focusIR May 2024 Investor Webinar: Blue Whale, Kavango, Taseko Mines & CQS Natural Resources. Catch up with the webinar here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBerkeley Mineral Resources Regulatory News (BMR)

  • There is currently no data for BMR

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Star Zinc announcement by Galileo Resources Plc

4 Oct 2017 11:01

RNS Number : 6912S
BMR Group PLC
04 October 2017
 

 

 

BMR Group PLC

 

("BMR" or the "Company")

 

Star Zinc announcement by Galileo Resources Plc

 

BMR notes the RNS released today by Galileo Resources Plc (AIM:GLR) in relation to the Star Zinc project, in which BMR retains a 49% equity interest through its stake in Enviro Zambia as announced on 5 September 2017. A copy of the Galileo release is set out below.

 

 

 

For further information:

 

BMR Group PLC 020 7734 7282

 

Alex Borrelli, CEO and Chairman

 

WH Ireland Limited 020 7220 1666

 

NOMAD and Joint Broker

 

Chris Fielding/ Alex Bond

 

Peterhouse Corporate Finance 020 7469 0930

 

Joint Broker

 

Lucy Williams/ Duncan Vasey/ Heena Karani

 

 

Galileo Resources Plc release of 4 October 2017

 

 

Galileo Resources Plc

("Galileo" or "the Company")

Star Zinc Project Update

Highlights

· The Company has reviewed, at current metal prices, an independent positive conceptual study (a) undertaken on the Star Zinc Project ("Project") during 2015

 

· The Company's review of the economic model demonstrates, a conceptual projected IRR of 77% with NPV of $18m (10% discount rate), a 1-year payback at current prevailing Zinc prices of $3000/tonne (t) and $9.1m capex

 

· Galileo intends to initiate a fast track drilling programme in order to upgrade the current non- compliant resource and to test the potential to increase the resource size: estimated cost ± $350k with funding expected out of existing cash resources

 

· This programme envisages, initially twin-hole drilling in the current non-compliant resource in order to upgrade it to JORC code (2012) compliance, followed by new drilling to test the potential to extend the high grade resource east and west and in new ground to the south

 

· The occurrence of high grade (>50% Zn) float, 200metres south of the current open pit presents an exciting prospective new target for mapping and exploration

 

Note (a) The conceptual study is based on open pit mining from the near-surface deposit, a mineral resource of 250,000 t at 20% Zinc for a mine life of 6 years

 

Colin Bird CEO said, " I am pleased that we are advancing a fast track exploration programme for the Star Zinc project. Our initial review suggests that the Project could potentially be developed as a viable stand-alone project without adding further to the resource. However, we believe that the resource could potentially be much bigger and therefore a large proportion of our exploration will focus on increasing the size of project resource and contained zinc metal.

Our acquisition of this project includes, further down the line, an off take agreement, compatibility and amenability of the Star Zinc ore permitting, with JV partner BMR Group plc, who are developing its Kabwe zinc tailings treatment project some 110 km north of Star Zinc. The objective here would be to provide sufficient feed for Kabwe, while pursuing our quest for a much larger project resource.

It is noted that no exploration attempt has been made to identify a possible sulphide feeder origin for the willemite mineralisation, which literature and academia show is often the case in other willemite deposits. The intention is also to test this as a short term mission during exploration."

Star Zinc

The Company recently acquired a 51% interest in the Star Zinc project, a historical, high-grade zinc ("Zn") open pit mine operated intermittently in the 1950s to 1990s. The Zn mineral is predominantly willemite (zinc silicate) hosted in mainly limestone and dolostone (dolomitic rock)

An Independently verified non-JORC compliant hard rock resource has been estimated at 275,166 tonnes @ 20.2% Zn with a cut-off grade of 14% Zn  ("pragmatic case") based on historical approximately 59 diamond drill holes for total 2 578m. At cut off grade of 12% Zn non-JORC resource tonnage increases (18%) to 325,941 tonnes @19.1% Zn (11% increase in Zn metal).

In addition, karstic fill deposits and red soil are locally heavily mineralised with detrital willemite and supergene zinc minerals, which may provide further potential increase to the known resource.

Mineralisation is interpreted to form two shallowly dipping lenses east and west of the open pit, mineralisation of which is around 40m deep, based on the independent model used for the resource calculation.

A number of sub vertical structures recognised in pit outcrop suggests possibility of both vertical and horizontal control of Zn mineralisation.

The Willemite at Star Zinc, fluoresces a bright green in short wave UV light, a mineral characteristic that may find an application in optical sorting. Willemite also, is denser (3.9 g/cm3) than the dolomitic (2.9 g/cm3) host rock, a feature that may find an application in heavy medium separation process, with the potential for reducing the acid consuming dolomite in the ore.

Preliminary metallurgical testwork indicates that the ore is amenable to acid leaching with more than 90% of the zinc leached into solution.

The Company has committed to undertake an 18-month work programme ("Programme") at a cost of $250,000 using reasonable endeavours to complete a preliminary economic assessment of Star Zinc ("PEA"), following which further new shares in Enviro Zambia, the owner of the Project will be be issued to Galileo to increase its aggregate equity interest in therein to 85%; accordingly it expects the Programme to meet this obligation.

