focusIR May 2024 Investor Webinar: Blue Whale, Kavango, Taseko Mines & CQS Natural Resources. Catch up with the webinar here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksHGM.L Regulatory News (HGM)

  • There is currently no data for HGM

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

HGML Results Announcement

23 Jan 2012 07:01

RNS Number : 9623V
Highland Gold Mining Limited
23 January 2012
 



HIGHLAND GOLD INCREASES RESOURCE BASE AFTER JORC COMPLIANT AUDIT AT THE UNKURTASH PROJECT IN KYRGYZSTAN

 

23 January 2012 - Highland Gold Mining Limited ("Highland Gold", or the "Company") is pleased to announce results from an initial JORC compliant resource audit carried out at the Company's Unkurtash project by the independent consultancy IMC Montan in November and December 2011. The audit results support the Company's previously GKZ-registered C1+C2 reserves and increase the Company's total JORC compliant mineral resource base as stated in the Company's Annual Report & Accounts 2010 by 23%.

 

The Unkurtash project includes three distinct prospects: the Unkurtash, Sarytube and Karatube located within the Company's two licenses Unkurtash-Andagul (12 km2) and Kassan (51 km2). The combined mineralised zone measures approximately 4,000 metres on strike, ranges from 250-500 metres in width and has a potential vertical extent of at least 350 metres. Intrusion-hosted stockwork type gold mineralisation characterises Unkurtash and Sarytube, while gold at Karatube is associated with skarn-type mineralisation. Previous test work has indicated favourable metallurgy and gold recovery levels via conventional processing methods.

 

Mineral Resources Reported in Accordance with JORC

Prospect

Resource Category

Ore['000 tonnes]

Average Grade[g/t]

Contained Gold[kg]

Contained Gold[ounces]

Unkurtash(0 - 250 m)

Measured

13582.64

1.77

24074.27

774,092

Indicated

13607.56

1.67

22706.3

730,106

Measured+Indicated

27190.20

1.72

46780.57

1,504,198

Inferred

2328.43

1.36

3157.85

101,539

Total Resources

29518.63

1.69

49938.42

1,605,737

Resource Category

Ore['000 tonnes]

Average Grade[g/t]

Contained Gold[kg]

Contained Gold[ounces]

Karatube

Measured

2363.03

2.25

5317.16

170,970

Indicated

886.98

2.04

1805.28

58,048

Measured+Indicated

3250.01

2.19

7122.44

229,017

Inferred

126.69

0.98

123.68

3,977

Total Resources

3376.7

2.15

7246.12

232,994

 

(Resource calculation based on a minimum grade of 0.8 g/t per cell in block model)

 

For the Unkurtash prospect the current resource audit extends to a depth of approximately 250 metres from surface and does not include exploration results obtained in 2011 from deep drilling up to a depth of 450 metres from surface as well as results from ongoing systematic underground exploration at the 1640 metre horizon (above sea level). Results from these deeper levels have the potential to substantially enlarge the currently defined resource base and will be included in a JORC compliant resource update planned for H2 2012.

 

A JORC compliant resource audit for the Sarytube prospect (the third at the Unkurtash project) is underway and planned to be completed in Q1 2012. Based on the results of 29,000 metres of drilling completed in 2011 expected mineral resources for Sarytube are approximately 1 Moz at an average grade of approximately 1.8 g/t.

 

In 2011 the Company completed a substantial exploration programme at the project including a total of more than 53,000 metres of drilling and 1,800 metres of exploration underground development. While the Company has initiated engineering studies towards development of a large open-pit operation additional exploration drilling and underground development is planned to continue throughout 2012 with the objective of substantially enlarging the currently defined mineral resources at Unkurtash.

 

IMC Montan (International Economic and Energy Consulting) consultants Mr. Neil Scott (Member of the Institution of Materials, Minerals and Mining; Bachelor of Science; Certified Engineer) and Mr. John Bacharach (Fellow of the Institution of Materials, Minerals and Mining; Associate of the Royal School of Mines; Bachelor of Science; Certified Engineer) have provided and verified information contained in this release with respect to drilling and resource / reserves. They are qualified as Competent Persons as defined in the 2004 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves.

