Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksGalileo Resourc Regulatory News (GLR)

Share Price Information for Galileo Resourc (GLR)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.20
Bid: 1.15
Ask: 1.25
Change: 0.00 (0.00%)
Spread: 0.10 (8.696%)
Open: 1.20
High: 1.20
Low: 1.20
Prev. Close: 1.20
GLR Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Glenover Phosphate - update

1 May 2018 09:51

RNS Number : 7166M
Galileo Resources PLC
01 May 2018
 

 

 

 

01 May 2018

Galileo Resources Plc

("Galileo" or "the Company")

Glenover Phosphate-Update

 

Galileo (AIM: GLR) is pleased to announce that further to the Heads of Agreement ("Heads") announced 5 February 2018, negotiations with a major phosphate/fertiliser producer ("MPP") are continuing positively to finalising a Definitive Supply agreement ("DSA") to supply, for up to 15 years, raw phosphate rock ("Phosphate Rock") in the form of flotation concentrate from the Glenover phosphate project (the "Project"). In this regard, MPP has progressed the Conditions Precedent testwork, stipulated in the Heads, with results to date MPP deem satisfactory. MPP expect to complete over the next two months a remaining Condition Precedent, namely the production of a 30-tonne bulk sample of phosphate rock for further testing in its fertiliser process. The Project is located in the Limpopo Province of the Republic of South Africa.

 

The Company also announces, that Glenover's Environmental Impact Assessment/Management Programme ("EIA/EMP") in relation to its application for a mining right, which application was accepted (announced 5 February 2018) by the Department of Mineral Resources ("DMR") is progressing on schedule: draft version of the EIA/EMP has been submitted to interested and affected parties for comment (closing date 18 May 2018) before final submission of the EIA/EMP, expected on 26 May 2018, to the DMR.

 

Highlights

 

· All criteria to facilitate the Project towards the objective of commencing production continue to be met

 

· Negotiations continue positively with MPP on a DSA for long term (minimum 15 years) supply of Phosphate Rock

 

· Testwork, a Condition Precedent by MPP, to confirm suitability of the Phosphate Rock for its phosphate/fertilsier process has progressed with positive results to date acceptable to MPP.

 

· A final Condition Precedent to test a bulk 30-tonne sample of phosphate rock in MPP's process is scheduled over the next two months

 

· The EIA/EMP for the Project in terms of the Mining Right Application remains on schedule: draft EIA/EMP has been submitted to interested and affected parties for comment (closing date 18 May 2018) and final submission to DMR is expected 26 May 2018

 

· Rare-earths (and niobium) in the tailings of any future processing of Phosphate Rock by MPP, would be available to Glenover for recovery and further beneficiation

 

· On successful grant of a Mining Right, Galileo will increase its beneficial interest in the Project to 38% from current 36%

 

Colin Bird CEO commented: " We are happy to be able to report that negotiations with the MPP on all matters relating to the defintive supply (offtake) agreement, an important hurdle,for the Project, are continuing positively towards execution. The EIA/EMP for the Project is on schedule for submission to the DMR on 26 May 2018. I am pleased to say that we continue to meet all the criteria to facilitate our aim to commence production from the Project. We will keep the market advised of progress on the Project.

Editor's Note

The Heads included the following material terms:

- MPP requires further pilot scale work to determine the suitability of the Phosphate Rock in its process as one of the main conditions precedent, and further capital expenditure by the MPP for the second phase pilot scale test work will be subject to the Parties agreeing on the main commercial terms in the Heads (These have been agreed);

- The Flotation Plant will be built at the mine site and funded and owned by Glenover;

- The MPP will purchase Glenover Phosphate Rock (33% P2O5 content) at international market prices;

- The Heads is subject, among others, to the second phase of Investigation comprising technical and pilot plant work, including the production of 30 tonnes Phosphate Rock for piloting by MPP (this remains outstanding) , being successful and to the incorporation of the terms of the Heads into a Definitive Supply agreement ("Condition Precedent"); and

- The termination date of the Heads is 30 April 2018 or the signature date of the Definitive Supply Agreement, which (ever) is earlier

The above Conditon Precedent is expected to be carried out by MPP over the next two months. Therefore the time-lines above for concluding the Heads/Definitive Supply Agreement has been agreed to extend to 30 June 2018 in order to facilitate fulfilling this Condition Precedent.

