The latest Investing Matters Podcast episode featuring financial educator and author Jared Dillian has been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBluejay Regulatory News (JAY)

Share Price Information for Bluejay (JAY)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.295
Bid: 0.28
Ask: 0.31
Change: -0.005 (-1.67%)
Spread: 0.03 (10.714%)
Open: 0.307
High: 0.307
Low: 0.295
Prev. Close: 0.30
JAY Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Pituffik Titanium Project Update

24 Aug 2016 07:00

RNS Number : 9478H
FinnAust Mining PLC
24 August 2016
 

Click on or paste the following link into your web browser to view the associated PDF:

 

http://www.rns-pdf.londonstockexchange.com/rns/9478H_-2016-8-23.pdf

 

FinnAust Mining plc / EPIC: FAM / Market: AIM / Sector: Mining

24 August 2016

This announcement contains inside information

 

FinnAust Mining plc ('FinnAust' or the 'Company')

2016 Work Programme Update, Pituffik Titanium Project, Greenland

 

FinnAust Mining plc, the AIM and FSE listed company with projects in Greenland, Finland and Austria, is pleased to announce that the 2016 field season at the Pituffik Titanium Project ('Pituffik' or 'the Project') is progressing well.

 

The 2016 programme in Greenland has several aspects to it as described in the summary below. Mainly, the Company is focused on defining both the grade and volume characteristics of Pituffik via the production of a JORC code compliant resource, with a particular emphasis on defining optimal "wet mining" areas. This is in line with the Company's strategy to undertake a "proof of concept" bulk sampling programme in 2017. 

Overview:

 

· Planned programme completed, initial findings supporting the Company's belief that Pituffik represents a globally significant titanium project

o Extensive trenching over main project areas has identified large volumes of ilmenite rich sand across many square kilometres

o Ground penetrating radar has identified buried layers of what is expected to be high concentrations of heavy minerals

o 260 holes completed on raised beach targets to date - all holes show significant horizons of ilmenite rich sands validating the production potential of these areas

o 150 offshore vibracore holes (designed to penetrate up to 3m) completed to date, drilled from support boat

o Reduced penetration in the Moriusaq Bay area by smaller second vibracore unit due to almost pure layers of ilmenite bearing sediments

 

· Large metallurgical sample en-route to process consultants

 

· Currently undertaking expanded programme due to completing planned program early - including infill drilling

 

· SRK Exploration Services ('SRK') competent person site visit completed, results will generate a JORC code compliant resource

 

· Environmental programme and initial baseline study finished with results, which are in line with expectations, being compiled ahead of submission of application for exploitation licence in Q1 2017

 

FinnAust CEO Roderick McIllree said, "Pituffik continues to exceed our expectations. After being on site for two weeks, I'm pleased with the progress and can see positive indications that we will uncover something of significant scale at this very pure titanium deposit in Greenland.

 

"Our field programme is being managed by a senior researcher at the Geological Survey of Greenland and Denmark ('GEUS') performing exactly as one would expect from such a well-recognised institution. I believe SRK gained a much better perspective of the Project from their visit to site and I look forward to working with them to deliver a maiden resource for the Project.

 

"We will provide further updates as we continue unlocking the inherent value we believe this Project holds. Updates are expected on metallurgical advances in the very near future."

 

Further Information

 

Pituffik is located within the broader "Thule black sand province" in North West Greenland, comprising coastlines several hundred kilometres long that contain both ilmenite and magnetite-rich regions. Within these regions are localised higher concentrations of ilmenite, and it is these areas that FinnAust is targeting. 

 

The Company has focused its attention on three primary target types along more than 30km of prospective coastline. These target areas are broken down into Raised, Active, and Drowned beach targets. The Company has identified two key project areas for focus moving forward, Moriusaq and Interlak. Moriusaq is most advanced and has returned the highest ilmenite grades to date, whilst Interlak offers the largest volume of heavy mineral sands with grade upside potential.

 

The 2016 field season, designed by GEUS in consultation with SRK, is mostly complete. The onset of favourable weather initially allowed the rapid deployment of personnel and commencement of operations.

 

Auger drilling, planned for the raised and active beaches, is proving an excellent tool to test the extensive near surface targets. Ilmenite rich sands have been intersected in all targets areas to date. These results will define deeper drilling targets for future work as is common in this type of coastal system.

 

In total to date 260 auger holes have been completed with more expected before season end. Thick Ilmenite rich sand has been intersected in every auger hole at Moriusaq (see figure 1 - See PDF link). Given that the programme was advanced earlier than expected, the Company expanded its programme to include infill drilling focused on the regional extent of raised beaches between Moriusaq and Interlak (±15km). As can be seen in both figure 1 and figure 2 (see PDF link) these raised beaches display significant horizons of ilmenite rich sands and remain a focus of the Company.

 

Figure 1: Auger sample from raised beach (black material is ilmenite rich sediments) - See PDF link

 

Extensive trenching and pitting has been completed on the very large-scale raised beaches at Interlak. Interlak comprises three target types with one additional very large tonnage delta target.

 

Figure 2: Initial trenching demonstrating ilmenite depositional models. Black banding is almost pure ilmenite; total depth of ilmenite bearing sediments is unknown. - See PDF link

 

Vibracoring (or vibrocoring) is a technology and a technique for collecting core samples of underwater sediments and wetland soils. Vibracore units have been deployed in both the "near shore" Moriusaq Bay as well as shallow marine areas immediately adjacent to the active beach zones. The smaller pontoon mounted vessel operating in Moriusaq Bay encountered reduced penetration due to almost pure & compacted layers of ilmenite bearing sediments and cobble.

