Sapan Gai, CCO at Sovereign Metals, discusses their superior graphite test results. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksFEES.L Regulatory News (FEES)

  • There is currently no data for FEES

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

FGC Announces 9M2021 IFRS Results

26 Nov 2021 09:05

RNS Number : 7244T
Federal Grid Co of Unified Engy Sys
26 November 2021
 

 

 

 

 

Rosseti FGC (Federal Grid Company) Announces

IFRS Results for the 9 months of 2021

 

Moscow, November 26, 2021 - Federal Grid Company of Unified Energy System ("Federal Grid Company" or "Company"; Moscow Exchange and LSE: FEES), part of PJSC ROSSETI Group, and the operator of the Unified National Electricity Grid ("UNEG") of Russia, announces its condensed unaudited consolidated interim financial results for the three and nine months ended 30 September 2021 under the International Financial Reporting Standards (IFRS).

 

The statements cover Federal Grid Company and its subsidiaries (the "Group").

 

Financial results:

 

· Revenue: RUB 185.7 billion (9M2020: RUB 176.2 billion)

· Adjusted EBITDA[1]: RUB 107.7 billion (9M2020: RUB 104.0 billion)

· Net profit: RUB 54.7 billion (9M2020: RUB 58.5 billion)

 

Operational performance highlights[2]:

 

· Electricity supply from UNEG to consumers: 421.4 billion kWh (9M2020: 392.6 billion kWh)

· Connected capacity: 1.9 GVA (9M2020: 1.7 GVA)

· Number of substations (UNEG)[3]: 889 units (9M2020: 886 units)

· Total transformer capacity: 352 GVA (9M2020: 352 GVA)

· Transmission grid length: 149.2 thousand km (9M2020: 148.2 thousand km).

 

Key events:

 

· The Kochubeevskaya Wind Farm, Russia's largest wind power generation facility with a capacity of 210 MW, has its utilities connected to the UNEG.

· Two compressor stations of "Power of Siberia" pipeline in Yakutia and Amur region (No. 4 and No. 7) have been connected to the electrical supply system.

· The construction of a new 330 kW Kola-Karelia transit line (1,050 km) has entered its final stage.

· The construction site of Amur Gas Chemical Complex has been connected to the grid.

· A new 250-km power transit line has been put into operation in the Primorsky Territory.

· The construction of a unique high-temperature superconductor power transmission line has started in St. Petersburg.

· For the first time in the Russian transmission network, backup power supply systems on Li-ion accumulators have been installed in Svarochnaya 220 kV substation.

· The new Medveditsa solar power plant in the Volgograd region has been connected to the national grid.

· The redesign of the North Causasus grid's oldest Mashuk 330kV substation has been completed.

· Implementation of RES generators has started in order to improve the efficiency of transmission substations.

· Standard and Poor's credit rating agency upgraded its assessment of PJSC FGC UES creditworthiness by one notch (from "bb+" to "bbb-").

· In the north of the Astrakhan region, the final stage has begun for the construction of Zubovka 220 kV highly automated substation to be connected to five wind power plants.

· A new power transit line for the BAM and TRANSSIB power supply has been put into operation in the Primorsky territory.

· Bonds worth RUB 10 billion were placed at a coupon rate of 7.5 percent, term to offer - 7 years.

 

After the reporting date:

· The national rating agency ACRA has confirmed the rating of the Federal Grid Company and its bonds at the maximum level of AAA (RU) on the national scale.

 

Financial results for the nine months ended 30 September 2021:

Financial indicator

9m2021

9m2020

Change

 

bln RUB

bln RUB

%

Revenue

185.7

176.2

5.4

Operating expenses

(123.4)

 (112.2)

10.0

Adjusted EBITDA

107.7

 104.0

3.6

Net profit

54.7

 58.5

(6.5)

Net debt

181.1

 196.9[4]

(8.0)

 

Operating expenses

Financial indicator

9m2021

9m2020

Change

 

bln RUB

bln RUB

%

Amortization

33.6

30.2

11.3

Electricity purchased for losses compensation

31.5

26.5

18.9

Fuel for mobile gas-turbine electricity plants

0.6

0.02

+30х

Taxes and fees

11.0

10.3

6.8

Transit of electricity

1.3

1.7

(23.5)

Subcontractor services for construction contracts

2.6

1.6

62.5

Other operating expenses

42.8

41.9

2.2

Total operating expenses

123.4

112.2

10.0

 

The Group showed stable financial and economic performance in the nine months ended 30 September 2021.

 

The main factors behind changes in financial indicators are as follows:

- increase in revenue from power transmission increased due to increase in tariffs from July 1, 2020 and from July,1 2021 by 5.5% in both cases and increase of volume of services.

- decrease in revenue from technological connection services is associated with the service schedule determined by customers' applications.

- increase in revenue from construction services is due to a change in the percentage of completion of work at different stages of construction of projects implemented by subsidiaries of Federal Grid Company under general contracting agreements.

