North Lanut Drilling Results

13 May 2008 06:57

RNS Number : 2574U
Avocet Mining PLC
13 May 2008
 



AVOCET DRILLING INDICATES POTENTIAL FOR SIGNIFICANT RESOURCE INCREASE AT

NORTH LANUT MINE IN INDONESIA

Avocet Mining PLC ("Avocet" or "the Company") announces encouraging drill hole intersections from resource definition drilling at the Riska open pit at the Company's 80% owned North Lanut gold mine in North Sulawesi, Indonesia.  The drilling to date represents 15,109 metres of a planned 21,200 metre programme. This has consisted of 173 reverse circulation (RC) and 9 diamond drill holes and is part of an ongoing effort to expand the reserves and mine life of the project and explore areas peripheral to and immediately below the currently designed open pit. Highlights include:

The first phase of the drilling programme confirms significantly more mineralisation than previously modelled;

Excellent drilling results on the periphery of the deposit, including oxide and transition ore, indicate potential for increased reserves and resources and an extended life of mine;

Avocet targets an upgrade of the open pit resource by September 2008, following the completion of the remaining 6,100 metres of the current drilling programme.

Table 1 summarises the significant intercepts received to date from this resource definition drilling programme

While several holes have intersected mineralisation both within and outside the current open pit design, the table lists all in pit intersections separately to show the effect of drilling on resource confirmation separately from resource expansion. Except where stated, a 20 g/t Au upper grade cut-off has been applied for reporting purposes and in order to be consistent with methodology used for the resource model. Drill hole locations are laid out in the figure that can be found in the version of this announcement on the Company's website.

Drill hole intercepts within the current open pit design confirm and upgrade the current modelThese include: 83m @ 3.92 g/t Au (RSP352), 76m @ 3.65 g/t Au (RSP351) and 80.5m @ 2.81 g/t Au (NLD333).

The Company is particularly encouraged by the results of drilling on the periphery of the deposit, which represent lateral extensions to oxide and transition mineralisation currently being mined. Significant intercepts on the western flanks suggest potential for highwall layback that would grow reserves and extend mine life, while intercepts on the northernsouthern and south-eastern edges represent potential resource expansions that require minimal additional stripping. The majority of these intersections are from surface or shallow depth. From the RC drilling, the better intercepts on the western margin include: 81m @ 2.99 g/t Au (RSP 425)72m @ 2.27 g/t Au (RSP 465)55m @ 2.73 g/t Au (RSP 344), and 125m @ 1.19 g/t Au (RSP 341). The better intersections on the northern and south-eastern edges include 53m @ 2.94 g/t Au (RSP 397), 41m @ 3.36 g/t Au (RSP 355) and 23m @ 2.53 g/t Au (RSP 356). The better intersections on the southern margin include: 57m @ 2.56 g/t Au (RSP 472) and 64m @ 1.82 g/t Au (RSP 473).

The diamond drilling portion of the programme is evaluating the resource and reserve potential of high-grade sulphide mineralisation below the current designed open pit and providing samples for preliminary metallurgical test work to determine an appropriate gold extraction process and the economic viability of such a process. Initial results from this programme include: 87.50m @ 6.97 g/t Au (NLD 333) and 100m @ 5.74 g/t Au (NLD 334) from the base of the current pit design. The intercepts in NLD 333 and NLD 334 include high-grade zones of 42m @ 15.0 g/t Au (uncut) and 36m @ 18.5 g/t Au (uncut), respectivelyThey are also part of longer intersections through the current resource (NLD 333: 168m @ 4.98 g/t Au and NLD334: 162m @ 4.05 g/t Au).

The Company anticipates remodelling the open pit portion of the Riska resource in the next six months once the current resource definition drilling programme is complete. Avocet is currently planning a deep drilling programme to assess the resource and reserve potential of the deep sulphide resources up to 250 metres below the current designed open pit. This is a new project targeted to add considerably to the mine life of the North Lanut operation.

Commenting on the Riska drilling campaign, Jonathan Henry, Chief Executive Officer, said:

"The drilling results at the producing North Lanut mine indicate that our original resource model is conservative, with numerous high grade intercepts. Like Penjom, North Lanut confirms our strategy of developing larger deposits through ongoing exploration work in and around the current mining areas. The Company's intention is to replicate this strategy on a number of our exploration targets in Indonesia."

