Chris Heminway, Exec-Chair at Time To ACT, explains why now is the right time for the Group to IPO. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCapital Metals Regulatory News (CMET)

Share Price Information for Capital Metals (CMET)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 4.65
Bid: 4.50
Ask: 4.80
Change: 0.00 (0.00%)
Spread: 0.30 (6.667%)
Open: 4.65
High: 4.80
Low: 4.65
Prev. Close: 4.65
CMET Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Resource Potential and Infrastructure

26 Apr 2021 07:00

RNS Number : 5096W
Capital Metals PLC
26 April 2021
 

26 April 2021 

 

Capital Metals plc

("CMET" or the "Company")

Resource Potential and Infrastructure

 

 

Capital Metals plc (AIM: CMET) is a natural resources company focused on the development of the Eastern Minerals Project in Sri Lanka ("the Project"), one of the highest-grade mineral sands' projects globally. The Company is pleased to provide the following background information on the resource potential and robust supporting infrastructure that underline the Project's long term viability.

 

Highlights

 

● The Project currently has a JORC Resource of 17.2 Mt with an average grade of 17.6% Total Heavy Minerals ("THM"), an estimate that makes it one of the highest-grade mineral sands' deposits in the world.

 

● The current Resource estimate is based on auger drilling that has not penetrated more than three metres deep. Limited sonic drilling so far undertaken offers compelling indication of deeper mineralisation, including showings of 26.3% and 26.6% THM at respective depths of 14 and 8 metres.

 

● Further potential exists beyond the narrow coastal strip - accounting for only 6% of the total Project area - that has been the primary focus of drilling to date. Initial exploration suggests potential for significant mineralisation further inland.

 

● The Resource's expected high grade will reduce capital expenditure - less material needs to be mined and processed to access commercial minerals.

 

● The Project is just 30 km drive along a network of sealed roads from a commercial port, making possible the smooth transfer of mined minerals for shipping to international markets.

The Current Resource

The Project's 84 km2 licence area on Sri Lanka's eastern seaboard has a JORC Resource of 17.2 Mt with an average grade of 17.6% Total Heavy Minerals, an estimate making it one of the highest-grade mineral sands' deposits in the world, with nearly three times the average grade of comparable projects. 85% of the Resource estimate is classified in the JORC code's higher level Measured and Indicated categories.

Opportunities to Upgrade the Resource

Although the current estimate - based on 1,643 shallow auger drill holes totalling 2,621 metres of drilling - is sufficient for a mine, CMET believes compelling opportunities exist to significantly upgrade the Resource.

The inherent physical limitations of auger drilling mean the Project area has so far only been drilled to an average depth of three metres. Exploratory sonic drilling undertaken by the Company in 2018 indicated that mineralisation continues at deeper levels across much of the Resource, results including holes recording 26.3% THM at a depth of 14 metres and 26.6% at eight metres. The consistently high grades so far recorded suggest the Resource may be free of the coatings on sand grains that make it harder for standard equipment to efficiently recover valuable minerals, and to rehabilitate the land after mining.

Further potential exists beyond the narrow coastal strip that has been the primary focus of drilling to date, a 100 to 300 metre wide north-south corridor running alongside the sea that accounts for only 6% of the total Project area. The Project's bounds extend up to two to three kilometres inland, covering terrain that may encompass marine sediments.

The limited drilling as yet undertaken further inland suggests significant mineralisation. This territory, a series of shallow lagoons and estuarine habitats, is readily accessible to environmentally sensitive drilling, with minimal need to disturb vegetation prior to mining.

Plans for Future Exploration

After raising £2 million in January CMET is funded for various drilling programmes that would explore more of the Project area, and at greater depth.

The Company, having made applications for nine additional exploration licenses covering a further 623 km2, is discussing field access arrangements with local land owners and is undertaking a development study and economic analysis - due for completion by the end of H1 2020 - that will look ahead to a mining operation targeting an estimated yearly production of 1.65 million tonnes ("Mt").

CMET anticipates the successful conclusion of the current Environmental Impact Assessment, and the subsequent granting of an Industrial Mining License that will allow the Company to conclude ongoing discussions with potential offtake partners, and enter into agreements involving a prepayment or financing arrangement. At this point funding will also be sought for the estimated USD 35 million cost of constructing onsite facilities capable of processing around 1.65Mt a year.

A wet concentrator plant will be used to separate the heavy minerals from the silica sands, creating a Heavy Mineral Concentrate ('HMC') that will be processed at a dry plant where the zircon, garnet, rutile and ilmenite elements will be separated from non-commercial silica sands. The expected high grade of the THM would allow CMET to build a small and less expensive mine than would otherwise be required, as less material would need to be mined and processed to make the concentrate. Construction is scheduled to begin in Q4 2021, with first production in H1 2022.

A Robust Infrastructure Already in Place

The Company expects to further reduce its capital expenditure by taking advantage of the robust infrastructure already in place, connecting the Project through a network of sealed roads to a commercial port at Oluvil, just 30 kilometres north of the licence area.

The Project is located in the Eastern Province of Sri Lanka, approximately 220 kilometres east of the country's capital city Colombo. It can be accessed from a network of existing sealed roads that join with the national highway, ensuring smooth transfer of mined HMC to the port.

Oluvil Port opened in 2013 as part of the Sri Lankan government's ongoing programme to upgrade the country's infrastructure. The port, which is currently being used by the regional fishing industry, offers facilities and shipping capacity - 8,000 to 10,000 tonnes to a depth of 11 metres - that easily fulfil CMET's requirements. The port has all the essential infrastructure to serve as a commercial harbour, being equipped with grid power, scheme water, offices, workshops, storage facilities, and residential quarters, and secure perimeter walls and fencing.

