The latest Investing Matters Podcast episode featuring Jeremy Skillington, CEO of Poolbeg Pharma has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksHighlands Natural Resources Regulatory News (HNR)

  • There is currently no data for HNR

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drilling Report

3 Jan 2006 07:00

Hardman Resources Limited03 January 2006 STOCK EXCHANGE / MEDIA RELEASE RELEASE DATE: 3 January 2006 AUSTRALIAN CONTACT: Simon Potter Hardman Resources Ltd +61 8 9261 7600 LONDON CONTACT: Patrick Handley Brunswick Group +44 207 404 5959 RE: HARDMAN DRILLING PROGRAMME WEEKLY PROGRESS REPORT Hardman Resources Limited ("Hardman") provides the following progress report onits drilling activities: Uganda: Block 2 - Mputa-1 Wildcat Since the last report on 28 December the rig driveshaft was repaired andoperations recommenced on 31 December with the drilling of the 12 1/4 inch holeto 347 metres. Wireline logs were run prior to setting the 10 3/4 inch casing.The current operation at midnight, 2 January was preparing to run blowoutpreventers prior to drilling ahead to total depth. Mputa-1 will target a structural prospect with potential multiple objectives.The prospect was defined by the 2005 onshore seismic survey and oil seeps havebeen identified in the immediate area. The planned total depth is approximately 1,100 metres. The well location is 220kilometres north-west of the capital Kampala and onshore 8 kilometres from LakeAlbert. The location is 60 kilometres south-west of the Butiaba Waki-1 well(drilled in 1938) and 87 kilometres north-east of the Turaco exploration wellsdrilled by Heritage in 2002-2004. Equities in Block 2 are: Block 2Hardman Petroleum Africa Pty Ltd (Operator) 50.0%Tullow Oil 50.0% Mauritania: PSC Area C, Block 6 - Zoule-1 Exploration Well In the period since the last report on 28 December the 'Stena Tay' drilling rigcontinued operations on the Zoule-1 exploration well, drilling the 12 1/4 inchhole to 2,628 metres where the 9 5/8 inch casing was run and cemented. Thecurrent operation at midnight on 2 January was preparing to drill ahead in 8 1/2inch hole. Zoule-1 will target Cretaceous turbidite channel sands and has a planned totaldepth of 3,730 metres. The well is located in 783 metres of water approximately70 kilometres from the shore and 27 kilometres southeast of Pelican-1, aCretaceous gas discovery drilled in Block 7 in late 2003 (Hardman has a 16.2%interest in Block 7). Equities in Block 6 are: Block 6Hardman Petroleum (Mauritania) Pty Ltd 22.422%Woodside Mauritania Pty Ltd 37.578%ROC Oil (Mauritania) Company 5.000%Petronas Carigali Overseas Snd Bhd 35.000% All reported depths (except water depth) are referenced to the rig rotary table(RT). Hydrocarbon shows will be only be reported after all required logs havebeen run and evaluated, although Hardman will release weekly updates on theexploration drilling campaign. Times and dates for Mauritania wells refer to GMT (Mauritania time), 8 hoursbehind Western Standard Time, Perth. Uganda time is GMT+3, 5 hours behindWestern Standard Time, Perth. SIMON POTTERMANAGING DIRECTOR Note: In accordance with Australian Stock Exchange Limited listing requirements,the geological information supplied in this report has been based on informationprovided by geologists who have had in excess of five years experience in theirfield of activity. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
13th Dec 20057:00 amRNSDrilling Report
8th Dec 20057:00 amRNSDirector/PDMR Shareholding
6th Dec 20057:00 amRNSASX Appendix 3B
6th Dec 20057:00 amRNSDrilling Report
1st Dec 20058:46 amRNSTrading Halt
1st Dec 20058:39 amRNSSale by Woodside
30th Nov 20057:00 amRNSHardman Corporate Overview
29th Nov 20057:00 amRNSDrilling Report
24th Nov 20057:00 amRNSChairmans AGM Presentation
24th Nov 20057:00 amRNSResults from AGM
24th Nov 20057:00 amRNSAGM Presentation
22nd Nov 20057:00 amRNSDrilling Report
18th Nov 20057:00 amRNSDrilling Report
15th Nov 20057:00 amRNSASX Appendix 3B
15th Nov 20057:00 amRNSDrilling Report
8th Nov 20057:02 amRNSDrilling Report
4th Nov 20057:01 amRNSDirectorate Change
2nd Nov 20057:01 amRNSDrilling Report
1st Nov 20057:01 amRNSDrilling Report
28th Oct 20057:01 amRNSSept 2005 Quarterly Report
28th Oct 20057:01 amRNSDrilling Report
25th Oct 20057:01 amRNSDrilling Report
24th Oct 20057:01 amRNS2005 Annual Report
24th Oct 20057:01 amRNSNotice of AGM
18th Oct 20057:01 amRNSDrilling Report
11th Oct 20057:01 amRNSDrilling Report
6th Oct 20057:01 amRNSChange in Financial/Tax Year
5th Oct 20057:01 amRNSASX Appendix 3B
4th Oct 20058:05 amRNSNotice of Directors Interest
4th Oct 20057:00 amRNSMauritania Drilling Update
4th Oct 20057:00 amRNSDrilling Report Mauritania
30th Sep 20057:03 amRNS2005 Annual General Meeting
27th Sep 20057:03 amRNSDrilling Report
26th Sep 20057:03 amRNSDrilling Report
22nd Sep 20057:04 amRNSOpen Briefing
22nd Sep 20057:04 amRNS2005 Annual Results
21st Sep 20057:01 amRNSSubstantial Shareholder
21st Sep 20057:01 amRNSSimon Potter Presentation
20th Sep 20057:04 amRNSDrilling Report
13th Sep 20057:04 amRNSDrilling Report
6th Sep 20057:05 amRNSDrilling Report
31st Aug 20058:58 amRNSASX Appendix 3B
30th Aug 20057:02 amRNSDrilling Report
24th Aug 20058:47 amRNSDrilling Report
17th Aug 20057:01 amRNSASX Appendix 3B
16th Aug 20055:51 pmRNSDrilling Report
16th Aug 20057:00 amRNSDrilling Report
15th Aug 20057:51 amRNSASX Appendix 3B
11th Aug 20057:02 amRNSASX Appendix 3B
10th Aug 20057:02 amRNSDirectorate Change

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.