For further information please contact:

Avocet Mining PLC
 
Buchanan Communications Financial PR Consultants
Ambrian Partners Limited
NOMAD and Joint Broker
JPMorgan Cazenove
Lead Broker
 
Jonathan Henry, Chief Executive Officer
Mike Norris, Finance Director
020 7907 9000
 
www.avocet.co.uk
Bobby Morse
Robin Haddrill
020 7466 5000
 
www.buchanan.uk.com
Richard Brown
Richard Greenfield
020 7634 4700
 
www.ambrian.com
Michael Wentworth-Stanley
Sam Critchlow
020 7588 2828
 
www.jpmorgancazenove.com

 

 

Notes to Editors

Avocet is a mining company listed on the AIM market of the London Stock Exchange (Ticker: AVM). The Company's principal activities are gold mining and exploration in Malaysia (as 100% owner of the Penjom mine, the country's largest gold producer), and Indonesia (as 80% owner of the North Lanut gold mine and Bakan project in North Sulawesi). The Company has a number of other advanced mining and exploration projects in South East Asia.

All references to resources and exploration results have been approved for release by Mr Peter Flindell, BSc (Hons) MAusIMM, Chief Geologist for Avocet, who has more than 20 years experience in the field of activity concerned and is a Competent Person as defined by the JORC Code (2004). He has consented to the inclusion of the material in the form and context in which it appears. 

Table 1: Significant drill hole intercepts at Riska, North Lanut, Indonesia

Hole
East
North
RL
Azimuth
Dip
Depth
From
To
Interval
Grade
Comments
 
ID
(m)
(m)
(m)
(°)
(°)
(m)
(m)
(m)
(m)
(g/t Au)
 
 
RC DRILLING
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
RSP 336
9949.8
9945.8
695.8
0
-90
125.0
106.0
116.0
10.0
0.48
 
 
RSP 337
9952.9
9979.9
694.9
0
-90
125.0
0.0
5.0
5.0
1.43
intercept inside pit
 
 
 
 
 
 
 
 
5.0
32.0
27.0
0.93
 
 
 
 
 
 
 
 
 
110.0
125.0
15.0
0.43
Hole terminated in mineralisation
 
RSP 338
9965.1
10000.1
694.9
0
-90
125.0
0.0
10.0
10.0
3.02
intercept inside pit
 
 
 
 
 
 
 
 
19.0
57.0
38.0
1.92
 
 
RSP 339
9978.9
10019.7
695.3
0
-90
125.0
9.0
59.0
50.0
1.21
 
 
RSP 340
9998.4
10039.6
695.5
0
-90
125.0
31.0
46.0
15.0
0.63
 
 
RSP 341
9960.5
9936.1
695.1
0
-90
125.0
0.0
125.0
125.0
1.19
Hole terminated in mineralisation
 
RSP 342
10015.9
10017.0
690.1
0
-90
135.0
0.0
36.0
36.0
1.35
intercept inside pit
 
RSP 343
10001.9
10011.1
690.4
0
-90
111.0
0.0
40.0
40.0
5.18
intercept inside pit
 
 
 
 
 
 
 
 
40.0
54.0
14.0
0.62
 
 
RSP 344
9990.8
9999.1
690.4
0
-90
106.0
0.0
41.0
41.0
2.03
intercept inside pit
 
 
 
 
 
 
 
 
41.0
96.0
55.0
2.73
 
 
RSP 345
9981.4
9986.0
690.0
0
-90
90.0
0.0
40.0
40.0
1.73
intercept inside pit
 
 
 
 
 
 
 
 
40.0
67.0
27.0
1.83
 
 
 
 
 
 
 
 
 
83.0
90.0
7.0
0.73
Hole terminated in mineralisation
 
RSP 346
9981.6
9968.6
689.9
0
-90
88.0
0.0
30.0
30.0
3.75
intercept inside pit
 
 
 
 
 
 
 
 
60.0
88.0
28.0
1.56
Hole terminated in mineralisation
 
RSP 347
9983.4
9952.4
690.0
0
-90
125.0
0.0
35.0
35.0
2.39
intercept inside pit
 
 
 
 
 
 
 
 
67.0
100.0
33.0
1.55
 
 
 
 
 
 
 
 
 
104.0
125.0
21.0
0.80
Hole terminated in mineralisation
 
RSP 350
10074.0
10183.6
700.9
0
-90
66.0
12.0
17.0
5.0
0.74
intercept inside pit
 
 
 
 
 
 
 
 
36.0
61.0
25.0
0.83
 
 
RSP 351
10005.6
9967.3
685.7
0
-90
90.0
0.0
76.0
76.0
3.65
intercept inside pit
 
 
 
 
 
 
 