 

An initial programme of 165 vibracore holes has been completed from the MV Kisaq vessel with interesting results obtained over almost all of the shallow marine areas targeted. Figures 3 and 4 (see PDF link) show typical black sand accumulations obtained from the larger vibracore unit. The Kisaq vessel is now tasked with reconnaissance holes around the Interlak area including sampling the Interlak delta.

 

Figures 3 & 4: Ilmenite rich black sand in vibracore stem from Kisaq. - See PDF link

 

**ENDS**

 

For further information please visit www.finnaust.com or contact:

 

Roderick McIllree

FinnAust Mining plc

+44 (0) 20 7907 9326

Graham Marshall

FinnAust Mining plc

+44 (0) 20 7907 9326

Ewan Leggat

SP Angel Corporate Finance LLP

+44 (0) 20 3470 0470

Laura Harrison

SP Angel Corporate Finance LLP

+44 (0) 20 3470 0470

Elisabeth Cowell

St Brides Partners Ltd

+44 (0) 20 7236 1177

Charlotte Heap

St Brides Partners Ltd

+44 (0) 20 7236 1177

 

 

Notes

FinnAust has a number of highly prospective licences at various stages of development in Greenland, Finland and Austria. The Company is dual listed on the London AIM market and Frankfurt Stock Exchange.

 

The Company is currently focussed on advancing the Pituffik project in Greenland, an area that has only recently revealed its mineral potential following changes in the climate. Pituffik, which FinnAust conditionally acquired in December 2015, has demonstrated the potential to be in the top percentile of projects worldwide in terms of heavy mineral grade. 

 

Pituffik comprises three main target areas along an >80km coastline historically proven to contain large and high-grade accumulations of primary ilmenite occurring as placer deposits in the following environments:

 

· Raised beaches; containing ilmenite accumulations over widths of more than 1km, of unknown depths, along more than 20km of coastline;

· Active beaches; which refer to the area seaward of the frontal dunes, including the beach, tidal zones and surf zone - historically samples from this area have achieved 70% ilmenite by weight; and

· Drowned beaches; refers to the areas seaward of active beaches.

 

The Company's strategy is focused on the production of a bulk sample "proof of concept" from the Pituffik project in 2017 with the aim of ultimately generating cash flow to create a company capable of self-funding exploration on future acquisitions.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCUOSVRNWAWUAR
Date   Source Headline
1st May 20247:00 amRNSAcquisition of Sedimentary Hosted Copper Project
29th Apr 202411:10 amRNSUpdate on Disko-Nuussuaq Ni-Cu-Co-PGE Project
19th Apr 20247:00 amRNSExpansion of Corporate Strategy
16th Apr 20247:00 amRNSDundas Ilmenite Resource Update
5th Apr 20247:00 amRNSIssue of Options
2nd Apr 20241:35 pmRNSChange to OTCQB Listing
9th Feb 202411:10 amRNSTermination of Employment of VP Exploration
7th Feb 20242:14 pmRNSHolding(s) in Company
5th Feb 20242:14 pmRNSResult of General Meeting
1st Feb 20241:28 pmRNSHolding(s) in Company
31st Jan 20247:00 amRNSTotal Voting Rights
17th Jan 20247:00 amRNSBluejay Raises £1.2 Million
16th Jan 20246:29 pmRNSResult of Placing
16th Jan 20244:35 pmRNSProposed Placing
11th Jan 20243:40 pmRNSHolding(s) in Company
22nd Dec 20237:00 amRNSDirector Dealing
21st Dec 20231:00 pmRNSReplacement - Board changes
20th Dec 20237:00 amRNSBoard changes
7th Dec 20231:58 pmRNSHolding(s) in Company
7th Dec 20231:45 pmRNSHolding(s) in Company
26th Oct 20237:00 amRNSBluejay to participate in EUR5.6M AIMEX Project
2nd Oct 20237:00 amRNSHammaslahti drilling - high-grade mineralisation
29th Sep 20237:00 amRNSInterim Results
29th Sep 20237:00 amRNSTotal Voting Rights
21st Sep 20237:06 amRNSVideo Interview Update
21st Sep 20237:03 amRNSResults of 2022 Field Programme at Disko-Nuussuaq
21st Sep 20237:00 amRNSDundas Ilmenite Project Update
6th Sep 20237:00 amRNSVideo Interview Update
31st Aug 20237:00 amRNSTotal Voting Rights
23rd Aug 20237:00 amRNSPlacing to raise £600,000
10th Aug 20233:13 pmRNSHolding(s) in Company
31st Jul 20235:16 pmRNSHolding(s) in Company
31st Jul 20239:30 amRNSVideo Interview Update
31st Jul 20238:44 amRNSMetals One Trading on Aim
31st Jul 20237:01 amRNSDirector Equity Subscriptions
31st Jul 20237:00 amRNSTotal Voting Rights
27th Jul 20232:57 pmRNSResult of General Meeting
24th Jul 20231:51 pmRNSFinland Strategy & Operational Update
24th Jul 20231:26 pmRNSBluejay to retain 100% of the Enonkoski Project
30th Jun 20234:45 pmRNSResults of Annual General Meeting
30th Jun 20237:00 amRNSPlacing and Operational Video Interview Update
29th Jun 20235:44 pmRNSFinal Results ended 31 December 2022
28th Jun 20237:00 amRNSPlacing and Operational Update
7th Jun 20237:00 amRNSNotice of Annual General Meeting
30th May 20237:00 amRNSDrilling Commences at Hammaslahti
12th May 20231:29 pmRNSAppointment of Sole Broker
26th Apr 20235:29 pmRNSTR-1: Notification of major holdings
25th Apr 20237:00 amRNSFinancing Update
13th Apr 202310:34 amRNSChange of Registered Office
28th Mar 20237:00 amRNSFollow Up Drilling Underway at Enonkoski

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.