Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEDR.L Regulatory News (EDR)

  • There is currently no data for EDR

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Preliminary Results of the Wressle-1 Well

2 Sep 2014 07:00

RNS Number : 5626Q
Egdon Resources PLC
02 September 2014
 



 

 

2 September 2014

EGDON RESOURCES PLC

("Egdon" or "the Company")

 

Preliminary Results of the Wressle-1 Exploration Well

 

Egdon Resources plc (AIM:EDR) is pleased to announce the preliminary results from drilling of the Wressle-1 conventional exploration well located to the East of Scunthorpe.

The Wressle-1 well was spudded on 18 July 2014 and on 23 August 2014 reached a total depth (TD) of 2240 metres measured depth (MD) (1814 metres true vertical depth below OS datum (TVDSS)). Elevated mud gas readings were observed over large parts of the interval from the top of the Penistone Flags reservoir target (1831.5 metres MD) to TD.

The well was logged using measurement whilst drilling (MWD) logging tools run on the drill string. Preliminary petrophysical evaluation of the log data has indicated the presence of potential hydrocarbon pay in three main intervals;

· Penistone Flags - up to 19.8 metres measured thickness (15.9 metres vertical thickness)

· Wingfield Flags - up to 5.64 metres measured thickness (5.1 metres vertical thickness)

· Ashover Grit - up to 6.1 metres measured thickness (5.8 metres vertical thickness)

The well is currently being completed with a 4 ½" liner to enable selective and sequential testing of these intervals as part of an extended well test, for which planning consent has already been received. These test operations, which will be designed to determine the flow rates, hydrocarbon type and hence commerciality of the Wressle-1 well, will be undertaken using a work-over rig and are expected to commence during October 2014.

Further updates will be given as these operations progress.

The interests in the Wressle-1 well are:

 

Egdon Resources U.K. Limited 25.00% (Operator)

Celtique Energie Petroleum Limited 33.33%

Europa Oil & Gas Limited 33.34%

Union Jack Oil plc 8.33%

 

Commenting on the results Mark Abbott, Managing Director of Egdon said:

 

"We are very encouraged by the preliminary evaluation of Wressle-1- our first exploration well in the East Midlands Basin - with interpretation of potential hydrocarbon pay of over 30 metres thickness (measured) in three discrete reservoir intervals. Our attention now moves to designing and delivering a testing programme for these intervals to determine the potential for a commercial discovery and we look forward to updating shareholders once these operations commence."

 

 

For further information please contact:

 

Egdon Resources plc

Mark Abbott, Jerry Field 01256 702 292

 

Buchanan

Richard Darby, Anna Michniewicz 020 7466 5000

 

Nominated Adviser and Broker - Cantor Fitzgerald Europe

David Porter, Sarah Wharry (Corporate Finance) 020 7894 7000

Richard Redmayne (Corporate Broking)

 

Joint Broker - VSA Capital Limited

Andrew Monk (Corporate Broking) 020 3005 5000

Andrew Raca (Corporate Finance)

 

 

 

 

 

 

 

Notes to Editors:

 

Egdon Resources plc

 

Egdon Resources plc (LSE:EDR) is an established UK-based exploration and production company primarily focused on onshore exploration and production in the hydrocarbon-producing basins of the UK and France. 

 

Egdon holds interests in thirty seven licences in the UK and France and has an active programme of exploration, appraisal and development within its balanced portfolio of oil and gas assets. Egdon is an approved operator in both the UK and France.

 

Egdon was formed in 1997 and listed on AIM in December 2004.

The Wressle Prospect

The Wressle Prospect is defined on proprietary 3D seismic data, which was acquired by Egdon in February 2012. The Prospect is located on trend with the producing Crosby Warren oil field and the Broughton-B1 oil discovery, both to the immediate northwest, and the Brigg-1 oil discovery to the immediate southeast. All contain oil in various different sandstone reservoirs within the Upper Carboniferous succession. The pre-drill gross mean Prospective Resources at Wressle, as calculated by Egdon, are estimated to be 2.1 million barrels of oil.

Operations at this site will not - either now or in the future - involve the process of hydraulic 'fracking' for shale gas.

 

In accordance with the AIM Rules - Note for Mining and Oil and Gas Companies, the information contained in this announcement has been reviewed and signed off by the Managing Director of Egdon Resources plc Mark Abbott, a Geoscientist with over 26 years' experience.

