The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEDR.L Regulatory News (EDR)

  • There is currently no data for EDR

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Wressle-1 EWT Update

21 Jul 2015 07:00

RNS Number : 5700T
Egdon Resources PLC
21 July 2015
 

 

 

EGDON RESOURCES PLC

21 July 2015

 

("Egdon" or "the Company")

 

Wressle-1 Extended Well Test Update - Results of Penistone Flags Zone 3A Test

 

Egdon Resources plc (AIM:EDR) is pleased to announce encouraging results from the pumped test carried out over the Penistone Flags Zone 3A as part of the Extended Well Test ("EWT") at the Wressle-1 oil and gas discovery in licence PEDL180, located to the east of Scunthorpe, where Egdon operates with a 25% interest.

During earlier initial testing, the Wressle-1 well produced oil and gas from three discrete reservoir intervals, the Ashover Grit, the Wingfield Flags, and the Penistone Flags as previously reported. At the end of those test operations, a completion was installed in the well to cater for a subsequent pumped EWT over the oil productive zones in the Ashover Grit (Zone 1) and the Penistone Flags (Zone 3A).

Due to problems experienced with the downhole testing equipment, the pumped flow test of the Ashover Grit oil reservoir could not be undertaken first as originally planned, therefore test operations were switched to focus initially on the shallower Penistone Flags.

The Penistone Flags interval was pumped for a period of time and achieved average rates over a three day period of 131 barrels of oil per day ("bopd") and 222,000 cubic feet of gas per day, together totalling 168 barrels of oil equivalent per day ("boepd") with an average producing gas oil ratio ("GOR") of approximately 1,700 cubic feet of gas per barrel of oil ("scf/stb").

Due to increasing gas rates the pump was then stopped and the well allowed to naturally flow to surface on a series of decreasing choke sizes from 12/64" down to 8/64" (being the smallest available). Average rates over a two day period on the 8/64" choke were 105 bopd with 465,000 cubic feet of gas per day, together totalling 182 boepd with an average producing GOR of approximately 4,450 scf/stb.

During the course of this flow testing no associated formation water has been produced.

The gas production rate has increased to the point where it is approaching the limits allowed under the environmental permit and as such production from the interval has now been halted. The well is now being killed ready for the next operation to be conducted, an injection test over the Penistone Flags zone 3A interval, to provide further reservoir data.

On conclusion of this injection test, attention will return to resolving the operational issues and undertaking pumped oil production testing over the Ashover Grit interval.

Commenting on the latest flow test result, Mark Abbott, Managing Director of Egdon Resources said:

"I am pleased to report the continuing encouraging results from the Wressle-1 test programme. The hydrocarbon production rate of over 180 barrels of oil equivalent per day attained from the Penistone Flags oil zone has exceeded pre-test expectations. The production performance together with the planned injection test will provide valuable reservoir engineering data that will be used to plan for a commercial development of the Penistone Flags.

We now look forward to commencing operations on the EWT programme for the Ashover Grit and will provide another update in due course."

 

For further information please contact:

 

Egdon Resources plc

Mark Abbott, Jerry Field 01256 702 292

 

Buchanan

Richard Darby, Anna Michniewicz 020 7466 5000

 

Nominated Adviser and Broker - Cantor Fitzgerald Europe

David Porter, Sarah Wharry (Corporate Finance) 020 7894 7000

Richard Redmayne (Corporate Broking)

 

Joint Broker - VSA Capital Limited

Andrew Monk (Corporate Broking) 020 3005 5000

Andrew Raca (Corporate Finance)

Notes to Editors:

 

The Wressle Oil Discovery -The Wressle Prospect was defined on proprietary 3D seismic data, which was acquired by Egdon in February 2012. The structure is located on trend with the producing Crosby Warren oil field and the Broughton-B1 oil discovery, both to the immediate northwest, and the Brigg-1 oil discovery to the immediate southeast. All contain oil in various different sandstone reservoirs within the Upper Carboniferous succession. The pre-drill gross mean Prospective Resources at Wressle, as calculated by Egdon, were estimated to be 2.1 million barrels of oil. This will be updated following the results of the current test operations.

