The latest Investing Matters Podcast episode featuring Jeremy Skillington, CEO of Poolbeg Pharma has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksHighlands Natural Resources Regulatory News (HNR)

  • There is currently no data for HNR

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drilling Report

17 Jan 2006 07:00

Hardman Resources Limited17 January 2006 STOCK EXCHANGE / MEDIA RELEASE RELEASE DATE: 17 January 2006 AUSTRALIAN CONTACT: Peter Thomas Hardman Resources Ltd +61 8 9261 7600 LONDON CONTACT: Patrick Handley Brunswick Group +44 207 404 5959 RE: HARDMAN DRILLING PROGRAMME WEEKLY PROGRESS REPORT Hardman Resources Limited ("Hardman") provides the following progress report onits drilling activities: Uganda: Block 2 - Mputa-1 Wildcat Since the last report on 10 January the rig completed repairs and drilled thewell to total depth of 1,186 metres. The well encountered oil shows over twointervals within a deep objective and as of midnight on 16 January oil sampleshave been recovered from the upper interval, a sand of approximately 10 metresgross thickness at 965 metres. The sampling and pressure testing programme iscontinuing. Upon completion of the Mputa-1 exploration well operations, the rig will move tothe Waraga-1 location approximately 19 kilometres to the north-east of Mputa-1. Mputa-1 targeted a structural prospect defined by the 2005 seismic survey withpotential multiple objectives and in an area with surface oil seeps. Theresults of Mputa-1 provide confirmation of a working hydrocarbon system andconsiderable support for further evaluation of both this discovery and thesurrounding area where a number of other good prospects and leads have beenidentified. In this wildcat well the reservoir sands were poorer than expectedfor some of the objective levels but there is significant encouragement that thewell and seismic data can provide a better understanding of reservoir sanddistribution and considerably reduce the risk of other prospects. Further workwill be required before any comment can be made on the size or commercialsignificance of this discovery and the potential for future resource in thearea. The well location is 220 kilometres north-west of the capital Kampala andonshore 8 kilometres from Lake Albert. The location is 60 kilometres south-westof the Butiaba Waki-1 well (drilled in 1938) and 87 kilometres north-east of theTuraco exploration wells drilled by Heritage in 2002-2004. Hardman's CEO Mr Simon Potter commented: "This is a very encouraging result - even though there is still significantuncertainty about the size of Mputa and whether it has commercial potential,this well has confirmed the existence of a working petroleum system. It has beenan important step in reducing exploration risk in the basin and we are lookingforward to Waraga-1, the next well in the programme." Equities in Block 2 are: Block 2Hardman Petroleum Africa Pty Ltd (Operator) 50.0%Tullow Oil 50.0% Mauritania: PSC Area B, Block 4 - Dore-1 Exploration Well Since the last report on 12 January the 'Stena Tay' drilling rig completedoperations on the Zoule-1 well and moved to the Dore-1 exploration well locationin PSC B, Block 4. At midnight on 16 January the 'Stena Tay' was preparing tospud the well. The Dore prospect is located approximately 19 kilometres east of the Tiof field,and 30 kilometres north of the Chinguetti field in water depth of approximately386 metres. The well will be drilled to a proposed total depth of 2,388 metresand will target Oligocene aged submarine channel/turbidite sands as well asencountering the updip extension of the Tiof Miocene canyon system. Equities in PSC B are: PSC BWoodside Mauritania Pty Ltd (operator) 53.846%Hardman Chinguetti Production Pty Ltd 21.6%BG Group 11.63%Premier Oil Mauritania B Limited 9.231%ROC Oil Company 3.693% All reported depths (except water depth) are referenced to the rig rotary table(RT). Hydrocarbon shows will be only be reported after all required logs havebeen run and evaluated, although Hardman will release weekly updates on theexploration drilling campaign. Times and dates for Mauritania wells refer to GMT (Mauritania time), 8 hoursbehind Western Standard Time, Perth. Uganda time is GMT+3, 5 hours behindWestern Standard Time, Perth. PETER THOMASCHIEF FINANCIAL OFFICER Note: In accordance with Australian Stock Exchange Limited listing requirements,the geological information supplied in this report has been based on informationprovided by geologists who have had in excess of five years experience in theirfield of activity. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
5th Jan 20077:53 amRNSAllocation of Tullow Shares
2nd Jan 20077:01 amRNSUpdate to Substantial Holders
21st Dec 20067:00 amRNSSubstantial Holder Notice
20th Dec 20067:01 amRNSSuspension - Hardman Resource
20th Dec 20067:00 amRNSAcquisition Approved
20th Dec 20067:00 amRNSDirectors Notices
20th Dec 20067:00 amRNSASX Appendices 3B and 3X
20th Dec 20067:00 amRNSSchemeofArrangement Effective
19th Dec 20067:00 amRNSChange in Directors Interest
19th Dec 20067:00 amRNSCourt Approves Tullow Scheme
18th Dec 20067:00 amRNSShareholders Meeting Results
12th Dec 20068:24 amRNSASX Appendix 3Y
12th Dec 20067:00 amRNSMauritania Drilling Update
11th Dec 20067:41 amRNSASX Appendix 3B
7th Dec 20067:00 amRNSSubstantial Shareholder
5th Dec 20068:06 amRNSSubstantial Shareholding
5th Dec 20067:00 amRNSMauritania Drilling Update
1st Dec 20067:00 amRNSTrinidad Exploration Bid
24th Nov 20068:09 amRNSSubstantial Shareholding
21st Nov 20067:00 amRNSGuyane Farm Out Agreement
21st Nov 20067:00 amRNSMauritania Drilling Report
17th Nov 20067:00 amRNSSubstantial Shareholding
16th Nov 20069:08 amRNSCEO Exercises Phantom Shares
16th Nov 20067:00 amRNSDrilling Report
15th Nov 20067:00 amRNSHardman ExplanatoryMemorandum
14th Nov 20067:04 amRNSWell Test Update
14th Nov 20067:00 amRNSHardman Drilling Programme
7th Nov 20067:13 amRNSWell Test Update
7th Nov 20067:00 amRNSHardman drilling programme
2nd Nov 20067:00 amRNSNotice of Tullow Shareholding
1st Nov 20068:32 amRNSASX Appendix 3B
26th Oct 20067:43 amRNSSubstantial Shareholding
26th Oct 20067:00 amRNSQuarterly Report
24th Oct 20067:01 amRNSASX Appendix 3B
24th Oct 20067:01 amRNSMauritania Drilling Report
17th Oct 20067:00 amRNSMauritania Drilling Report
11th Oct 20067:01 amRNSMOU signed with Ugandan govt
11th Oct 20067:00 amRNSMOU signed with Ugandan Gov't
9th Oct 20067:00 amRNSNotice of Tullow Shareholding
9th Oct 20067:00 amRNSMauritania Drilling Report
6th Oct 20067:00 amRNSNotice of Tullow Shareholding
5th Oct 20067:00 amRNSSubstantial Shareholder
3rd Oct 20069:46 amRNSSubstantial Shareholding
3rd Oct 20067:00 amRNSMauritania Drilling Update
29th Sep 200610:44 amRNSASX Appendix 3B
26th Sep 20067:00 amRNSDrilling Report
25th Sep 20067:03 amRNSRecommended Offer for Hardman
25th Sep 20067:00 amRNSOffer for Hardman Resources
19th Sep 200611:15 amRNSLong-Term Performance Plan
19th Sep 20067:00 amRNSMauritania Drilling Report

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.