Reserves & Resources Update

4 Apr 2018 07:00

RNS Number : 7154J
Amerisur Resources PLC
04 April 2018
 

4 April 2018

Amerisur Resources Plc ("Amerisur" or the "Company")

Reserves & Resources Update

Amerisur Resources Plc ("Amerisur" or the "Company"), the oil and gas producer and explorer focused on South America (LSE: AMER), provides an update on the certified reserves and resources for its production assets in Colombia. 

Following receipt of an independent reserves report for the Platanillo field as at 31 December 2017 undertaken by Petrotech Engineering Ltd, using the standards set by the Oil and Gas Reserves Committee of the Society of Petroleum Engineers, certified 1P (Proven) gross field reserves were 12.84 million barrels of oil ("MMBO") (2016: 15.11 MMBO) after production of 1.76 MMBO during the period and 2P (Proven and Probable) gross field reserves were 18.95 MMBO (2016: 24.47 MMBO). Cumulative total production from the Platanillo field at 31 December 2017 was 9.26 MMBO.

After production, current 1P reserves represent a decrease of approximately 0.5 MMBO from year end 2016. This technical decrease of the Expected Ultimate Recovery ("EUR") (a forward-looking model which assumes a decline factor and projects the volume of oil which will ultimately be recovered from each well) takes account of the wells drilled during the year, including the relatively poor reservoir quality and initial flow rates from wells Platanillo 25 and Platanillo 27. This results in a small decrease in expected EUR. The reduction in 2P reserves is also due to that effect, together with a refined mapping of the field after the reprocessing of the 3D seismic data by Signature Ltd of Calgary, part of our regional reprocessing project which covers our entire Putumayo portfolio.

Since the Mariposa-1 well is currently under Long Term Test, it has not entered the exploitation phase and hence the Operator is not required to report such reserves to the Agencia Nacional de Hidrocarburos (ANH). However, for guidance, the Company also commissioned an evaluation of reserves at the Mariposa discovery in block CPO-5 from Petrotech Engineering Ltd. 1P reserves were certified at 0.79 MMBO and 2P reserves at 1.30 MMBO to Amerisur on a working interest basis (30%).

 

The Company also commissioned an evaluation of reserves at the Mecaya block related to the well Mecaya-1 from Petrotech Engineering Ltd. 1P reserves were certified at 0.31 MMBO and 2P reserves at 0.45 MMBO to Amerisur on a working interest basis of 58%.

 

Hence total Amerisur 1P reserves at 31.12.17 are 13.94 MMBO and 2P reserves are 20.70 MMBO.

Reserves

 

Reserves Oil & Liquids Amerisur Net Working Interest

 (MMBO)

BLOCKS (Amerisur working interest)

Proved

(1P)

Proved & Probable

(2P)

Proved, Probable & Possible (3P)

Platanillo (100%)

12.84

18.95

22.45

CPO-5 (30%)

0.79

1.3

-

Mecaya (58%)

0.31

0.45

-

 

Total

 

13.94

20.70

22.45

Source: Petrotech Engineering LTD., Reserves Audit at 31 Dec 2017

 

 

Resources

Unrisked Contingent Resources Amerisur Net Working Interest

BLOCKS

Gross

MMbbl

Low Estimate

Mid Estimate

High Estimate

Coatí (100%)

14.99

34.72

67.88

CPO-5 (30%)

0.44

0.77

2.19

Total

15.43

35.49

70.07

Certified by Petrotech at 31 Dec 2017

 

Unrisked Prospective Resources Amerisur Net Working Interest

BLOCKS (Amerisur working interest)

Gross

MMbbl

Low Estimate

Mid Estimate

High Estimate

Platanillo (100%) (Structural and N Sand anomalies prospects)

13.66

37.70

92.79

CPO-5 (30%)

11.27

40.58

136.15

Coati (100%**)

6.68

26.72

75.58

PUT 8 (50%)

2.79

16.27

68.30

Andaquíes (100%)

3.23

38.02

195.95

Mecaya (58%)

0.54

2.26

6.68

PUT 9 (100%)

18.64

64.43

150.93

PUT 12 (60%)

79.50

224.71

430.50

PUT 30* (100%)

54.29

337.66

1,800.63

Terecay (100%)

39.83

223.74

664.19

Tacacho (100%)

63.84

363.93

1,150.08

 

 

 

 

