSMineral Systems Review of the KSZ, Botswana
23rd Apr 20207:00 amRNSOngoing project progress in Botswana, and Covid-19
15th Apr 20204:35 pmRNSIssue of loan notes to directors and managers
15th Apr 20207:00 amRNSFinancing and 51% sale of Ditau
17th Feb 20207:00 amRNSKalahari Copper Belt - Joint Venture signed
13th Feb 20207:00 amRNSResults of drilling undertaken on the KSZ Botswana
16th Dec 20197:00 amRNSPhase 1 drilling completed on the KSZ, SW Botswana
2nd Dec 20197:00 amRNSDrilling on KSZ identifies magma plumbing system
29th Nov 20197:00 amRNSSulphide mineralisation intersected on the KSZ
22nd Nov 20197:00 amRNSDrilling Progress on KSZ in SW Botswana
28th Oct 20197:00 amRNSUpdate on drilling - KSZ Project in SW Botswana
16th Oct 20194:15 pmRNSTR-1 Notification of holding in the Company
15th Oct 20197:00 amRNSDrilling started on the KSZ in SW Botswana
2nd Oct 20197:00 amRNSKSZ drilling programme to start early October
24th Sep 20197:00 amRNSKSZ conductors ready for drilling
16th Sep 20197:00 amRNSCarbonatite orientation programme at Ditau
2nd Sep 20197:00 amRNSKalahari Copper Belt - MOU signed
12th Aug 20197:00 amRNSDitau Q&A published on the Company's website
5th Aug 20197:00 amRNSInterim Results
2nd Aug 20197:00 amRNSDitau check assay results
18th Jul 20197:00 amRNSDitau assay results
15th Jul 20197:00 amRNSNew Licence acquired at Ditau, Botswana
1st Jul 20197:00 amRNSAppointment of Joint Corporate Broker
21st Jun 20197:00 amRNSResults of Annual General Meeting
5th Jun 20197:00 amRNSPhase 2 AEM survey: data processing results
16th May 20197:00 amRNSDrilling update at Ditau, KSZ Project, Botswana
15th May 20194:40 pmRNSSecond Price Monitoring Extn
15th May 20194:35 pmRNSPrice Monitoring Extension
30th Apr 20192:47 pmRNSResults for the year ended 31 December 2018
29th Mar 20194:00 pmRNSTR1 - Notification of major shareholdings
25th Mar 20197:00 amRNSDrilling update at Ditau, KSZ Project, Botswana
18th Mar 20197:00 amRNSPhase 2 Airborne Electromagnetic Survey completed
5th Mar 20197:00 amRNSAdditional Equity Placement
25th Feb 20197:00 amRNS£500,000 Equity Placement
28th Jan 20197:00 amRNSDrilling to commence in Botswana
21st Jan 20197:00 amRNSPhase 2 airborne EM survey mobilised in Botswana
10th Dec 20187:00 amRNSSignificant drill targets identified in Botswana
22nd Oct 20187:00 amRNSStrategic Licence acquisitions - Botswana

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.