 

 

The Glenover Project 

 

The Project is located approximately 90 km northwest of the town of Thabazimbi in the Waterberg region of Limpopo Province in the Republic of South Africa. The Project comprises an inactive phosphate mine comprising a SAMREC compliant 10.37 million tonnes (Mt) grading 18.73% phosphate (P2O5) including an inferred 2.685 Mt surface stockpiles of phosphate ore grading 22.21 %P2O5 and a measured and indicated 7.4 Mt grading 17.51 %P2O5 in an apatite (phosphate mineral)- breccia core remaining in the previously mined open pit. The open pit is approximately 100 metres deep with a surface width of approximately 200 metres.

 

Glenover Phosphate Resource (SAMREC compliant) 1

Resource

Resource

Tonnage

P2O5

 

Class

Mt

(%)

Apatite-Haematite Breccia

Measured

 

 

Indicated

7.407

17.57

Total Measured & Indicated

7.407

17.57

Inferred

0.274

15.83

 

 

 

 

Surface Stockpiles

Inferred

2.685

22.21

Total

Measured indicated & inferred

10.37

18.73

1 Data contained in the Preliminary Economic Assessment (PEA) referred to in RNS announcement of 07 March 2013 "Results of Glenover PEA"

 

Further details as set out in past announcements are available from the Company's website, www.galileoresources.com, which details the Company's project portfolio as well as a copy of this announcement:

 

You can also follow Galileo on Twitter: @GalileoResource

 

 

 

 

Technical Sign-Off

Andrew Sarosi, Director of Galileo, who holds a B.Sc. Metallurgy and M.Sc. Engineering, University of Witwatersrand and is a member of the Institute of Materials, Minerals and Mining, is a "qualified person" as defined under the AIM Rules for Companies and a competent person under the reporting standards. The technical parts of this announcement have been prepared under Andrew's supervision and he has approved the release of this announcement.

 

ENDS

 

This announcement contains inside information for the purposes of Article 7 of EU Regulation 596/2014.

 

For further information, please contact:

 

Galileo Resources PLC

 

Colin Bird, Chairman

 

 

Tel +44 (0) 20 7581 4477

Andrew Sarosi, Executive Director

 

Tel +44 (0) 1752 221937

Beaumont Cornish Limited - Nomad and Joint Broker

Roland Cornish/James Biddle

 

Tel +44 (0) 20 7628 3396

Novum Securities Limited - Joint Broker

Colin Rowbury/Jon Belliss

 

 

Tel +44 (0) 20 7399 9400

 

Technical Glossary:

 

Inferred Mineral Resource: that part of a Mineral Resource for which volume or tonnage, grade and mineral content can be estimated with only a low level of confidence. It is inferred from geological evidence and sampling and assumed but not verified geologically or through analysis of grade continuity. It is based on information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that may be limited in scope or of uncertain quality and

reliability.

 

Indicated Mineral Resource:  that part of a Mineral Resource, for which tonnage, densities, shape, physical characteristics, grade and mineral content can be estimated with a reasonable level of confidence. It is based on information from exploration, sampling and testing of material gathered from locations such as outcrops, trenches, pits, workings and drill holes. The locations are too widely or inappropriately spaced to confirm geological or grade continuity but are spaced closely enough for continuity to be assumed.

