Blencowe Resources: Aspiring to become one of the largest graphite producers in the world. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAvesoro Resources Regulatory News (ASO)

  • There is currently no data for ASO

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Appointment of DRA Mineral Projects (Pty) Ltd

6 Jun 2011 07:00

RNS Number : 8986H
Aureus Mining Inc.
06 June 2011
 



 

For Immediate Release June 6, 2011

 

Aureus Mining Inc.

 

TSX : AUE

 

AIM : AUE

 

 

NEWS RELEASE

 

Appointment of DRA Mineral Projects (Pty) Ltd

 

·; DRA Mineral Projects (Pty) Ltd ("DRA") appointed as plant design engineers for the New Liberty Gold Project's definitive feasibility study

 

·; DRA to undertake detailed metallurgical test work and process design studies - 500 kg of core shipped to South Africa to complete floatation, recovery and grind size optimization

 

·; Golders Associates Ghana Ltd ("Golders") and Australian Mining Consultants ("AMC") appointed as other key consultants for feasibility technical team

 

·; Infill Drilling programme continues at New Liberty - two rigs on site now and a further two will arrive by the end of June. To date 29 holes completed for 6139 metres

 

·; Geotechnical drilling - 15 holes from a 23 hole programme completed to date.

 

·; Definitive feasibility study on track to complete in Q4 2011

 

·; Environmental impact assessment also due to complete in Q4 2011 - various baseline studies already completed

 

 

 

Commenting on the appointment David Reading, Chief Executive Officer of Aureus said: "We are delighted that DRA are working with us on the engineering design of the New Liberty process plant as they bring a wealth of knowledge in the construction of gold processing plants in Africa. With the appointment of DRA, Golders and AMC our consultant team for the definitive feasibility study is now complete and we remain on track for completion by end of Q4 2011."

 

 

 

Aureus Mining Inc. ("Aureus" or the "Company") announces that it has appointed DRA Mineral Projects (Pty) Ltd of South Africa ("DRA") to undertake the metallurgical test work and process design studies as part of the New Liberty Gold Project definitive feasibility study. DRA will undertake detailed metallurgical test work to definitive feasibility level and then complete all design work and cost estimation studies for the operation of the process plant. This work has commenced with the shipment of over 500 kg of drill core to South Africa in order to undertake detailed test work on floatation, recovery and optimization of the grind size required in the milling process.

 

DRA will also be investigating the viability of incorporating a floatation recovery process within the process plant in their feasibility work. If successful, this would be a significant factor in the process design resulting in a smaller plant and a reduction in grinding requirements and a lowering of capital and operating costs. Results for this test work are expected to be available in Q3 2011.

 

The Company has retained the services of Golder Associates Ghana Ltd ("Golders") for the environmental and social impact assessment ("ESIA") and Australian Mining Consultants (UK) Ltd ("AMC") for the 43-101 resource classification and open pit and mining optimization studies.

 

The definitive feasibility study will be co-ordinated and compiled by the Company under the supervision of its Chief Operating Officer, Dr Martin White and is expected to be completed by the end of 2011.

 

The Company is continuing with the infill diamond drilling programme at the New Liberty deposit and to date 6,139 metres (26 holes) of a 20,000m (156 holes) programme have been completed. With an optimal hole spacing of between 30 and 40 metres the programme is designed to evaluate the total contained gold resources over a 1.75km strike length and down to a depth of 200 metres below surface. The Company is operating with two rigs however by the end of June the drilling contractor will have four rigs at New Liberty in order to complete this programme. Results from the first twenty holes are expected in June.

 

Geotechnical drilling is being undertaken by AMC in order to assess the slope stability within the open pit and to date 15 holes from a planned 23 hole programme have been completed.

 

Progress has been made on the ESIA and to date Golders have completed ecological, surface water, air quality and socio-economic base line studies within the area covering New Liberty proposed mining infrastructure. The ESIA study is on track for completion by Q3 2011.

 

The Company is also carrying out an investigation into alternative power supply options to the project in order to achieve the best project economics. The use of a bio-mass power generation system using wood chips supplied from rubber plantation regeneration projects within Liberia offers a potential alternative to diesel fuel power generation. Both options will be investigated as part of the definitive feasibility study.

 

About Aureus Mining Inc.

The Company's assets include the New Liberty gold deposit in Liberia (the "New Liberty Gold Project"), which has an estimated Indicated Mineral Resource of 751,000 ounces of gold grading 4.17 g/t (contained in 5,599,000 tonnes) and an estimated Inferred Mineral Resource of 762,000 ounces of gold grading 3.40 g/t (contained in 7,040,000 tonnes). A preliminary economic assessment ("PEA") of the New Liberty Gold Project filed in December 2010 outlined a robust open pit gold mine with a pre-tax NPV of US$234 million based on an $1100/oz. gold price and a 10% discount rate. The PEA outlined an 8.5 year mine life with approximate production of 100 000 ounces per year in the first five years. The New Liberty Gold Project is being advanced through to a definitive feasibility study.

 

The New Liberty Gold Project locates within the Bea Mountain mining license which covers 457 km2 and has a 25 year, renewable, mineral development agreement. The Bea Mountain mining license also hosts the proximal gold targets of Ndablama, Weaju, Silver Hills and Gondoja which are the focus of exploration programs during 2011.

The company also has gold assets within exploration properties in Sierra Leone and Cameroon.