 
76.0
90.0
14.0
1.77
Hole terminated in mineralisation
 
RSP 352
10048.9
9972.2
684.8
0
-90
83.0
0.0
83.0
83.0
3.92
intercept inside pit
 
RSP 353
10116.2
9872.1
685.2
225
-65
40.0
8.0
21.0
13.0
1.05
 
 
RSP 354
10116.6
9898.9
688.3
225
-65
60.0
37.0
51.0
14.0
0.83
 
 
RSP 355
10145.2
9864.6
685.3
225
-65
41.0
0.0
41.0
41.0
3.36
Hole terminated in mineralisation
 
RSP 356
10158.4
9870.7
685.2
225
-65
60.0
21.0
44.0
23.0
2.53
 
 
 
 
 
 
 
 
 
56.0
60.0
4.0
0.88
Hole terminated in mineralisation
 
RSP 357
10183.6
9836.6
662.8
225
-65
45.0
0.0
4.0
4.0
2.61
 
 
 
 
 
 
 
 
 
30.0
39.0
9.0
0.58
 
 
RSP 358
10191.6
9843.8
663.1
45
-65
70.0
6.0
11.0
5.0
0.80
intercept inside pit
 
 
 
 
 
 
 
 
21.0
48.0
27.0
1.20
 
 
RSP 374
9809.2
10157.4
792.8
225
-60
50.0
34.0
48.0
14.0
0.74
 
 
RSP 375
9835.5
10152.3
791.7
225
-60
50.0
23.0
36.0
13.0
0.55
 
 
RSP 376
9846.8
10131.2
791.5
225
-60
50.0
0.0
13.0
13.0
1.07
 
 
 
 
 
 
 
 
 
17.0
33.0
16.0
1.24
 
 
 
 
 
 
 
 
 
40.0
50.0
10.0
1.10
Hole terminated in mineralisation
 
RSP 377
9847.2
10133.7
791.7
175
-60
70.0
0.0
28.0
28.0
1.06
 
 
RSP 378
9838.2
10118.4
791.9
225
-60
50.0
0.0
10.0
10.0
0.55
 
 
RSP 379
9827.4
10145.1
792.3
225
-60
91.0
17.0
29.0
12.0
1.07
 
 
 
 
 
 
 
 
 
54.0
88.0
34.0
2.45
 
 
RSP 380
9807.2
10159.3
792.9
45
-60
50.0
17.0
29.0
12.0
0.69
 
 
RSP 381
9857.0
10142.0
790.9
225
-50
50.0
17.0
49.0
32.0
1.25
 
 
RSP 382
9864.3
10155.7
790.6
225
-50
55.0
26.0
31.0
5.0
0.38
 
 
 
 
 
 
 
 
 
50.0
53.0
3.0
0.91
 
 
RSP 383
10113.6
9850.4
685.1
45
-60
76.0
7.0
12.0
5.0
0.97
 
 
 
 
 
 
 
 
 
29.0
39.0
10.0
0.61
 
 
 
 
 
 
 
 
 
49.0
71.0
22.0
0.86
 
 
RSP 384
10128.6
9881.2
687.2
225
-60
55.0
0.0
13.0
13.0
0.89
 
 
 
 
 
 
 
 
 
17.0
36.0
19.0
0.85
 
 
RSP 385
9966.3
10001.7
690.4
0
-90
87.0
0.0
62.0
62.0
1.80
 
 
RSP 386
10134.4
9822.6
676.8
45
-60
64.0
13.0
18.0
5.0
0.94
 
 
 
 
 
 
 
 
 
45.0
59.0
14.0
2.97
 
 
RSP 387
10148.0
9836.2
675.9
225
-60
60.0
0.0
10.0
10.0
1.99
 
 
 
 
 
 
 
 
 
39.0
54.0
15.0
0.77
 
 
RSP 388
10223.8
9855.7
660.5
225
-60
50.0
0.0
8.0
8.0
0.41
 
 
RSP 390
10178.1
9827.8
663.1
45
-60
42.0
26.0
38.0
12.0
0.86
 
 
RSP 393
10005.9
9898.5
690.4
0
-90
50.0
23.0
30.0
7.0
0.57
 
 
RSP 395
10156.1
10128.9
691.4
260
-70
47.0
12.0
24.0
12.0
0.58
 
 
RSP 396
10075.5
10160.5
695.1
45
-60
63.0
25.0
63.0
38.0
1.45
Hole terminated in mineralisation
 
RSP 397
10095.6
10185.3
695.3
0
-90
82.0
16.0
69.0
53.0
2.94
 
 
RSP 398
10145.7
10059.5
690.0
45
-60
65.0
0.0
20.0
20.0
0.35
intercept inside pit
 
 
 
 
 
 
 