 

Measured Mineral Resource: that part of a Mineral Resource for which tonnage, densities, shape, physical characteristics, grade and mineral content can be estimated with a high level of confidence. It is based on detailed and reliable information from exploration, sampling and testing of material from locations such as outcrops, trenches, pits, workings and drill holes. The locations are spaced closely enough to confirm geological and grade continuity.

 

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
UPDLIFSTEDILIIT
Date   Source Headline
2nd Sep 201510:19 amRNSTotal Voting Rights
28th Aug 20157:00 amRNSExtension of Agreement to sell Interest in JV
20th Aug 201512:27 pmRNSHolding(s) in Company
5th Aug 20157:00 amRNSIssue of Equity
11th May 20151:49 pmRNSExtension of JV Sale Agreement
7th May 201511:53 amRNSHolding(s) in Company
14th Apr 20153:13 pmRNSHolding(s) in Company
20th Mar 20157:00 amRNSAppointment of Joint Broker
11th Mar 201512:07 pmRNSDirector Share Purchases
27th Feb 20155:11 pmRNSTotal Voting Rights
13th Feb 20151:51 pmRNSResult of General Meeting & Capital Reorganisation
29th Jan 20153:04 pmRNSFunds Raised by Way of Placing
28th Jan 20153:37 pmRNSProposed Reorganisation of Share Capital
28th Jan 20153:08 pmRNSPotential sale of interest in Joint Venture
3rd Nov 201410:07 amRNSAppointment of Joint Broker
30th Oct 201410:42 amRNSBrian Gavin
30th Sep 201412:08 pmRNSResults of AGM
8th Sep 20143:33 pmRNSFinal Results
21st Jul 20147:00 amRNSNevada Gold Copper Property Package Consolidated
2nd Jun 20149:46 amRNSTotal Voting Rights
15th May 20147:00 amRNSAcquisition of St Vincent Minerals Completes
8th May 20149:31 amRNSUpdate on acquisition and admission to trading
2nd May 20142:18 pmRNSDisposal
28th Apr 201411:36 amRNSUpdate Proposed Acquisition Gold-Copper Property
9th Apr 20147:00 amRNSAppointment of Joint Broker
3rd Mar 20147:00 amRNSGlenover Project Moves Closer to Development
4th Feb 20147:00 amRNSAcquisition of Gold-Copper Property in USA
20th Dec 20137:00 amRNSHalf Yearly Report
30th Sep 20131:53 pmRNSResult of AGM
2nd Sep 20132:05 pmRNSFinal Results and Notice of AGM
30th May 20137:00 amRNSGlenover Strategic Update
22nd Mar 20133:28 pmRNSDirector/PDMR Shareholding
7th Mar 20137:00 amRNSResults of Glenover PEA
20th Feb 201310:44 amRNSTotal Voting Rights
30th Jan 20137:00 amRNSNkombwa Hill: Exploration Defines Additional Area
23rd Jan 20134:01 pmRNSDirector resignation
11th Jan 20137:00 amRNSNkombwa Hill Acquisition - Legal DD Completed
17th Dec 20127:00 amRNSHalf Yearly Report
10th Dec 20127:00 amRNSGlenover Rare Earth Project - PEA Update
10th Sep 20127:00 amPRNDue Dilligence Update on Rare Earth Opportunities
3rd Sep 201211:40 amPRNResult of AGM
21st Aug 20127:00 amPRNDirector Appointment and Board Change
16th Aug 20127:00 amPRNAward of PEA of Glenover RE Project
7th Aug 20127:00 amRNSFinal Results
31st Jul 20123:44 pmPRNTotal Voting Rights
25th Jul 20127:00 amPRNGalileo signs a Heads of Agreement with REI
4th Jul 20124:56 pmPRNGalileo Share Placing and Share Exchange
17th Apr 20127:00 amRNSResource Statement
12th Mar 201212:19 pmPRNDirectorate Change
2nd Mar 20127:00 amPRNGlenover Rare Earth Project Drilling Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.