Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEurasia Mining Regulatory News (EUA)

Share Price Information for Eurasia Mining (EUA)

Share Price is delayed by 15 minutes
Get Live Data
2.45    -0.025 (-1.01%)
Bid:
2.30
Ask:
2.60
Spread: 0.30 (13.043%)
Market Cap: £72.31m
EUA Live PriceLast checked at - London Stock Exchange

Intraday Eurasia Mining Share Chart

Drilling Report

3 Apr 2008 07:01

Eurasia Mining PLC03 April 2008 Eurasia Mining Plc ("Eurasia Mining" or the "Company") Drilling Results from Kola Peninsula Eurasia Mining is pleased to announce drilling results from the Kola Peninsulawhich the directors believe are "the best indicators yet" of the potential foropen pit mineable resources at the Volchetundra licence area. The explorationcosts for Volchetundra, in north-west Russia, are being funded by the world'slargest platinum producer, Anglo Platinum Limited ("Anglo Platinum"). The results follow the completion of two new boreholes in an area wherepotentially mineable platinum group metals (PGMs) have been identified byearlier drilling. The encouraging indicators come from results from one of the new boreholes,taken together with results from previous drilling. Grades of up to 2.25 gramsper tonne (g/t) compare favourably with those within the nearby Federova Depositwhich the mining giant Barrick Gold has already advanced to the feasibilitystudy stage. The second, deeper borehole, provided higher grades but fromgreater depth with a one metre section grading 14.3 g/t. Volchetundra is one of three Eurasia PGM projects located on the Kola Peninsulain north-west Russia, where the company is working as part of a joint venturewith Anglo Platinum. Anglo Platinum is earning an initial 40% interest in thejoint venture company by funding the first US$10 million of exploration on thelicence area. A 2008 drilling programme is also planned on the neighbouringMonchetundra licence. Eurasia's joint venture agreement with Anglo Platinum also covers the separateWest Kytlim exploration licence for alluvial platinum in the central Urals.There, Anglo Platinum is funding work up to completion of a feasibility study toearn a 50% interest. Mining is planned to commence as soon as practicable afterreceiving the necessary permits. The combined 2008 budget for all of the joint venture projects is over US$6million, to be funded entirely by Anglo Platinum. The drilling results are set out below. Kola Projects During a 2007 drill campaign, drilling continued in targeted areas along theprospective 40 km long 'Marginal Zone' where wide zones of potentially bulkmineable PGM mineralization have already been identified. Results have beenobtained from two new drill holes, VT 27 and VT 40. Drill hole VT 27 at the Ol'che target area intersected PGM mineralization in azone extending from the surface to 65.9 meters; intersections within this zoneare as follows: Hole From To Width Pt+Pd Pd:Pt ratio (m) (m) (m) (g/t) VT 27 1 17.6 16.6 0.7 3.0:1 25.9 29 3.1 0.83 4.5:1 31.3 59 27.7 1.6 2.9:1 including 38.7 45 6.3 2.25 5.0:1 62.9 65.9 3 0.94 5.2:1 Drill hole VT 27 is located 600m to the south of VT 17, the original Ol'chediscovery hole drilled in 2006; which contained the following, previouslyreported intersections: Hole From To Width Pt+Pd Pd:Pt ratio (m) (m) (m) (g/t) VT 17 68.4 113 44.6 1.7 1.5:1 - 3:1:1 144.9 163.4 18.5 1.9 0.5:1 170.2 172.7 2.5 4.7 0.7:1including 170.2 171.2 1 11 0.8:1 Intersections in the discovery drill hole VT 17 and the follow-up VT 27, 600meters along strike, are, the directors believe, the best indicators yetobtained by the Company, of potential for open pit bulk mineable resources onthe Volchetundra Licence area. The widths and grades of these two intersectionsappear similar to those which comprise the Federova Deposit, (Barrick Gold),which occurs in a very similar geological environment and is locatedapproximately 70 Km east of Volchetundra. Barrick have recently published aPlatinum and Palladium (Pt+Pd) inferred resource grade of appoximately1.4 g/tfor Federova. Barrick plan to complete feasibility studies for the Deposit bythe end of 2008. Pre-feasibility metallurgical testing indicated likely Pt andPd recoveries of respectively 80 and 83%. The ground to the south of VT 27 is open and untested; this area will be a majorfocus for drilling during 2008. Drilling also commenced at Yukspor, a second target area located 3 km south ofOl'che. Hole VT 40 returned 3.2m @ 5.2 g/t Pt + Pd with Pd/Pt = 1.5, including1.0m @ 14.27 g/t Pt + Pd with Pd/Pt = 1.25:1 as follows: Hole From To Width Pt+Pd Pd:Pt ratio (m) (m) (m) (g/t) VT 40 217.4 218.5 1.1 1.36 1.57:1 218.5 219.6 1.1 0.86 2.44:1 219.6 220.6 1.0 14.27 1.25:1 This hole is located in the northern part of the prospective target area,initially defined by surface sampling. In 2007, one trench 500 m to the southreturned 2.2m @ 12.9 g/t Pt + Pd with Pd/Pt = 2.6. Drilling in the more remotesouthern half of the prospective target area, will commence as soon as weatherconditions permit. The combined total strike length covering the Ol'che and Yukspor areas currentlyunder drill test is 3.8 km. Much of