Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCGH.L Regulatory News (CGH)

  • There is currently no data for CGH

2018 Drilling Commences at Tulkubash

1 May 2018 07:00

RNS Number : 6603M
Chaarat Gold Holdings Ltd
01 May 2018
 

Chaarat Gold Holdings Limited

("Chaarat" or the "Company")

2018 Drilling Commences at Tulkubash

Road Town, Tortola, British Virgin Islands (1 May 2018)

Chaarat (AIM - CGH), the AIM quoted exploration and development company developing the Chaarat Gold Project in the Kyrgyz Republic, is pleased to announce the commencement of its 2018 drilling campaign at its Tulkubash oxide gold deposit. The first drill rig arrived on site on April 23 and commenced drilling on April 25. Two more rigs are expected to arrive on site this week, with up to ten rigs expected to be working at site later in the drill season.

The first hole being drilled is targeting strike length extension of the currently defined oxide mineralisation. The initial drill hole targets the extension of strong mineralisation along the southeast side of the currently designed Tulkubash pit. This target has the potential to add low stripping ratio, high-grade oxide ore to the existing pit design by extending an ore shoot about 80 metres along strike. Visual inspection of drill core indicates that the hole is intersecting mineralisation, with the strongest mineralisation seen from a drill depth of approximately 90 metres.

Robert Benbow, the Company's CEO, commented:

"The ongoing infrastructure construction at Tulkubash has allowed us to get an early start on this year's drilling programme. The drilling programme is designed to extend gold mineralisation along strike from the defined Resource that forms the basis for the recently completed and announced Feasibility Study. The Feasibility Study is the blueprint that defines how we initiate gold production in 2020. The ongoing exploration along strike from the currently defined Resource is the mechanism by which the initial investment is warranted and enhanced."

Dorian L. (Dusty) Nicol, Non-Executive Director and Chair of the Company's Technical Committee, commented:

"We are very excited to begin this season's drilling programme at Tulkubash. We are planning an aggressive programme of 30,000 metres of diamond drilling this year, and the same again in 2019, with the objective of greatly expanding the oxide gold resource defined at Tulkubash. The highest priority of the drilling will be to add Measured and Indicated gold ounces near the current resource boundary, with the objective of moving as high a percentage as possible of these ounces to reserves for addition to the Tulkubash mine plan. The drilling programme will be designed to maximise additions to the resource base and also to maximise the ratio of resource to reserve conversion. Our target is to at least double the oxide resource as a result of this, and next year's, drilling.

"Our ongoing exploration and drilling will continue to build on our ever-increasing knowledge and geologic understanding of the deposit. Our 2017 drilling programme comprised 17,400 metres of drilling, roughly half of what is envisioned for each of the next two drill seasons, and added 287,000 ounces of gold to Measured and Indicated Resource, over an additional strike length of about one kilometre, while increasing the average grade by 25%. This was accomplished at an all-in discovery cost of under $20/ounce, amongst the lowest I have experienced in this industry.

"In addition to near-term mine life addition, some drilling will be carried out to document the further extent of Tulkubash mineralisation along strike. To date, only 2.2 kilometres has been explored of a 24 kilometre strike length of favourable geology with coincident outcropping ore-grade gold mineralisation and gold-in-soil anomalies. Some of the gold-in-soil anomalies along strike from the currently defined resource are larger and higher grade than the surface anomaly associated with the current resource. As an exploration geologist, I am confident that much oxide gold mineralisation remains to be found within our licenses and I am by no means certain that we have found the richest part of the deposit yet."

The Company will update the market regularly as assay results are received from the ongoing drilling.

Throughout the winter, the Company has continued to advance engineering design and construction of infrastructure for the mine. The detailed engineering of the heap leach facility is approximately 90% complete and design of the plant facilities kicked off in January of this year. Access road construction continued throughout the winter with a focus on excavation and blasting. As the weather warms, fill and placement of road bases are ramping back up. Communication system components are being fabricated in Bishkek and will be delivered to the mine site in May. Major construction activities are planned in the mine and heap leach areas this summer. Updates will be provided as these activities progress.

Competent Person

The Competent Person (CP) for the Company on technical aspects of this Press Release is Dorian L. (Dusty) Nicol, FAussIMM, a Non-Executive Director of the Company and Chair of the Company's Technical Committee.

