Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCentral Rand Gold Regulatory News (CRND)

  • There is currently no data for CRND

Operational Update

23 Feb 2017 10:00

RNS Number : 6580X
Central Rand Gold Limited
23 February 2017
 

Central Rand Gold Limited

(Incorporated as a company with limited liability under the laws of Guernsey, Company Number 45108)

(Incorporated as an external company with limited liability under the laws of South Africa,

Registration number 2007/019223/10)

ISIN: GG00B92NXM24

LSE share code: CRND JSE share code: CRD

("Central Rand Gold" or the "Company")

Operational Update

 

Operational Update

 

Shareholders are referred to the announcement dated 10 January 2017 wherein the Company advised of the November 2016 commissioning of Mill No 1 in November 2016. Together, Mill No 1 and Mill No 3, have capacity to provide a nameplate milling of 800 tonnes per day, with production at that stage being approximately 500 tonnes of toll treatment materials per day.

 

In the months of January and February 2017, excessive rainfall was experienced. This is also due to the tail end of cyclone Dineo passing over the interior of South Africa. The negative effects of the rain are that the run of mine material is problematic to crush and screen when wet, and also that the wet conditions affect the feed material as it becomes muddy and challenging to handle, resulting in clogging, which in turn leads to a reduction in the processing capacity.

 

The storms also created lightning, which caused various power outages at the plant, at the site, and at the power stations supplying Central Rand Gold. In January 2017, power outages accounted for a 7.5% loss in capacity, and for the period 1 February 2017 to 12 February 2017, a 25% loss in production. The Company is exploring alternate power sources, as well as the use of a diesel generator to provide back-up power during any power outages.

 

In November 2016, water restrictions were imposed on the whole of Gauteng, due to the severe drought throughout the country, and the extremely low water levels in the dams. Central Rand Gold has purchased and installed pumps and introduced a water reticulation system, so that recycled water can be utilised to keep the plant operational. This additional expenditure was not envisaged before the water restrictions were imposed.

 

The tolling companies have also reduced their feed to Central Rand Gold, as the material that is available is not always suitable for the plant requirements. This issue has been addressed, and smaller quantities are being sourced from reliable tolling companies. Central Rand Gold is currently crushing and screening their own material on site, which has been made available from previously mined out areas. In January 2017, 44% of the material processed through the plant was Central Rand Gold's own material, and for the period from 1 February 2017 to 22 February 2017, 86% of the material processed through the plant was Central Rand Gold's own material.

The tolling companies' material is being stockpiled and sampled, and will be processed in batches throughout the period.

 

Cashflows have been negatively affected due to the production down-times, as well as costs for unusual items (not previously forecast). Such unusual costs include the ongoing litigation costs in terms of the dispute with the Company's Black Economic Empowerment partners.

 

In order to address the issues faced over the past two months, various programmes and plans have been put into place, which include the open-pit mining and processing of Central Rand Gold's own material, interspersed with the batch treatment of tolling companies' materials. As South Africa enters into autumn, the rain is expected to reduce, thereby alleviating the issues of wet and muddy feed material.

 

A steel structure has also been ordered, which, once erected, will assist in keeping the feed materials dry during the wet seasons.

 

Management is committed to minimising production downtime and improving production efficiency in order to support the current operation until the Concentrator Circuit has been installed and commissioned.

 

For further information, please contact:

Central Rand Gold +27 (0) 87 310 4400

Lola Trollip

 

ZAI Corporate Finance Limited - Nominated Adviser +44 (0) 20 7060 2220

John Treacy / Jamie Spotswood

 

Brandon Hill Capital Limited - Broker +44 (0) 20 3463 5000

Jonathan Evans / Wei Jiao

 

Merchantec Capital - JSE Sponsor +27 (0) 11 325 6363

Monique Martinez / Marcel Goncalves

 

Johannesburg

23 February 2017

The information communicated in this announcement is inside information for the purposes of Article 7 of Market Abuse Regulation 596/2014 ("MAR").

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
UPDPGUQGPUPMUBW
Date   Source Headline
1st Feb 20107:00 amRNSTotal Voting Rights
1st Feb 20107:00 amRNSInvestor and Analyst Site Visit Presentation
29th Jan 20103:31 pmRNSNOTIFICATION OF MAJOR INTEREST IN SHARES
22nd Jan 20107:00 amRNSPlacing and operational update
25th Nov 20093:00 pmRNSNotice of Change of Auditor
25th Nov 20097:00 amRNSPuno Gold Investments complaint rejected by FSB
20th Nov 20097:00 amRNSPuno Gold Investments applies for leave to appeal
17th Nov 20097:00 amRNSInterim Management Statement
5th Nov 20092:30 pmRNSCourt Case Update
14th Oct 200911:30 amRNSPDMR's Dealings
13th Oct 200910:44 amRNSPuno Gold Investments Court Case Date Postponed
14th Sep 200912:30 pmRNSSeptember 2009 Investor and Analyst Presentation
9th Sep 20097:00 amRNSPuno Update
27th Aug 200910:00 amRNSMain Reef Package Intersection
25th Aug 20097:30 amRNSINITIAL RESERVE STATEMENT FOR CENTRAL RAND GOLD
25th Aug 20097:30 amRNSInterim Results
28th Jul 20097:00 amRNSFirst Gold Smelt
21st Jul 200911:00 amRNSBoard Subcommittee Reconstitutions
16th Jul 20094:40 pmRNSSecond Price Monitoring Extn
16th Jul 20094:35 pmRNSPrice Monitoring Extension
8th Jul 20097:00 amRNSOperations Update
26th Jun 20092:00 pmRNSBoard Appointments to CRGSA
4th Jun 20097:00 amRNSSenior Management Appointment
21st May 20092:30 pmRNSResult of AGM
21st May 20097:00 amRNSAnnual General Meeting - Webcast & Conference Call
19th May 200911:54 amRNSInterim Management Statement
19th May 200911:47 amRNSBoard and Senior Management Changes
14th May 20092:00 pmRNSBEE Update
9th Apr 20097:00 amRNSBEE Update
3rd Apr 20097:00 amRNSReserve Statement Update
1st Apr 200910:00 amRNSAGM Notice
31st Mar 200911:30 amRNSToll Treatment Arrangement
25th Mar 20099:00 amRNSAnnual Results
9th Mar 200911:30 amRNSAustralian Investor Meetings
5th Mar 200912:52 pmRNSAppointment of Company Secretary
4th Mar 20099:00 amRNSCOMMENCEMENT OF DECLINE DEVELOPMENT
26th Feb 20092:00 pmRNSNew Order Mining and Prospecting Rights Granted
16th Feb 200910:02 amRNSBEE Developments
5th Feb 20097:00 amRNSAnalyst Site Visit
29th Jan 20097:00 amRNSOperational Update
16th Jan 200912:13 pmRNSDirector/PDMR Shareholding
5th Dec 20089:00 amRNSCENTRAL RAND GOLD LIMITED APPOINTS NEW CEO
4th Dec 200812:25 pmRNSFirst Gold Pour
2nd Dec 20087:00 amRNSHolding(s) in Company
12th Nov 20081:30 pmRNSHolding(s) in Company
12th Nov 20087:00 amRNSInterim Management Statement
7th Nov 200811:00 amRNSResignation of Company Secretary
6th Nov 20084:43 pmRNSSecond Price Monitoring Extn
6th Nov 20084:41 pmRNSPrice Monitoring Extension
13th Oct 200812:00 pmRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.