Glossary

Detrital loose fragments or grains that have been worn away from rock

Dolomite mineral composed of calcium magnesium carbonate

Dolomitic pertaining to dolomite  

Floats pieces of rock that have been removed and transported from their original outcrop

Karstic pertaining to landscape underlain by limestone (calcium carbonate), which has been eroded by dissolution, producing ridges, fissures and so on

Leaching chemical process of solubilising metals in rock into solution

Supergene pertaining to processes or enrichment that occurs relatively near the surface 

 

This announcement contains inside information for the purposes of Article 7 of Regulation 596/2014.

Technical Sign-Off

Andrew Sarosi, Director of Galileo, who holds a B.Sc. Metallurgy and M.Sc. Engineering, University of Witwatersrand and is a member of the Institute of Materials, Minerals and Mining, is a "qualified person" as defined under the AIM Rules for Companies and a competent person under the reporting standards. The technical parts of this announcement have been prepared under Andrew's supervision and he has approved the release of this announcement.

 

You can also follow Galileo on Twitter: @GalileoResource

For further information, please contact:

Galileo Resources PLC

Colin Bird, Chairman

Andrew Sarosi, Executive Director

Tel +44 (0) 20 7581 4477

 

Tel +44 (0) 1752 221937

 

 

Beaumont Cornish Limited - Nomad

Roland Cornish/James Biddle

Tel +44 (0) 20 7628 3396

 

 

Beaufort Securities Limited - Broker

Jon Bellis/Elliot Hance

Tel +44 (0) 20 7382 8416

 

 

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
FURMIBLTMBAMMRR
Date   Source Headline
20th Jan 20177:00 amRNSVanadium Update
10th Jan 20177:00 amRNSKashitu, Kabwe Prospect Geological Update
6th Jan 20177:00 amRNSWarrant exercise period
29th Dec 20167:00 amRNS2016 Final Results and AGM Notice
6th Dec 20167:00 amRNSKabwe Update and OPEX Costs
29th Nov 201612:40 pmRNSUpdate Re Metal Tiger
28th Nov 201612:00 pmRNSRe Metal Tiger plc
25th Nov 20164:20 pmRNSStatement re. Possible Offer & R 2.9 announcement
17th Nov 201611:00 amRNSExclusive Option Agreement
17th Nov 20169:00 amRNSKabwe Plant Construction Update
14th Nov 20167:11 amRNSOption to Acquire Interest in Ester Project
14th Nov 20167:00 amRNSOption to Acquire Interest in Ester Project
31st Oct 20163:53 pmRNSHolding(s) in Company
28th Oct 20167:00 amRNSPlacing to raise £620,000
3rd Oct 20167:00 amRNSISF Slag Laboratory Tests Completed
28th Sep 20167:00 amRNSWaelz Kiln Slag (WKS) Update
27th Sep 20168:36 amRNSHolding(s) in Company
26th Sep 20162:19 pmRNSHolding(s) in Company
23rd Sep 20167:00 amRNS$5.2m Project Construction&Trade Finance Facility
16th Aug 20167:00 amRNSExclusive Option Agreement
8th Aug 20167:00 amRNSOff-take Agreement and General Update
1st Aug 20167:00 amRNSOfftake Agreement
30th Jun 20167:00 amRNSKabwe Project Update and Activities
1st Jun 20167:00 amRNSPilot Plant Update with Letter of Intent
31st May 20167:00 amRNSExpected costings: Kabwe Pilot Plant construction
17th May 20167:00 amRNSSubmission of Environmental Project Brief to ZEMA
6th May 20167:00 amRNSConfirmation of ZEMA approval
22nd Apr 20167:00 amRNSPlacing and appointment of Joint Broker
24th Mar 20167:00 amRNSInterim Results
24th Feb 20167:00 amRNSConfirmation of ZEMA public hearing
23rd Feb 20164:40 pmRNSHolding(s) in Company
18th Feb 20167:00 amRNSResult of Open Offer
10th Feb 201612:00 pmRNSResult of AGM
28th Jan 20168:04 amRNSZEMA Report Available on Website
15th Jan 20169:11 amRNSOpen Offer -Change to Ex-entitlement and Timetable
15th Jan 20167:00 amRNSOpen Offer
18th Dec 20157:00 amRNSSubmission of Final Report to ZEMA
17th Dec 20157:00 amRNS2015 Final Results and AGM Notice
27th Nov 20158:42 amRNSHolding(s) in Company
9th Nov 20157:00 amRNSSurrender of lease and change of registered office
28th Oct 20156:00 pmRNSPlacing to raise GBP 750,000
16th Oct 20152:20 pmRNSLand & Equipment Lease Update
12th Oct 20157:00 amRNSZEMA Update
5th Oct 20157:00 amRNSPotential market for Waelz Kiln Slag
28th Sep 20157:00 amRNSLand and equipment lease agreement
22nd Sep 20157:00 amRNSBMR's Kabwe treatment project
19th Aug 20157:00 amRNSZEMA Update
31st Jul 20157:00 amRNSSignificant Testing Progress Update
25th Jun 20157:00 amRNSResults of the Metallurgical Test Programme
15th Jun 20157:00 amRNSGrant of Options

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.