 
51.0
64.0
13.0
0.71
 
 
RSP 399
10151.8
10150.7
694.0
260
-70
64.0
15.0
32.0
17.0
0.43
intercept inside pit
 
 
 
 
 
 
 
 
44.0
59.0
15.0
0.33
 
 
RSP 403
9954.5
9914.6
700.5
45
-60
80.0
32.0
80.0
48.0
1.74
Hole terminated in mineralisation
 
RSP 404
9948.7
9916.1
700.3
330
-60
63.0
4.0
17.0
13.0
0.79
 
 
 
 
 
 
 
 
 
22.0
27.0
5.0
0.60
 
 
RSP 405
10194.8
9971.2
698.6
45
-60
65.0
4.0
22.0
18.0
1.37
intercept inside pit
 
 
 
 
 
 
 
 
40.0
59.0
19.0
0.49
 
 
RSP 406
10172.5
10009.0
692.3
45
-60
69.0
29.0
35.0
6.0
0.44
 
 
 
 
 
 
 
 
 
52.0
60.0
8.0
0.38
 
 
RSP 407
10216.7
10019.7
693.0
225
-60
81.0
29.0
66.0
37.0
0.72
 
 
 
 
 
 
 
 
 
72.0
81.0
9.0
0.48
Hole terminated in mineralisation
 
RSP 408
10199.0
10074.7
690.1
225
-60
75.0
43.0
63.0
20.0
0.69
 
 
RSP 409
10222.2
9928.3
680.5
45
-60
56.0
3.0
14.0
11.0
0.58
 
 
 
 
 
 
 
 
 
20.0
37.0
17.0
0.59
 
 
RSP 411
10192.9
9935.8
687.9
45
-60
60.0
41.0
53.0
12.0
0.44
 
 
RSP 412
10241.7
9968.3
679.8
225
-60
60.0
0.0
16.0
16.0
0.46
 
 
 
 
 
 
 
 
 
24.0
40.0
16.0
0.64
 
 
RSP 414
10102.3
10219.3
717.4
270
-70
120.0
65.0
69.0
4.0
0.64
 
 
RSP 416
10119.2
10223.0
715.3
270
-70
120.0
89.0
96.0
7.0
0.47
 
 
RSP 418
10090.1
10182.2
695.4
0
-70
100.0
20.0
40.0
20.0
1.36
 
 
 
 
 
 
 
 
 
49.0
73.0
24.0
0.83
 
 
RSP 419
10102.6
10182.4
695.2
0
-70
100.0
0.0
8.0
8.0
1.31
 
 
RSP 421
9952.0
9911.9
700.5
360
-60
66.0
17.0
47.0
30.0
1.78
 
 
RSP 424
9967.8
9899.7
697.8
0
-60
120.0
50.0
77.0
27.0
1.98
 
 
 
 
 
 
 
 
 
87.0
95.0
8.0
1.65
 
 
 
 
 
 
 
 
 
110.0
120.0
10.0
0.72
Hole terminated in mineralisation
 
RSP 425
9839.9
10159.9
791.3
225
-65
150.0
20.0
23.0
3.0
0.48
 
 
 
 
 
 
 
 
 
31.0
38.0
7.0
0.50
 
 
 
 
 
 
 
 
 
64.0
145.0
81.0
2.99
 
 
RSP 426
9859.5
10179.7
787.5
0
-90
100.0
26.0
37.0
11.0
1.17
 
 
RSP 427
9846.4
10130.6
791.6
145
-60
113.0
0.0
15.0
15.0
0.78
 
 
 
 
 
 
 
 
 
19.0
34.0
15.0
2.73
 
 
 
 
 
 
 
 
 
89.0
98.0
9.0
0.78
 
 
RSP 428
9771.1
10109.8
817.0
70
-65
130.0
68.0
104.0
36.0
1.27
 
 
RSP 432
9816.2
10134.2
792.5
225
-60
95.0
5.0
47.0
42.0
1.41
 
 
RSP 433
9798.6
10148.5
792.6
225
-60
62.0
9.0
16.0
7.0
0.44
 
 
RSP 434
9810.6
10162.2
792.7
225
-70
70.0
17.0
21.0
4.0
0.71
 
 
 
 
 
 
 
 
 
30.0
35.0
5.0
0.49
 
 
RSP 435
10048.2
10204.7
724.1
180
-60
79.0
3.0
35.0
32.0
0.59
 
 
RSP 436
10014.8
10207.1
734.4
180
-60
74.0
15.0
21.0
6.0
1.04
 
 
 
 
 
 
 
 
 