Total

294.272

1,376.026

4,771.763

Certified by Petrotech at 31 Dec 2017

* Internal Management Estimates

John Wardle, CEO of Amerisur Resources said:

"The reduction in reserves at Platanillo over and above production through the year was a result of various factors, including the relatively poor performance of two wells drilled during the period and the latest mapping of the Platanillo structure, part of our wider effort to maximise our understanding of the opportunities within our portfolio. The Board is confident of future reserves growth at Platanillo and that improved mapping will undoubtedly be an advantage as we begin to explore our wider opportunity base in the Putumayo. This reduction was more than compensated for on a 1P basis by new reserves certified at our Mariposa discovery and the recently acquired Mecaya discovery. Amerisur has an extensive growth portfolio with unrisked prospective resources of 1,376MMbl in the mid case scenario. Our fully funded 2018 work programme will see increased drilling across our blocks, including the drilling of up to three N Sand anomaly wells further north on the Platanillo block, three new wells in CPO-5 and a further well in Put-8, all of which have the potential to substantially grow the company's reserves and resources base." 

 

These assessments are made in accordance with the standard defined in the SPE/WPC Petroleum Resources Management System (2007).

Competent person: Technical information in this announcement has been reviewed by John Wardle Ph.D., the Company's Chief Executive. John Wardle has 32 years' experience in the industry, having worked for BP, Britoil, Emerald Energy and Pebercan, and is a trained drilling engineer. 

The information contained within this announcement is considered to be inside information prior to its release, as defined in Article 7 of the Market Abuse Regulation No. 596/2014, and is disclosed in accordance with the Company's obligations under Article 17 of those Regulations.

Ends

 

Enquiries:

 

 

Nick Harrison, CFO

Amerisur Resources

 

Tel: +44 (0)330 333 8246

Billy Clegg/Georgia Edmonds

Tel: +44 (0)203 757 4980

Camarco

 

 

Callum Stewart/Nicholas Rhodes/Ashton Clanfield

Stifel Nicolaus Europe Limited

Tel: +44 (0)20 7710 7600

 

 

Chris Sim/George Price

Tel: +44 (0)207 597 4000

Investec

 

 

 

Darrell Uden/Marcus Jackson

RBC Capital Markets

 

Tel: +44 (0)207 653 4000

 

 

About Petrotech Engineering Ltd

Petrotech Engineering Ltd. is an independent oil and gas reserve evaluation firm located in Burnaby, British Columbia, Canada. John Yu is a professional Petroleum Engineer with over 40 years of experience in Domestic and International Oil and Gas. He attended the University of Alberta and graduated with a Bachelor of Science in Metallurgical Engineering in 1974. He is a registered Professional Engineer in the Province of British Columbia. Since May of 1981 he has been a Petroleum Engineering Consultant and President of Petrotech Engineering Ltd. of Burnaby, B. C.

 

Glossary

"EUR"

those quantities of petroleum which are estimated, on a given date, to be potentially recoverable from an accumulation, plus those quantities already produced therefrom.

 

"MMbl"

 

Million barrels

"MMBO"

million barrels of oil

 

"MMBOE"

million barrels of oil equivalent

 

"MMscf"

million standard cubic feet

 

"Proven Reserves" or "1P"

those quantities of petroleum, which, by analysis of geoscience and engineering data, can be estimated with reasonable certainty to be commercially recoverable, from a given date forward, from known reservoirs and under defined economic conditions, operating methods, and government regulations. If deterministic methods are used, the term reasonable certainty is intended to express a high degree of confidence that the quantities will be recovered. If probabilistic methods are used, there should be at least a 90% probability that the quantities actually recovered will equal or exceed the estimate.

 

"Proven + Probable Reserves" or "2P"

those additional Reserves which analysis of geoscience and engineering data indicate are less likely to be recovered than Proved Reserves but more certain to be recovered than Possible Reserves. It is equally likely that actual remaining quantities recovered will be greater than or less than the sum of the estimated Proved plus Probable Reserves (2P). In this context, when probabilistic methods are used, there should be at least a 50% probability that the actual quantities recovered will equal or exceed the 2P estimate.

 

"Proven + Probable + Possible Reserves" or "3P"

those additional Reserves which analysis of geoscience and engineering data indicate are less likely to be recovered than Probable Reserves. In this context, when probabilistic methods are used, there should be at least a 10% probability that the quantities actually recovered will equal or exceed the sum of estimated proved plus probable plus possible reserves.