 

Contact Information

Aureus Mining Inc.

David Reading, CEO

Tel: +44 (0) 20 7257 2930

 

Buchanan

Bobby Morse / Katharine Sutton

Tel: +44 (0) 20 7466 5000

Evolution Securities Limited

Jeremy Ellis / Neil Elliot

Tel: +44 (0) 20 7071 4300

 

RBC Capital Markets

Martin Eales

Tel: +44 (0) 20 7653 4000

 

Qualified Person

The Company's Qualified Person responsible for preparing this release is David Reading, who holds a MSc in Economic Geology from University of Waterloo, Canada and is a Fellow of the Institute of Materials, Minerals and Mining. David Reading is the President and CEO of Aureus Mining Inc. and consents to the inclusion in the announcement of the matters based on their information in the form and context in which it appears and confirms that this information is accurate and not false or misleading.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCSSLSIMFFSEDM
Date   Source Headline
6th Jan 20207:00 amRNSAcquisition by Avesoro Jersey of Remaining Shares
19th Dec 20199:50 amRNSConfirmation of Cancellation date
12th Dec 20197:00 amRNSLoan Agreement
4th Dec 20195:30 pmRNSAvesoro Resources
4th Dec 201910:30 amRNSExpiry of Extension Period, Compulsory Acquisition
25th Nov 20197:00 amRNSExtension of Offer to Acquire
14th Nov 20197:00 amRNSThird Quarter Results 2019
21st Oct 20197:00 amRNSDirectors' Circular in Response to Take-over Bid
21st Oct 20197:00 amRNSLoan Agreement
17th Oct 20193:00 pmRNSInsider Bid and Abridgement of Deposit Period
10th Oct 20197:00 amRNSQ3 2019 Production Update
3rd Oct 20197:00 amRNSPit Wall Failure at New Liberty
1st Oct 201911:30 amRNSBLOCK LISTING SIX MONTHLY RETURN
2nd Sep 20197:00 amRNSLoan Agreement and Update on Acquisition Proposal
20th Aug 20197:00 amRNSAcquisition Proposal & Operational Update
9th Aug 20191:52 pmRNSUpdate on the Security Breach at Youga
8th Aug 20194:40 pmRNSSecurity Breach at Youga
8th Aug 20197:00 amRNSFINANCIAL RESULTS AND OPERATIONAL UPDATE
1st Aug 20192:05 pmRNSSecond Price Monitoring Extn
1st Aug 20192:00 pmRNSPrice Monitoring Extension
15th Jul 20197:00 amRNSFUNDING POSITION UPDATE & SIGNING OF CONTRACT
10th Jul 20197:00 amRNSQ2 2019 PRODUCTION UPDATE
21st Jun 20197:00 amRNSFILING OF NI43-101 TECHNICAL REPORT FOR YOUGA MINE
17th Jun 20197:00 amRNSMining and Processing Operations Restart at Youga
14th Jun 20192:00 pmRNSPrice Monitoring Extension
12th Jun 20197:00 amRNSOperational Update
10th Jun 20197:00 amRNSOPERATIONAL AND GUIDANCE UPDATE
15th May 20197:00 amRNSFINANCIAL RESULTS FOR THE QUARTER ENDED MARCH 2019
8th May 20197:00 amRNSAVESORO REPORTS 23% INCREASE IN MINERAL RESERVES
11th Apr 20197:00 amRNSQ1 2019 Production Update
2nd Apr 20197:00 amRNSFILING OF TECHNICAL REPORT FOR NEW LIBERTY MINE
1st Apr 20193:52 pmRNSBLOCK LISTING SIX MONTHLY RETURN
27th Mar 20192:00 pmRNSNOTICE OF ANNUAL GENERAL MEETING
14th Mar 20197:00 amRNSFINANCIAL RESULTS FOR YEAR ENDED 31 DECEMBER 2018
6th Mar 20197:00 amRNSPRE-FEASIBILITY STUDY AND 2019 PRODUCTION GUIDANCE
17th Jan 20197:00 amRNSQ4 2018 PRODUCTION RESULTS
19th Dec 20185:00 pmRNSGrant of Stock Options
13th Nov 20187:23 amRNSQ3 Results
9th Nov 20187:00 amRNSDisclosure of Related Party Transactions
31st Oct 20185:15 pmRNSTR-1: Notification of major holdings
10th Oct 20187:00 amRNSYOUGA-OUARÉ DRILLING RESULTS & EXPLORATION UPDATE
9th Oct 20187:00 amRNSQ3 2018 PRODUCTION UPDATE
1st Oct 20183:42 pmRNSBlock listing Interim Review
24th Sep 20183:17 pmRNSHolding(s) in Company
19th Sep 20187:00 amRNSAvesoro Upgrades New Liberty Mineral Resources
17th Aug 20186:15 pmRNSAmended and Restated Financial Statements
13th Aug 20187:00 amRNSFINANCIAL HIGHLIGHTS FOR 3&6 MONTHS ENDED JUNE 30
2nd Aug 20187:00 amRNSFILING OF NI43-101 TECHNICAL REPORT FOR YOUGA MINE
12th Jul 20187:00 amRNSNDABLAMA DRILLING COMPLETE AND EXPLORATION UPDATE
9th Jul 20187:00 amRNSQ2 2018 PRODUCTION UPDATE

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.