26.0
33.0
7.0
1.06
 
 
RSP 437
9971.5
10209.5
745.9
180
-60
70.0
15.0
29.0
14.0
1.41
 
 
RSP 439
9879.7
10228.9
767.4
180
-60
90.0
46.0
53.0
7.0
0.40
 
 
 
 
 
 
 
 
 
60.0
67.0
7.0
0.90
 
 
RSP 440
9978.5
9928.5
685.5
180
-60
75.0
0.0
6.0
6.0
3.03
intercept inside pit
 
 
 
 
 
 
 
 
6.0
39.0
33.0
1.61
 
 
 
 
 
 
 
 
 
46.0
49.0
3.0
0.77
 
 
RSP 441
9977.7
9959.0
685.3
180
-70
81.0
0.0
33.0
33.0
2.41
intercept inside pit
 
 
 
 
 
 
 
 
55.0
81.0
26.0
2.10
Hole terminated in mineralisation
 
RSP 442
10017.9
10026.9
685.6
0
-60
81.0
0.0
5.0
5.0
0.92
intercept inside pit
 
 
 
 
 
 
 
 
27.0
34.0
7.0
0.32
intercept inside pit
 
 
 
 
 
 
 
 
60.0
78.0
18.0
0.70
 
 
RSP 443
9998.1
9995.4
684.8
0
-70
110.0
0.0
43.0
43.0
1.26
intercept inside pit
 
 
 
 
 
 
 
 
43.0
62.0
19.0
0.90
 
 
RSP 444
10037.6
10048.3
685.1
0
-60
81.0
0.0
12.0
12.0
0.39
intercept inside pit
 
 
 
 
 
 
 
 
45.0
72.0
27.0
0.79
 
 
RSP 445
10057.9
10069.6
690.2
0
-70
100.0
0.0
20.0
20.0
0.43
intercept inside pit
 
 
 
 
 
 
 
 
24.0
35.0
11.0
0.82
 
 
 
 
 
 
 
 
 
58.0
67.0
9.0
0.41
 
 
RSP 446
10038.1
10016.3
685.0
0
-70
110.0
0.0
58.0
58.0
1.10
intercept inside pit
 
 
 
 
 
 
 
 
58.0
85.0
27.0
0.71
 
 
RSP 447
10038.0
9966.2
682.1
180
-75
125.0
0.0
64.0
64.0
1.65
intercept inside pit
 
 
 
 
 
 
 
 
64.0
88.0
24.0
1.85
 
 
RSP 448
10057.9
10031.0
684.4
0
-60
105.0
1.0
23.0
22.0
0.90
intercept inside pit
 
 
 
 
 
 
 
 
38.0
45.0
7.0
0.45
intercept inside pit
 
 
 
 
 
 
 
 
57.0
76.0
19.0
0.49
 
 
RSP 449
10077.9
10058.9
685.0
0
-60
93.0
0.0
3.0
3.0
0.92
intercept inside pit
 
 
 
 
 
 
 
 
7.0
23.0
16.0
0.59
 
 
 
 
 
 
 
 
 
27.0
71.0
44.0
1.11
 
 
RSP 450
10117.9
9974.0
684.9
0
-60
111.0
0.0
81.0
81.0
1.35
intercept inside pit
 
RSP 451
10116.3
10060.5
690.2
0
-60
38.0
15.0
29.0
14.0
0.69
intercept inside pit
 
RSP 452
10116.4
10060.4
689.8
0
-60
99.0
16.0
25.0
9.0
0.44
intercept inside pit
 
 
 
 
 
 
 
 
25.0
79.0
54.0
0.64
 
 
RSP 453
10098.0
10091.0
690.3
180
-60
150.0
10.0
23.0
13.0
0.62
intercept inside pit
 
 
 
 
 
 
 
 
23.0
78.0
55.0
0.92
 
 
RSP 454
10178.0
9963.2
689.4
0
-60
100.0
0.0
48.0
48.0
0.92
intercept inside pit
 
 
 
 
 
 
 
 
61.0
70.0
9.0
1.65
 
 
 
 
 
 
 
 
 
74.0
92.0
18.0
0.48
 
 
RSP 455
10180.7
9986.8
689.7
0
-60
75.0
21.0
36.0
15.0
0.84
intercept inside pit
 
 
 
 
 
 
 
 
36.0
63.0
27.0
0.65
 
 
RSP 456
10137.9
10077.2
689.5
0
-60
96.0
10.0
21.0
11.0
0.41
intercept inside pit
 
 
 
 
 
 
 
 
65.0
87.0
22.0
0.82
 
 
RSP 457
10139.1
10150.7
694.8
180
-65
105.0
16.0
21.0
5.0
2.87
intercept inside pit
 