 

For further information please contact:

Highland Gold

Dmitry Yakushkin, Head of Communications + 7 495 424 95 21

Duncan Baxter, Chairman + 44 (0) 1534 814 202

Numis Securities Limited

Alastair Stratton / Stuart Skinner, Corporate Finance -

+44 (0) 207 260 1000

James Black, Corporate Broking - +44 (0) 207 260 1000

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCDBLFLLFFXBBV
Date   Source Headline
17th Nov 20205:48 pmRNSCOMPULSORY ACQUISITION OF OUTSTANDING SHARES
3rd Nov 20205:10 pmRNSOFFER EXTENDED
29th Oct 20207:05 amRNSHolding(s) in Company
29th Oct 20207:00 amRNSQ3 2020 Operating Results
28th Oct 202011:55 amRNSHolding(s) in Company
26th Oct 20209:38 amRNSHolding(s) in Company
23rd Oct 20208:38 amRNSHolding(s) in Company
22nd Oct 202012:04 pmBUSForm 8.3 - HIGHLAND GOLD MINING LTD
21st Oct 20205:30 pmRNSHighland Gold Mining
21st Oct 20205:30 pmRNSCancellation of Trading on AIM
21st Oct 20202:03 pmBUSForm 8.3 - Highland Gold Mining
21st Oct 20201:45 pmRNSDirectorate Changes
21st Oct 20201:34 pmBUSForm 8.3 - HIGHLAND GOLD MINING LTD
21st Oct 202011:43 amRNSDirector/PDMR Shareholding
21st Oct 202011:21 amRNSForm 8.3 - Highland Gold Mining Ltd
21st Oct 202010:36 amRNSForm 8.5 (EPT/NON-RI)
21st Oct 20208:52 amRNSForm 8.3 - Highland Gold Mining Ltd
20th Oct 20205:45 pmRNSOFFER DECLARED WHOLLY UNCONDITIONAL
20th Oct 202012:52 pmPRNForm 8.3 - Highland Gold Mining Ltd
20th Oct 202011:39 amBUSForm 8.3 - HIGHLAND GOLD MINING LTD
20th Oct 202010:53 amRNSForm 8.5 (EPT/NON-RI)
20th Oct 20208:34 amRNSForm 8.3 - Highland Gold Mining Ltd
20th Oct 20208:29 amRNSForm 8.5 (EPT/RI)
20th Oct 20207:00 amRNSHolding(s) in Company
19th Oct 202012:38 pmPRNForm 8.3 - Highland Gold Mining Ltd
19th Oct 202011:46 amRNSForm 8.5 (EPT/NON-RI)
19th Oct 202010:15 amBUSForm 8.3 - Highland Gold Mining Ltd
19th Oct 20208:53 amRNSForm 8.3 - Highland Gold Mining Ltd
19th Oct 20208:52 amRNSForm 8.5 (EPT/RI)
16th Oct 202011:11 amBUSForm 8.3 - HIGHLAND GOLD MINING LTD
16th Oct 20209:27 amRNSForm 8.5 (EPT/RI)-Amendment
16th Oct 20208:33 amRNSForm 8.5 (EPT/RI)
15th Oct 202010:22 amBUSFORM 8.3 - HIGHLAND GOLD MINING LTD
15th Oct 20209:22 amRNSForm 8.5 (EPT/RI)
14th Oct 202010:41 amBUSForm 8.3 - HIGHLAND GOLD MINING LTD
14th Oct 20209:28 amRNSForm 8.5 (EPT/RI)
14th Oct 20208:32 amRNSForm 8.5 (EPT/NON-RI)
13th Oct 20205:07 pmPRNForm 8.3 - DD Highland Gold 13102020
13th Oct 20201:49 pmBUSForm 8.3 - Highland Gold Mining
13th Oct 202012:18 pmBUSForm 8.3 - Highland Gold Mining Ltd
13th Oct 20209:35 amRNSForm 8.5 (EPT/NON-RI)
13th Oct 20209:21 amRNSForm 8.5 (EPT/RI)
12th Oct 20203:05 pmRNSForm 8.3 - Highland Gold Mining Ltd
12th Oct 202012:14 pmPRNForm 8.3 - Highland Gold Mining Ltd
12th Oct 202011:21 amBUSFORM 8.3 - HIGHLAND GOLD MINING LTD
12th Oct 202010:15 amRNSForm 8.5 (EPT/NON-RI)
12th Oct 20209:49 amRNSForm 8.3 - Highland Gold Mining Ltd
12th Oct 20209:46 amRNSForm 8.5 (EPT/RI)
12th Oct 20208:20 amRNSForm 8.3 - Highland Gold Mining Ltd
12th Oct 20207:00 amRNSForm 8.3 - [Highland Gold Mining Ltd]

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.