- increase of operating expenses due to increase of electricity consumption (growth of expenses for electricity purchased for losses compensation by RUB 5.0 billion due to increase in volume losses and higher weighted average price for the electricity purchased for production needs) and increase in expenses on construction projects commensurate with an increase in revenue (by RUB 1.0 billion).

 

Federal Grid Company's condensed unaudited consolidated interim IFRS financial statements for the three and nine months ended September 30, 2021 are available on the Company's corporate website at

https://www.fsk-ees.ru/eng/investors/financial_disclosure/ifrs_financial_reports/.

* * *

For more information:

PJSC FGC UES

Yulia Martynova, IR +7(495) 995 5333 (ext. 3834)

Martynova-YS@fsk-ees.ru

 

Anna Ivanko, IR +7(495) 995 5333 (ext. 5470)

Ivanko-AA@fsk-ees.ru

 

 

 

 

 

[1]Adjusted EBITDA is calculated as EBITDA (profit for the period before income tax, financial income and expenses, depreciation and amortization), excluding revenue from connection services, cost of provisioning for expected credit losses, changes in estimated liabilities and including financial income.

[2]PJSC "FGC UES".

[3] Including rented transmission lines and substations.

 

[4] The net debt is stated as of 31.12.2020

 

 

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
QRTFESSAMEFSEDF
Date   Source Headline
16th Jul 20128:39 amRNSFederal Grid Board Cancels EGM
11th Jul 20127:00 amRNSTransfer of HMRSK's Executive Powers to Fed Grid
3rd Jul 20127:29 amRNSFedGrid Board Re-elects E.Ferlenghi as Chairman
2nd Jul 201210:39 amRNSFederal Grid Announces AGM Results
2nd Jul 20129:48 amRNSFederal Grid Company Publishes 2011 Annual Report
31st May 20123:45 pmRNSSecond Price Monitoring Extn
31st May 20123:40 pmRNSPrice Monitoring Extension
28th May 20128:40 amRNSFederal Grid Announces AGM and EGM
22nd May 20129:52 amRNSFTS confirms FedGridCo 2012-2014 RAB tariffs
17th May 20129:22 amRNSEnergy Ministry Approves FedGrid 2012-2014 InvProg
15th May 20127:25 amRNSMRSKH Executive Powers Transferred to FedGrid
11th May 20125:36 pmRNSManagement to be transferred to FGC
8th May 20123:45 pmRNSSecond Price Monitoring Extn
8th May 20123:40 pmRNSPrice Monitoring Extension
3rd May 20122:31 pmRNSFederalGrid Announces Q12012 RAS Financial Results
25th Apr 201212:10 pmRNSFederal Grid Places RUB10bn Series 12 Bond at 8.1%
23rd Apr 20127:36 amRNSAnnual Financial Report
23rd Apr 20127:28 amRNSFederal Grid announces 2011 IFRS results
16th Apr 20127:33 amRNSNotice of Results
23rd Mar 20129:15 amRNSFedGrid: Registration of Report on Share Issue
20th Mar 20127:00 amRNSFedGrid Company's FY2011 fin. results under RAS
6th Feb 20128:38 amRNSFederal Grid Reports Results of New Share Issue
28th Dec 20117:25 amRNSResults of Pre-Emptive Purchase of NewIssuedShares
28th Dec 20117:10 amRNSNew Appointment to Strategy Committee
28th Dec 20117:00 amRNSManagement Board Change
8th Dec 20111:21 pmRNSFedGridCo closed the order book of the bond issue
1st Nov 20118:00 amRNSFederal Grid Company announces Q3 2011 RAS results
19th Oct 20117:40 amRNSFed Grid Company announces 1H 2011 IFRS results
17th Oct 20117:00 amRNS1H 2011 results and conference call notice
3rd Oct 20117:08 amRNSIssue of Equity
19th Sep 20117:00 amRNSNotice of results for the six months
12th Aug 20117:00 amRNSResults of the Meeting of the Board of Directors
4th Aug 20118:00 amRNS1H 2011 Financial results
1st Aug 201112:00 pmRNSNon-executive Director assumes role of Chairman
1st Aug 201112:00 pmRNSFederal Grid Company Issues New Shares
5th Jul 20117:00 amRNSIssue of Debt
29th Jun 20112:00 pmRNSResults of the AGM
17th May 20117:13 amRNSBoard of Directors recommends payment of dividends
17th May 20117:12 amRNSFederal Grid Co announces Annual General Meeting
13th May 20117:00 amRNSFederal Grid Company Publishes RAS Q1 2011 Results
4th May 20117:22 amRNSFederal Grid has approved a bond issue
3rd May 20117:14 amRNSFederal Grid Co's IFRS annual financial results
3rd May 20117:13 amRNSAnnual Financial Report
20th Apr 201112:00 pmRNSFederal Grid Company adopts Stock Options Policy
14th Apr 20118:47 amRNSTariff adjustment
31st Mar 20117:31 amRNSFY 2010 financial results under RAS
30th Mar 20117:07 amRNSFederal Grid Company paid the first coupon on bond
29th Mar 20117:00 amRNSEGM approves transaction with INTER RAO UES

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.