The Company is in discussion with the Sri Lankan Port Authority ('SLPA') to use the port for its operations, where it intends to construct a dry mineral separation plant to separate the HMC into value added minerals before shipping. CMET has offered to assist SLPA with any required dredging of accumulated sands resulting from long shore drift for the benefit of all users of the port, including commercial shipping and the local fishing industry.

 

For further information, please visit www.capitalmetals.com or contact: 

Capital Metals plc

Michael Frayne (CEO)

+44 (0) 20 7317 6800

SPARK Advisory Partners (Nominated Adviser)

Neil Baldwin / James Keeshan

+44 (0) 20 3368 3554

WH Ireland Limited (Joint Broker)

Harry Ansell / Katy Mitchell

+44 (0) 20 7220 1666

Brandon Hill Capital Limited (Joint Broker)

Jonathan Evans / Oliver Stansfield

+44 (0) 20 3463 5000

 

Glossary:

Auger Drilling: is done with a helical screw which is driven into the ground with rotation; the earth is lifted up the borehole by the blade of the screw. Used in soil, soft unconsolidated formations, or weak weathered rock

JORC: the JORC Code provides minimum standards for public reporting to ensure that investors and their advisers have all the information they would reasonably require for forming a reliable opinion on the results and estimates being reported. The current version is dated 2012

 

Sonic Drilling: an advanced form of drilling which employs the use of high-frequency, resonant energy generated inside the Sonic head to advance a core barrel or casing into subsurface formations.

THM: Total Heavy Minerals

 

About Reach Announcements

Reach is an investor communication service aimed at assisting listed and unlisted (including AIM quoted) companies to distribute media only / non-regulatory news releases such as marketing messages, corporate and product information into the public domain. An RNS Regulatory announcement is required to be notified under the AIM Rules for Companies.

 

This information is provided by Reach, the non-regulatory press release distribution service of RNS, part of the London Stock Exchange. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.Reach is a non-regulatory news service. By using this service an issuer is confirming that the information contained within this announcement is of a non-regulatory nature. Reach announcements are identified with an orange label and the word “Reach” in the source column of the News Explorer pages of London Stock Exchange’s website so that they are distinguished from the RNS UK regulatory service. Other vendors subscribing for Reach press releases may use a different method to distinguish Reach announcements from UK regulatory news.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
NRAQELFLFZLZBBK
12
Date   Source Headline
12th Dec 202211:00 amRNSPrice Monitoring Extension
12th Dec 20227:04 amRNSNotice received from the GSMB
16th Nov 20222:06 pmRNSSecond Price Monitoring Extn
16th Nov 20222:00 pmRNSPrice Monitoring Extension
28th Oct 202212:06 pmRNSResult of Meeting
30th Sep 20221:47 pmRNSResult of AGM
30th Sep 20227:00 amRNSAGM Statement
26th Sep 20227:00 amRNSFinal Results
7th Sep 20224:15 pmRNSNotice of AGM
10th Aug 202210:10 amRNSGrant of Industrial Mining Licences
13th Jul 20227:00 amRNSProject Update
29th Jun 20227:00 amRNSDirector/PDMR Shareholding
21st Jun 20229:00 amRNSPrice Monitoring Extension
21st Jun 20227:00 amRNSDrill Results
25th May 20227:00 amRNSPresentation
12th May 20227:00 amRNSResults of Development Study and Project Economics
20th Apr 20227:00 amRNSDrill Results and Project Update
29th Mar 20227:00 amRNSAdditional Strategic Exploration License Granted
23rd Mar 20227:30 amRNSProject Update
28th Feb 20228:15 amRNSDeath of Director
9th Feb 202210:34 amRNSResult of Placing
9th Feb 20227:00 amRNSProposed Placing to raise approximately £1.25m
17th Jan 20227:00 amRNSPresentation
4th Jan 20227:00 amRNSAppointment of Broker
20th Dec 20217:00 amRNSInterim Results
8th Dec 20217:34 amRNSInitiation of Research
7th Dec 20211:52 pmRNSPodcast / Article
23rd Nov 20219:00 amRNSPrice Monitoring Extension
23rd Nov 20217:00 amRNSApproval – Environmental Impact Assessment
16th Nov 20219:22 amRNSChange of Registered Office
4th Nov 202111:47 amRNSResult of AGM
4th Nov 202111:00 amRNSAGM Statement
29th Oct 202110:36 amRNSAppointment of CFO, Directorate and CoSec Change
8th Oct 20219:33 amRNSNotice of Annual General Meeting
5th Oct 20217:00 amRNSDrilling Programme at Southern License Commences
30th Sep 20216:44 pmRNSAnnual Results for year end 31 March 2021
16th Aug 20217:00 amRNSAppointment of Technical Manager
19th Jul 20217:00 amRNSProgress on the ground and development update
22nd Jun 20217:00 amRNSOperational Update
26th Apr 20217:00 amRNSResource Potential and Infrastructure
8th Apr 20217:00 amRNSAppointment of WH Ireland as Joint Broker
26th Mar 20217:00 amRNSUpdate on Environmental Impact Assessment Process
17th Mar 20217:00 amRNSMineral Sands Market
5th Feb 20217:00 amRNSPDMR Dealing
5th Feb 20217:00 amRNSIssue of Equity
3rd Feb 20217:00 amRNSCorporate and Operational Update
28th Jan 202112:12 pmRNSResult of AGM
12

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.