 

Evaluation of potential recoverable hydrocarbons has been assessed in accordance with 2007 Petroleum Resources Management System prepared by the Oil and Gas Reserves Committee of the Society of Petroleum Engineers (SPE) and reviewed and jointly sponsored by the World Petroleum Council (WPC), the American Association of Petroleum Geologists (AAPG) and the Society of Petroleum Evaluation Engineers (SPEE).

 

 

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCLBMFTMBIMBAI
Date   Source Headline
1st Nov 20167:00 amRNSIndependent Gas in Place Estimates
26th Oct 20167:00 amRNSUK Onshore Licence Interest Acquisitions
18th Oct 20167:00 amRNSNotification of Results
7th Oct 20163:25 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
6th Oct 201610:15 amRNSSprings Road Planning Adjournment
3rd Oct 20167:00 amRNSUK 14th Onshore Licensing Round Final Awards
26th Sep 20167:00 amRNSCPR on Wressle-1 and Broughton North Prospect
26th Aug 20162:35 pmRNSExercise of options
22nd Aug 20167:00 amRNSAcquisition of additional interest in PEDL068
15th Aug 201612:49 pmRNSHargreave Hale TR1
15th Jul 20167:00 amRNSNotification of Major Shareholding
4th Jul 20167:00 amRNSUK Licence Changes
27th Jun 20167:05 amRNSExtension of Licence PEDL143
13th Jun 20167:00 amRNSFarm-out of Interest in PEDL182
24th May 20164:35 pmRNSPrice Monitoring Extension
26th Apr 20167:00 amRNSInterim Results
4th Apr 20167:00 amRNSNotification of Interim Results
14th Mar 20161:00 pmRNSCompletion of drilling - Laughton-1 exploration
15th Feb 20167:00 amRNSCommencement drilling operations Laughton-1 Well
8th Feb 20167:00 amRNSKeddington-5 Development Well
26th Jan 20167:00 amRNSFarm-out of Interest in the Laughton-1 Well
18th Jan 20167:00 amRNSCommencement of Drilling Keddington-5 Well
5th Jan 20161:41 pmRNSDirectors Share Dealing
4th Jan 20161:53 pmRNSDirectorate Changes
17th Dec 20153:32 pmRNSDirectors Share Dealing
17th Dec 20151:25 pmRNSUK 14th Onshore O&G Licensing Round 2nd Tranche
3rd Dec 201512:23 pmRNSResults of AGM
30th Nov 201510:18 amRNSHolding(s) in Company
16th Nov 20158:00 amRNSGrant of Options
3rd Nov 20157:00 amRNSFinal Results for the Year Ended 31 July 2015
22nd Oct 20157:00 amRNSWressle Oil and Gas Discovery: Update
14th Oct 201510:37 amRNSNotice of Results
23rd Sep 20153:08 pmRNSFavourable Holmwood Planning Decision
21st Sep 20157:00 amRNSCompletion of Farm-out of Interests in PEDL005(R)
4th Sep 20158:20 amRNSWressle-1 Update and Forward Plan
18th Aug 20152:35 pmRNSEgdon to be offered blocks in 14th Onshore Round
7th Aug 20153:31 pmRNSFavourable Holmwood Planning Inspectorate Decision
21st Jul 20157:00 amRNSWressle-1 EWT Update
14th Jul 20157:00 amRNSFarm-out of Interests in Licence PEDL005(R)
29th Jun 20157:00 amRNSFarm-out of PEDL143 Holmwood Prospect
22nd Jun 201511:09 amRNSHolding(s) in Company
22nd Jun 20157:00 amRNSFarm-out of further Interest in PEDL253
18th Jun 20157:00 amRNSWressle-1 Commencement of Extended Well Test
5th Jun 20157:00 amRNSPEDL241 - Acquisition of Additional Interest
21st Apr 20157:00 amRNSInterim Results
1st Apr 20154:05 pmRNSNotification of interim results
27th Mar 20157:00 amRNSWressle-1 Testing Update Second Penistone Flags
23rd Mar 20157:01 amRNSCompletion of drilling at Kiln Lane-1
16th Mar 20153:00 pmRNSPlanning Permission Granted for Biscathorpe-2 well
3rd Mar 20157:00 amRNSUpdate on Wressle-1 Well Testing

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.