The Wressle-1 well reached a total depth (TD) of 2240 metres measured depth (MD) (1814 metres true vertical depth below OS datum (TVDSS)) on 23 August 2014. Elevated mud gas readings were observed over large parts of the interval from the top of the Penistone Flags reservoir target (1831.5 metres MD) to TD. The interests in the Wressle-1 well are:

 

Egdon Resources U.K. Limited 25.00% (Operator)

Celtique Energie Petroleum Limited 33.33%

Europa Oil & Gas Limited 33.34%

Union Jack Oil plc 8.33%

 

The well was logged using measurement whilst drilling (MWD) logging tools run on the drill string. Petrophysical evaluation of the log data indicated the presence of potential hydrocarbon pay in three main intervals;

· Penistone Flags - up to 19.8 metres measured thickness (15.9 metres vertical thickness)

· Wingfield Flags - up to 5.64 metres measured thickness (5.1 metres vertical thickness)

· Ashover Grit - up to 6.1 metres measured thickness (5.8 metres vertical thickness)

On 9 February 2015, shareholders were updated on the successful Ashover Grit Flow Test, which recorded flow rates of 80 barrels of oil per day and 47 thousand cubic feet of gas per day during a 16 hour main flow period. No appreciable volumes of water were observed. The oil is of good quality with a gravity of 39-40° API.

On 19 February 2015, shareholders were updated on the successful Wingfield Flags Flow Test, which recorded flow rates of up to 182 barrels of oil per day of good quality 39-40 API oil on free flow, along with up to 456 thousand cubic feet of gas per day.

On 27 February 2015, shareholders were updated on the initial successful Penistone Flags test, which produced gas at facilities-restricted flowrates of up to 1.7 million cubic feet of gas per day with associated oil of up to 12 barrels of oil per day and no free water.

On 27 March 2015, shareholders were updated on the second successful Penistone Flags test. Zone 3a in the Penistone Flags was perforated over a 7.5 metre interval and produced good quality oil with a gravity of 33o API. A total of 98.5 barrels of oil were recovered during the test (of which flow induced by swabbing operations produced 34.3 barrels of oil). This equates to a rate of approximately 77 barrels of oil per day (bopd).

 

During the current EWT the Zone 3A perforations were produced for a total of 254hrs over a 13 day period from the 5th to 17th Jul'15. Zone 3A was initially produced by sucker rod pump and then allowed to free flow to surface after the wellbore & perforations had fully cleaned-up. Over the full 13 day period the following separator cumulative volumes were produced:- 1,127 bbl of oil, 147 bbl of kill brine and 2,790 Mscf of gas.

 

Operations at the Wressle site will not involve the process of high volume hydraulic 'fracturing (fracking') for shale gas.

Egdon Resources plc (LSE: EDR) is an established UK-based exploration and production company primarily focused on onshore exploration and production in the hydrocarbon-producing basins of the UK and France.

 

Egdon currently holds interests in thirty four licences in the UK and France and has an active programme of exploration, appraisal and development within its balanced portfolio of oil and gas assets. Egdon is an approved operator in both the UK and France.

 

Egdon was formed in 1997 and listed on AIM in December 2004.

 

In accordance with the AIM Rules - Note for Mining and Oil and Gas Companies, the information contained in this announcement has been reviewed and signed off by the Managing Director of Egdon Resources plc Mark Abbott, a Geoscientist with over 26 years' experience.

 

Evaluation of potential recoverable hydrocarbons has been assessed in accordance with 2007 Petroleum Resources Management System prepared by the Oil and Gas Reserves Committee of the Society of Petroleum Engineers (SPE) and reviewed and jointly sponsored by the World Petroleum Council (WPC), the American Association of Petroleum Geologists (AAPG) and the Society of Petroleum Evaluation Engineers (SPEE).