the planned 6,000 m drilling programme for2008 at Volchetundra will focus on this area. Reconnaissance drilling is alsoplanned to test already identified additional targets along the 40 km longprospective 'Marginal Zone' within the intrusive complex. A separate 6,000 m drilling programme is also planned on the MonchetundraExploration licence at Kola for 2008. There, work will focus on furtherdelineation of a preliminary resource identified in 2006-7. A number of holesare also planned to test new targets generated from a highly successfulgeophysical survey completed on the licence area in late 2007. The Kola PGM licences, which also include West Imandra, are all held by Eurasiain a joint venture with Anglo Platinum Limited, which is earning a 40% interestin the projects by expending the first $10 million for exploration. Update - West Kytlim projects As previously mentioned, the joint venture agreement with Anglo Platinum alsocovers the West Kytlim exploration licence for alluvial platinum in the centralUrals. On that licence, Anglo Platinum is funding work up to completion of afeasibility study to earn a 50% interest. In early 2008, a Russian compliantmining plan with reserve estimates for West Kytlim was submitted for approval byvarious authorities, and form the basis for future mining. It is the intentionof the joint venture company to commence production at the earliest possibletime. Start-up however will be conditional on the receipt of all the necessarypermits and approvals. The combined budget for the Joint Venture Projects in 2008 is over $6 million,100% of which will be funded by Anglo Platinum. Consent for release Christian Schaffalitzky, FIMMM, PGeo, CEng, is a director of the Company. He hasreviewed the update and consents to the inclusion of the exploration informationin the form and context in which it appears here. He is a Competent Person forthe reporting of these results. For further information contact: Christian Schaffalitzky/Michael de Villiers, Eurasia Mining plc: +44 (0) 20 7932 0418Laurie Beevers/Katy Mitchell W H Ireland Ltd: +44 (0) 161 819 8724Allan Piper, First City Financial Public Relations: +44 (0) 20 7242 2666 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
16th May 20173:03 pmRNSUnaudited Preliminary Results
16th May 20172:37 pmRNSRetirement of Chairman
9th May 20177:00 amRNSCompany Update
26th Apr 20174:21 pmRNSSanderson Partners facility drawdown
3rd Apr 20174:27 pmRNSMonchetundra Project - Feasibility Study Approval
29th Mar 20172:36 pmRNSSanderson Partners facility drawdown
24th Mar 20177:00 amRNSCompany Update
21st Feb 20174:38 pmRNSSanderson Partners facility drawdown
6th Feb 201712:22 pmRNSWest Kytlim Update
6th Feb 201712:17 pmRNSSuccessful step up to Production at West Kytlim
3rd Feb 20177:00 amRNSIssue of Equity
17th Jan 20173:03 pmRNSProjects Update January 2017
30th Dec 201611:28 amRNSIssue of Equity and Director Holdings
22nd Dec 201611:43 amRNSProject Update
21st Dec 20167:00 amRNSLoan Agreement and Issue of Equity
21st Nov 201610:08 amRNSPotential Agreement
18th Nov 20161:52 pmRNSIssue of Equity
3rd Nov 20167:00 amRNSProjects update
26th Oct 20167:00 amRNSIssue of Equity
10th Oct 20162:50 pmRNSProcurement, Construction & Commissioning contract
21st Sep 20167:25 amRNSIssue of equity to settle fees and remuneration
21st Sep 20167:20 amRNSWest Kytlim update/Loan facility & issue of equity
15th Sep 20167:00 amRNSInterim Results - six months ended 30 June 2016
9th Sep 20162:22 pmRNSAcceptance report from Ekaterinburg refinery
9th Sep 20167:00 amRNSFirst platinum concentrate at West Kytlim
1st Sep 20167:00 amRNSWest Kytlim Mining operation update - August 2016
31st Aug 20167:00 amRNSSemenovsky Tailings Project - Reserves Approval
1st Aug 20164:04 pmRNSLoan Agreement and Issue of Equity
28th Jul 20167:00 amRNSPlatinum refining and sales agreements
27th Jul 20167:00 amRNSWest Kytlim Mining operation update - July 2016
4th Jul 20167:00 amRNSSemenovsky Tailings Project & receipt of assays
30th Jun 201612:14 pmRNSResult of AGM
21st Jun 20167:00 amRNSMining start-up at West Kytlim
7th Jun 20167:00 amRNSAnnual Results for the 12 months ended 31 Dec 2015
31st May 20167:00 amRNSIssue of Equity and Repayment of Debt
25th May 20167:00 amRNSContract Mining at West Kytlim
12th May 20167:00 amRNSIssue of Equity
4th May 20167:00 amRNSExtension of Semenovsky Tailings Heads of Terms
26th Apr 20168:52 amRNSProject Update: Semenovsky Gold Tailings Project
22nd Apr 20167:00 amRNSPositive Drilling Results at Monchetundra
18th Apr 20168:43 amRNSAdvancement to Production Update
5th Apr 20167:00 amRNSIssue of Equity and Directors Shareholdings
16th Mar 20163:00 pmRNSUpdate re Gold Tailings Opportunity
29th Feb 20167:00 amRNSWest Kytlim Project Update
23rd Feb 20168:20 amRNSIssue of Equity
12th Feb 20168:00 amRNSExtension of Option Agreement
12th Feb 20168:00 amRNSLoan Agreement
27th Jan 20167:00 amRNSWest Kytlim Platinum Production 2016 - Update
16th Nov 20157:00 amRNSGold Tailings Production Opportunity
3rd Nov 20157:00 amRNSWest Kytlim Platinum Project - Progress Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.