Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBerkeley Mineral Resources Regulatory News (BMR)

  • There is currently no data for BMR

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Update on Feilong Progress

6 Nov 2012 07:00

RNS Number : 3818Q
Berkeley Mineral Resources PLC
06 November 2012
 



BERKELEY MINERAL RESOURCES PLC

("BMR" or "the Company")

 

Further update on progress with Feilong

 

On 13 September 2012, Berkeley Mineral Resources, the metals processing company, updated shareholders on the initial reports of tests by Yunnan Xiangyun Feilong Nonferrous Metal Company ("Feilong") on the representative samples of the mine tailings the Company owns in Kabwe, Zambia. Feilong, with whom BMR has a Memorandum of Understanding ("MOU"), is carrying out the metallurgical and processing testing at its industrial complex in Yunnan Province, in the Peoples Republic of China ("PRC").

 

BMR recently conducted a further site visit to Feilong's PRC plant. Detailed technical discussions have reaffirmed that the lead and zinc combined average head-grade in the washplant samples is 17.5% and in the leachplant samples it is 12%.

 

In addition to the minor metals contained in the tailings (referred to in the announcement of 13 September), recent metallurgical testing has also quantified that 28% of the tailings material comprises iron.

 

To maximise recoveries and economic returns, Feilong foresee a three-stage process. First stage crushing and cyclone processes will remove the non-metallic material. Magnetic separation will then segregate the iron which will be extracted and sold in the form of an iron oxide powder (FeO) with a grade of some 60%, thereby adding to the commercial value of the tailings.

 

The final extraction process on the remaining metallic feed material containing the lead, zinc and minor metals will utilise the Waelz Kiln method which is expected to deliver recovery rates exceeding 90%. These processes are to be confirmed in a written report and flow sheet to be received by BMR from Feilong.

 

The additional processes have not yet been tested, but are deemed necessary in order to ensure that the beneficiation plant maximises the returns from the Kabwe tailings. In order to complete the testing phase, BMR is currently despatching two further representative one-tonne samples to Feilong, one each of washplant and leachplant tailings.

The entire beneficiation process would be waterless and the resultant products and tailings discharge would be of a dry nature. This is expected to have very positive environmental benefits, as well as being commercially beneficial as the waste could be used for construction purposes. No pollution to downstream water systems is therefore anticipated.

Masoud Alikhani, Chairman, commented:

 

"BMR is pleased with the progress Feilong are making to determine the optimal beneficiation plan for the substantial resources we have at Kabwe; BMR owns tailings stockpiles containing 6.4 million dry tonnes at 5.48% Pb and 5.50% Zn content. This tonnage includes approximately 3.2Mt of JORC compliant Measured Mineral Resources for the washplant and central leachplant tailings. After the test work and feasibility study are completed, the next step will be for Feilong's representatives to visit Kabwe to enable them to carry out the appropriate plant design".

 

06th November 2012

 

This release has been reviewed by Dennis Human, B.Sc. (Hons), Bus. Admin (Hons), MGSSA, Consulting Geologist to the Company, who is a Qualified Person in accordance with the guidance note for Mining, Oil & Gas Companies issued by the London Stock Exchange in respect of AIM Companies.

 

For further information please contact:

 

Berkeley Mineral Resources Plc

Masoud Alikhani, Chairman

020 7408 7580

 

Seymour Pierce

Stewart Dickson / Jonathan Wright (Corporate Finance)

Jeremy Stephenson / Richard Redmayne (Corporate Broking)

020 7107 8000

 

Lothbury Financial Services

Michael Padley /Gary Middleton

020 3440 7620

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCBRBDBUUGBGDU
Date   Source Headline
28th May 20153:31 pmRNSDirectorate Changes
28th May 20153:30 pmRNSResult of AGM
13th May 20157:00 amRNSDirector/PDMR Dealing
1st May 20157:30 amRNSRestoration - Berkeley Mineral Resources Plc
1st May 20157:00 amRNSCorrection: Interim results
30th Apr 20155:51 pmRNSDirectorate
30th Apr 20155:50 pmRNSInterim results
29th Apr 20157:00 amRNSPosting of AGM notice and changes to the Board
14th Apr 20156:28 pmRNS2014 Final Results
2nd Apr 20157:00 amRNSLeach processing selected for pilot plant
31st Mar 20157:00 amRNSProgress Update
19th Feb 20157:00 amRNSGBP1.0 million Settlement Agreement
2nd Feb 20157:00 amRNSGeneral Update and Board Appointment
11th Dec 20147:00 amRNSUpdate on Investigation
4th Nov 201412:00 pmRNSSuspension - Berkeley Mineral Resources Plc
4th Nov 201412:00 pmRNSTemporary Suspension
23rd Oct 20147:00 amRNSAppointment Of Chairman
20th Oct 20149:15 amRNSBoard Changes
6th Oct 20147:00 amRNSKabwe Final Stage
20th Aug 20142:00 pmRNSShare Issue
19th Aug 20147:00 amRNSZEMA Approval Received
31st Jul 20142:00 pmRNSPlacing Update
7th Jul 20143:30 pmRNSShare Issue
1st Jul 20147:00 amRNSIssue of Equity
24th Jun 20141:30 pmRNSKabwe Update
20th Jun 20141:30 pmRNSKabwe Approval
11th Jun 201411:30 amRNSKabwe Update
5th Jun 20147:00 amRNSChange of Adviser
30th May 20141:00 pmRNSKabwe Update
25th Apr 20144:45 pmRNSExercise of Warrants
23rd Apr 20147:00 amRNSExercise of Warrants
15th Apr 20147:00 amRNSKabwe Update
14th Apr 20147:00 amRNSExercise of Warrants
2nd Apr 201412:00 pmRNSDirectors Dealings
28th Mar 20142:00 pmRNSDirectors Dealings
28th Mar 20147:01 amRNSInterim Results
3rd Feb 20143:39 pmRNSHolding(s) in Company
3rd Feb 20147:00 amRNSKabwe Update: 92% Copper Grade Achieved
27th Jan 20143:45 pmRNSExercise of Share Options
24th Jan 20147:00 amRNSWarrant Amendment
23rd Dec 201312:00 pmRNSResult of AGM
23rd Dec 20137:00 amRNSAGM Statement
19th Dec 20137:00 amRNSKabwe Copper Plant Completed
10th Dec 20137:00 amRNSStrategic Cooperation Agreement
2nd Dec 20137:00 amRNSPreliminary Results - Kabwe Update
11th Nov 20137:00 amRNSKabwe update -Initial Production at Kabwe
23rd Oct 20132:16 pmRNSWarrant Amendment
14th Oct 20137:00 amRNSKabwe Corporate Responsibility Programme
4th Oct 201310:48 amRNSHolding(s) in Company
26th Sep 20137:00 amRNSCopper Update: Kabwe Production Q4

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.