 
 
 
 
 
 
 
70.0
86.0
16.0
0.68
 
 
RSP 458
10117.9
10141.4
691.7
180
-60
100.0
10.0
36.0
26.0
1.19
intercept inside pit
 
 
 
 
 
 
 
 
36.0
80.0
44.0
1.00
 
 
RSP 459
10118.1
10147.1
689.9
0
-90
75.0
44.0
57.0
13.0
0.52
 
 
RSP 460
10077.9
10134.7
690.0
180
-60
110.0
3.0
25.0
22.0
0.67
intercept inside pit
 
 
 
 
 
 
 
 
25.0
45.0
20.0
0.59
 
 
 
 
 
 
 
 
 
49.0
78.0
29.0
0.71
 
 
RSP 461
10078.3
10153.8
690.4
180
-70
111.0
18.0
24.0
6.0
0.63
intercept inside pit
 
 
 
 
 
 
 
 
24.0
64.0
40.0
1.06
 
 
RSP 462
10157.9
10121.3
690.2
180
-75
93.0
57.0
65.0
8.0
0.52
 
 
RSP 463
9962.4
9989.3
685.3
270
-55
120.0
0.0
31.0
31.0
0.93
 
 
RSP 464
9972.2
10004.4
684.9
270
-60
123.0
0.0
50.0
50.0
1.81
 
 
RSP 465
9981.8
10017.3
684.7
270
-60
125.0
0.0
72.0
72.0
2.27
 
 
RSP 466
10098.0
10000.8
684.5
0
-60
125.0
2.0
54.0
52.0
1.39
intercept inside pit
 
 
 
 
 
 
 
 
59.0
76.0
17.0
0.49
intercept inside pit
 
RSP 467
10078.0
9989.5
684.5
180
-60
101.0
0.0
85.0
85.0
3.79
intercept inside pit
 
 
 
 
 
 
 
 
85.0
100.0
15.0
1.06
 
 
RSP 468
10097.8
10000.6
684.4
180
-65
117.0
0.0
80.0
80.0
1.71
intercept inside pit
 
 
 
 
 
 
 
 
80.0
104.0
24.0
2.22
 
 
RSP 469
10078.1
10019.1
684.3
0
-60
100.0
0.0
36.0
36.0
1.64
intercept inside pit
 
 
 
 
 
 
 
 
66.0
74.0
8.0
0.62
 
 
RSP 470
10097.7
9926.7
680.2
180
-60
90.0
40.0
65.0
25.0
0.64
 
 
RSP 471
10078.1
9931.3
679.9
180
-60
95.0
0.0
35.0
35.0
0.72
intercept inside pit
 
 
 
 
 
 
 
 
35.0
75.0
40.0
0.95
 
 
RSP 472
10057.7
9945.0
679.6
180
-60
115.0
0.0
34.0
34.0
0.91
intercept inside pit
 
 
 
 
 
 
 
 
34.0
91.0
57.0
2.56
 
 
RSP 473
10037.8
9940.3
679.5
180
-60
129.0
0.0
25.0
25.0
0.67
intercept inside pit
 
 
 
 
 
 
 
 
25.0
89.0
64.0
1.82
 
 
 
 
 
 
 
 
 
108.00
112.00
4.00
0.55
 
 
RSP 474
10017.9
9921.1
679.9
180
-60
99.0
0.00
29.00
29.00
0.68
intercept inside pit
 
 
 
 
 
 
 
 
59.00
80.00
21.00
0.50
 
 
RSP 475
10058.0
9913.9
679.8
180
-60
97.0
0.00
22.00
22.00
2.43
intercept inside pit
 
 
 
 
 
 
 
 
22.00
40.00
18.00
1.12
 
 
 
 
 
 
 
 
 
44.00
71.00
27.00
0.44
 
 
 
 
 
 
 
 
 
75.00
85.00
10.00
0.34
 
 
RSP 476
10117.9
10030.7
685.1
180
-60
130.0
0.00
78.00
78.00
4.30
intercept inside pit
 
 
 
 
 
 
 
 
78.00
110.00
32.00
3.99
 
 
 
 
 
 
 
 
 
124.00
130.00
6.00
0.71
Hole terminated in mineralisation
 
RSP 477
10137.7
9940.2
684.9
0
-60
135.0
0.00
10.00
10.00
0.81
intercept inside pit
 
 
 
 
 
 
 
 
46.00
93.00
47.00
4.71
 
 
RSP 478
10157.5
9902.9
684.5
180
-60
120.0
23.00
72.00
49.00
0.89
 
 
RSP 480
10157.9
9940.8
684.7
0
-60
129.0
31.00
37.00
6.00
0.82
 
 
 