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCEAKXEADNSEFF
Date   Source Headline
6th Jan 20217:00 amRNSPreliminary Results
6th Jan 20217:00 amRNSResolution 3D Survey Update
5th Jan 20217:00 amRNSNotice of Results
26th Nov 20207:00 amRNSWressle Development Update and Loan Facility
10th Nov 20207:00 amRNSBiscathorpe Planning Update
16th Oct 20207:05 amRNSPEDL143 Relinquishment
14th Oct 20207:00 amRNSPEDL241 (North Kelsey) Alignment of Interests
7th Sep 20202:30 pmRNSNorth Kelsey Planning Update
26th Aug 20207:00 amRNSSettlement Proceeds Received
25th Aug 20207:00 amRNSShell Farm-in Update
3rd Aug 20207:00 amRNSWressle Development Update
29th Jun 20208:08 amRNSREPLACEMENT: Appointment of Nomad and joint Broker
29th Jun 20207:00 amRNSAppointment of Nomad and joint Broker
24th Jun 20207:00 amRNSHumber Oil & Gas PEDL253 Biscathorpe settlement
8th Jun 20207:00 amRNSUpdate on Licences P1929 and P2304
13th May 20207:00 amRNSWressle Update
27th Apr 20201:02 pmRNSDirector / PDMR Dealing
27th Apr 20207:00 amRNSTranche 2 of Equity Fundraising
22nd Apr 20207:00 amRNSDirector / PDMR Dealing
21st Apr 20207:00 amRNSInterim Results
14th Apr 20207:00 amRNSEquity Fundraising of approximately £500,000
2nd Apr 20207:00 amRNSCoronavirus (COVID-19) and Trading Update
30th Mar 20207:00 amRNSBiscathorpe Update - Significant Commercial Upside
18th Mar 20207:00 amRNSWressle Development Update
9th Mar 20207:15 amRNSEast Humber Basin Update
26th Feb 20207:00 amRNSProduction update and notice of results
21st Jan 20201:00 pmRNSP1929 and P2304 Farm-In Agreement with Shell U.K.
20th Jan 20207:00 amRNSUpdate on P1929 and P2304 Agreement
17th Jan 20203:00 pmRNSWressle Development Appeal Granted
19th Dec 20192:02 pmRNSResults of Annual General Meeting
27th Nov 20197:00 amRNSGrant of Licence Extensions: P1929 and P2304
19th Nov 20197:00 amRNSFinal Results
12th Nov 20192:05 pmRNSSecond Price Monitoring Extn
12th Nov 20192:00 pmRNSPrice Monitoring Extension
8th Nov 20197:00 amRNSWressle Development Public Inquiry Concluded
4th Nov 20197:00 amRNSGovernment Moratorium on Hydraulic Fracturing
4th Nov 20197:00 amRNSP1929 and P2304 Farm-out Exclusivity Agreement
1st Oct 20197:00 amRNSOperations Update
12th Sep 20197:00 amRNSSprings Road Update - Resource Density Results
4th Sep 20194:41 pmRNSSecond Price Monitoring Extn
4th Sep 20194:36 pmRNSPrice Monitoring Extension
20th Aug 20197:00 amRNSLicence Extension on PEDL143 "A24" Prospect
29th Jul 20197:00 amRNSWressle Planning Update
19th Jul 20197:00 amRNSNotification of Major Holdings
15th Jul 20197:00 amRNSBiscathorpe-2 Update
27th Jun 20197:00 amRNSSprings Road-1 Well Results
5th Jun 20197:00 amRNSCorrection
4th Jun 20197:00 amRNSOpen Offer Results
3rd Jun 201912:30 pmRNSResult of General Meeting
15th May 20192:00 pmRNSOpen Offer, GM and Production Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.