 

"Contingent Resources"

those quantities of petroleum estimated, as of a given date, to be potentially recoverable from known accumulations by application of development projects, but which are not currently considered to be commercially recoverable due to one or more contingencies.

 

"Low Estimate Contingent Resources" or "1C"

 

the estimate of Contingent Resources, with a 90% probability that the estimated potentially recoverable quantity will equal or exceed the estimated quantity

 

"Mid Estimate Contingent Resources" or "2C"

 

the estimate of Contingent Resources, with a 50% probability that the estimated potentially recoverable quantity will equal or exceed the estimated quantity

 

"High Estimate Contingent Resources" or "3C"

 

the estimate of Contingent Resources, with a 10% probability that the estimated potentially recoverable quantity will equal or exceed the estimated quantity

 

"Prospective Resources"

estimated volumes associated with undiscovered accumulations. These represent quantities of petroleum which are estimated, as of a given date, to be potentially recoverable from oil and gas deposits identified on the basis of indirect evidence but which have not yet been drilled. The range of estimates, "Low, Mid, High" are defined by the same parameters as in "Contingent Resources" above.

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLBXLLBVZFZBBB
Date   Source Headline
2nd Jun 20147:00 amRNSBlocklisting Interim Review
7th May 20142:25 pmRNSResult of AGM
7th May 20149:45 amRNSContract Update
25th Apr 20147:00 amRNSPlatanillo-15 Update
22nd Apr 20147:01 amRNSFull Year Results
2nd Apr 20148:17 amRNSReserves and Resources Update - Correction
31st Mar 20147:00 amRNSReserves and Resources Update
24th Mar 20147:00 amRNSPlatanillo-17 Update
18th Feb 20141:55 pmRNSGrant of Share Options
18th Feb 20141:55 pmRNSStatement re Directors' Dealings
13th Feb 20147:00 amRNSOperations Update
3rd Feb 20147:00 amRNSAve-1 Update
30th Jan 20142:30 pmRNSParaguay Update
24th Jan 20147:00 amRNSHolding(s) in Company
31st Dec 20137:00 amRNSAve-1 Update
30th Dec 20137:00 amRNSPlatanillo-7 Update
3rd Dec 20137:00 amRNSDirector Dealings
29th Oct 20137:00 amRNSPlatanillo-14 Update
29th Oct 20137:00 amRNSColombia Update
22nd Oct 201312:50 pmRNSInterim Accounts - Correction
26th Sep 20137:00 amRNSInterim Results
26th Sep 20137:00 amRNSPlatanillo Update
23rd Sep 20138:27 amRNSPlatanillo Update
30th Aug 20137:00 amRNSOperations Update
16th Jul 20137:00 amRNSPlatanillo Update
7th Jun 20139:27 amRNSDirectors' Dealings
6th Jun 20137:00 amRNSOperational Update
3rd Jun 201312:36 pmRNSBlock Listing Six Monthly Return
14th May 20131:04 pmRNSResult of AGM
14th May 20137:00 amRNSAppointment of Non-Executive Director
14th May 20137:00 amRNSOperational Update
18th Apr 20137:00 amRNSPlatanillo Update
17th Apr 20137:00 amRNSPreliminary Results
10th Apr 201310:02 amRNSHolding(s) in Company
8th Apr 20139:00 amRNSNotice of Results
18th Mar 20137:00 amRNSPlatanillo Update
18th Mar 20137:00 amRNSReserves update
7th Feb 20137:00 amRNSGrant of Share Options
6th Feb 20137:00 amRNSPresentation at RBC International E&P Conference
24th Jan 20137:47 amRNSColombia Update
14th Dec 20127:00 amRNSAppointment of Investec as Joint Broker
11th Dec 20127:00 amRNSColombia Update
5th Dec 20127:00 amRNSHolding(s) in Company
3rd Dec 20127:00 amRNSBlock admission and Block Listing 6 Monthly Return
30th Nov 20127:00 amRNSFenix Block Update
28th Nov 20127:00 amRNSPlatanillo-9 Update
31st Oct 20124:18 pmRNSPlatanillo-9 Update - Replacement
31st Oct 20127:00 amRNSPlatanillo-9 Update
25th Oct 20125:28 pmRNSExercise of Options and Directors' Dealings
22nd Oct 201210:55 amRNSCapital Group Companies - Holding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.