 
 
 
 
 
 
43.00
65.00
22.00
1.12
 
 
RSP 481
10195.2
9897.1
682.2
180
-60
105.0
0.00
4.00
4.00
0.31
 
 
 
 
 
 
 
 
 
8.00
25.00
17.00
0.60
 
 
 
 
 
 
 
 
 
30.00
70.00
40.00
2.27
 
 
 
 
 
 
 
 
 
78.00
90.00
12.00
1.74
 
 
RSP 482
10179.1
9901.8
684.4
180
-60
135.0
0.00
11.00
11.00
1.01
 
 
 
 
 
 
 
 
 
30.00
69.00
39.00
1.44
 
 
RSP 483
10138.5
10004.0
684.8
180
-60
111.0
5.00
29.00
24.00
1.66
intercept inside pit
 
 
 
 
 
 
 
 
43.00
88.00
45.00
3.18
 
 
RSP 484
10140.3
9934.9
684.9
180
-60
120.0
0.00
4.00
4.00
0.59
intercept inside pit
 
 
 
 
 
 
 
 
55.00
67.00
12.00
0.55
 
 
RSP 485
10138.2
9986.1
684.5
0
-60
120.0
0.00
47.00
47.00
3.05
intercept inside pit
 
 
 
 
 
 
 
 
52.00
76.00
24.00
0.59
 
 
RSP 486
10158.3
10017.5
685.2
0
-60
90.0
35.00
75.00
40.00
0.55
 
 
RSP 487
10157.7
9979.9
684.3
0
-60
102.0
0.00
40.00
40.00
1.02
intercept inside pit
 
 
 
 
 
 
 
 
40.00
75.00
35.00
1.14
 
 
RSP 488
10098.1
9884.6
684.4
0
-60
82.0
0.00
21.00
21.00
0.40
intercept inside pit
 
 
 
 
 
 
 
 
25.00
75.00
50.00
1.26
 
 
RSP 496
10098.0
10049.9
684.9
180
-60
135.0
0.00
22.00
22.00
0.93
intercept inside pit
 
 
 
 
 
 
 
 
32.00
87.00
55.00
0.99
intercept inside pit
 
 
 
 
 
 
 
 
110.00
129.00
19.00
2.23
 
 
RSP 500
10120.5
10113.9
688.7
180
-60
31.0
5.00
16.00
11.00
0.53
intercept inside pit
 
 
 
 
 
 
 
 
16.00
31.00
15.00
0.65
Hole terminated in mineralisation
 
 
 
 
 
 
 
 
 
 
 
 
 
 
DIAMOND DRILLING
 
 
 
 
 
 
 
 
 
 
 
 
 
NLD 331
9977.7
9990.9
685.1
180
-80
145.2
0.00
34.80
34.80
1.43
intercept inside pit
 
 
 
 
 
 
 
 
34.80
62.80
28.00
0.99
 
 
 
 
 
 
 
 
 
78.80
99.80
21.00
0.81
 
 
NLD 332
10077.1
10044.7
685.3
180
-60
150.00
3.00
90.00
87.00
1.28
intercept inside pit
 
 
 
 
 
 
 
 
109.00
122.00
13.00
1.59
 
 
NLD 333
10017.9
10013.6
684.8
180
-70
183.2
0.00
80.50
80.50
2.81
intercept inside pit
 
 
 
 
 
 
 
 
80.50
168.00
87.50
6.97
incl. 36m @ 12.7 g/t Au
 
NLD 334
10038.3
10032.1
684.8
180
-65
171.1
0.00
62.00
62.00
1.32
intercept inside pit
 
 
 
 
 
 
 
 
62.00
162.00
100.00
5.74
incl. 42m @ 12.5 g/t Au
 
NLD 335
9990.3
9999.8
684.9
180
-70
127.7
0.00
58.00
58.00
1.67
intercept inside pit
 
 
 
 
 
 
 
 
58.00
99.00
41.00
1.09
 
 
NLD 336
10057.8
9975.4
680.0
0
-80
150.5
0.00
80.00
80.00
1.76
intercept inside pit
 
 
 
 
 
 
 
 
80.00
144.50
64.50
2.97
 
 
NLD 337
10037.8
9926.7
679.5
0
-70
145.2
0.00
53.40
53.40
0.61
intercept inside pit
 
 
 
 
 
 
 
 
53.40
82.80
29.40
1.13
 
 
 
 
 
 
 
 
 