Enquiries:

Chaarat Gold Holdings Limited + 44 (0) 20 7499 2612

Martin Andersson - Chairman info@chaarat.com

Robert Benbow - Chief Executive Officer

 

Numis Securities Limited +44 (0) 20 7260 1000

John Prior, Paul Gillam (NOMAD)

James Black (Corporate Broking)

 

BMO Capital Markets Limited +44 (0) 20 7236 1010

Jeffrey Couch, Neil Haycock,Thomas Rider (Joint Broker)

 

Blytheweigh (Financial PR) +44 (0) 20 7138 3204

Tim Blythe

Camilla Horsfall

 

 

NOTES TO EDITORS:

About Chaarat Gold

Chaarat Gold is an exploration and development company operating in the Kyrgyz Republic with a large, high grade resource - the Chaarat Gold Project. The Company's key objective is to become a long term, low-cost gold producer focused in Central Asia and the former Soviet Union.

Chaarat aims to create value for its shareholders, employees and communities in the Kyrgyz Republic by building relationships based on trust and operating to the best environmental, social and employment standards.

Further information is available at www.chaarat.com

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLDGGDSLGXBGIG
Date   Source Headline
16th Aug 20247:00 amRNSCancellation - Chaarat Gold Holdings Ltd
15th Aug 20245:25 pmRNSDirector Dealings
8th Aug 20243:00 pmRNSResult of General Meeting
22nd Jul 20247:00 amRNSCorporate Update and Appointment of Asset Match
16th Jul 20247:00 amRNSProposed Recapitalisation, Delisting, Notice of GM
2nd Jul 20247:00 amRNSBoard / Management Changes & Corporate Update
5th Jun 20242:15 pmRNSResult of AGM
17th May 20243:28 pmRNSRevised Non-Binding Term Sheet Signed with Xiwang
9th Apr 20247:00 amRNSFull year results for year ended 31 December 2023
27th Mar 20246:06 pmRNSTulkubash Gold Project Financing Update
18th Jan 20247:00 amRNSMaiden MRE at Karator Prospect
22nd Dec 20237:00 amRNSAward & Concurrent Cancellation of Options
5th Dec 20237:00 amRNS£1.8 million Equity Issue
1st Dec 20237:00 amRNSMemorandum of Understanding with Kyrgyz Republic
23rd Nov 20237:00 amRNSMultiple Encouraging Karator Drilling Intercepts
9th Nov 20237:00 amRNSNew Corporate Presentation
8th Nov 20237:00 amRNSMove to SETSqx
6th Nov 20237:00 amRNSAppointment of Nominated Adviser
1st Nov 20237:00 amRNSAppointment of Broker
1st Nov 20237:00 amRNSTulkubash contracts signed
30th Oct 202310:59 amRNSHolding(s) in Company
27th Oct 20237:00 amRNSExtension of Convertible Loan Notes
12th Oct 20232:23 pmRNSGrant of Share Options - REPLACEMENT
12th Oct 202312:41 pmRNSGrant of Share Options
12th Oct 20237:00 amRNSWorking Capital Facility
9th Oct 20237:00 amRNSResignation of Chief Executive Officer
6th Oct 20233:14 pmRNSKapan Sale Completion
7th Sep 20234:30 pmRNSResult of General Meeting
7th Sep 20237:00 amRNSInterim results for six months ended 30 June 2023
21st Aug 20234:20 pmRNSPosting of Notice of General Meeting
16th Aug 20237:00 amRNSConditional Agreement to Sell Kapan Mine
11th Aug 20237:00 amRNSH1 2023 Operational Update
11th Aug 20237:00 amRNSExtension of Convertible Loan Notes
31st Jul 20237:00 amRNSCorporate update
27th Jul 20231:53 pmRNSResult of AGM
10th Jul 202312:00 pmRNSUpdate on Potential Investment
29th Jun 20237:00 amRNSNotice of AGM and Annual Report
15th Jun 20237:01 amRNSSenior Management Changes
15th Jun 20237:00 amRNSFull year results for year ended 31 December 2022
1st Jun 20237:00 amRNSConditional Preliminary Investment Agreement
17th May 20237:00 amRNSLetter of Intent for US$250 million Investment
3rd May 20237:00 amRNSQ1 2023 Operational Update
27th Apr 20237:00 amRNSKapan Ore Reserves
24th Apr 20233:00 pmRNSRestoration - Chaarat Gold Holdings Limited
24th Apr 20233:00 pmRNSUpdate on Suspension
23rd Mar 20233:35 pmRNSFatal Incident at Kapan Mine
9th Feb 20237:00 amRNSFY 2022 Production, Operational & Financial Update
13th Jan 20237:00 amRNSChange of auditor
14th Nov 20227:00 amRNSRule 2.8 Announcement
11th Nov 202212:07 pmRNSForm 8.3 - Chaarat Gold Holdings Ltd

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.