125.60
145.20
19.60
5.88
Hole terminated in mineralisation
 
NLD 338
10078.0
9906.6
680.1
0
-60
153.3
0.00
7.50
7.50
0.76
intercept inside pit
 
 
 
 
 
 
 
 
26.00
88.00
62.00
1.42
intercept inside pit
 
NLD 339
10098.1
9927.2
680.0
0
-60
135.9
48.00
79.00
31.00
0.91
intercept inside pit
 
 
 
 
 
 
 
 
89.00
121.00
32.00
1.73
 
 
 
Note:
 
Individual gold assays have a top cut of 20 g/t Au and a lower cut of 0.3 g/t Au for intercept calculations. Maximum internal waste allowed is 3m and a mineralisied interval is 0.5m.
 
All holes are drilled from surface using conventional reverse circulation (RC) or triple-tube diamond drilling techniques.
 
Intercepts outside pit unless marked. 
 
This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLKLLFFVEBLBBD
Date   Source Headline
21st Aug 20195:04 pmRNSAdministration
15th Aug 20194:00 pmRNSResults of General Meeting
26th Jul 20197:00 amRNSNotice of General Meeting
26th Jul 20197:00 amRNSNotice of General Meeting
18th Jul 201912:00 pmRNSResults of General Meeting
16th Jul 20191:23 pmRNSWithdrawal of General Meeting Resolutions
28th Jun 20197:00 amRNSStrategic review and Notice of General Meeting
18th Jun 20193:19 pmRNSDisposal of interest in Tri-K project
1st May 20197:30 amRNSSuspension Avocet Mining Plc
1st May 20197:00 amRNSSuspension of listing
25th Mar 201912:07 pmRNSSecond Price Monitoring Extn
25th Mar 201912:02 pmRNSPrice Monitoring Extension
22nd Feb 20194:41 pmRNSSecond Price Monitoring Extn
22nd Feb 20194:36 pmRNSPrice Monitoring Extension
1st Oct 20187:00 amRNSInterim Results
5th Sep 20187:00 amRNSTri-K Update
3rd Aug 20187:00 amRNSTri-k Update
26th Jul 201812:30 pmRNSResults of Annual General Meeting 2018
4th Jul 20186:16 pmRNS2017 Full Year Results
4th Jul 20186:16 pmRNSNotice for the Adjourned Meeting
29th Jun 20185:10 pmRNSNotice of Adjourned Annual General Meeting
6th Jun 20187:00 amRNSNotice of Annual General Meeting 2018
1st May 20187:00 amRNSSuspension of listing
19th Mar 20187:00 amRNSChanges to the Board
16th Mar 20187:00 amRNSAvocet disposes of one of its subsidiaries
9th Feb 20187:00 amRNSCOMPLETION OF THE SALE OF RESOLUTE LIMITED
31st Jan 20187:00 amRNSSale of Resolute Limited to the Balaji Group
26th Jan 20187:00 amRNSSale of Resolute Limited to the Balaji Group
12th Jan 20187:00 amRNSSale of Resolute Limited to the Balaji Group
18th Dec 20171:00 pmRNSAgreed the sale of its Burkina Faso assets
2nd Oct 20177:15 amRNSUnaudited Interim Results
27th Sep 20172:20 pmRNSUpdate on Events in Burkina Faso
25th Sep 20177:00 amRNSUpdate on SMB balance sheet restructuring
18th Sep 20177:00 amRNSUpdate on SMB balance sheet restructuring
11th Sep 20177:00 amRNSUpdate on SMB balance sheet restructuring
8th Sep 20177:00 amRNSDirectorate change
4th Sep 20177:00 amRNSExpiry of the Standstill Agreement
29th Aug 20177:00 amRNSUpdate on the Discussion with SMB Creditors
21st Aug 20177:05 amRNSUpdate on the Discussion with SMB Creditors
15th Aug 20177:00 amRNSExtension of the Standstill Agreement
1st Aug 20177:00 amRNSExtension of the Standstill Agreement
30th Jun 20173:34 pmRNSReport on Payment to Governments for 2016
30th Jun 20173:25 pmRNSResults of Annual General Meeting
12th Jun 20177:01 amRNS2016 Full Year Results
6th Jun 20174:51 pmRNSAnnual Report and Notice of AGM
31st May 20177:00 amRNSStandstill agreement agreed with Inata's creditors
22nd May 20177:00 amRNSFirst closing of the Tri-K project completed
10th May 20177:00 amRNSTri-K Presidential Decree received & Inata Update
2nd May 20177:00 amRNSUpdate on share suspension, Inata and Tri-K
12th Apr 20175:00 pmRNSChange to announcement date

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.