If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAMC.L Regulatory News (AMC)

  • There is currently no data for AMC

Open Pit Potential Confirmed

30 Oct 2006 07:01

Amur Minerals Corporation30 October 2006 October 30, 2006 Amur Minerals Corporation (AIM: AMC) Maly Krumkon Open Pit Potential Confirmed By SRK Consulting In October 2006, SRK Consulting completed a conceptual design assessment of theopen pit potential on Amur Minerals Corporation's ("Amur" or "the Company") MalyKrumkon nickel-copper deposit. The deposit is one of three contained within theCompany's Kun-Manie nickel copper licence for which this has been undertaken.Amur is an AIM-listed resource exploration and development company with assetsin far eastern Russia. Results from SRK's evaluation confirm the following: • The Maly Krumkon structure, mineralisation and orientation can potentially be recovered by conventional open pit mining methods. • In-fill drilling to confirm the continuity of the mineralisation is required to verify the conceptual open pit results. • Additional potential remains along strike where reconnaissance work confirms the zone's presence and which has not been included in the conceptual open pit analysis. Amur discovered the Maly Krumkon deposit in June 2006 during its wildcatdrilling phase which it conducts at the beginning of each year. The mineralisedzone has a geologically mapped length of approximately three kilometres whichcan be traced for approximately one kilometre with four diamond core drill holesand four trenches. Subsequent resource estimation work on Maly Krumkoncompleted by SRK Consulting identified the presence of an inferred in situgeological resource totalling 11.0 million tonnes at a mean grade of 0.45%nickel and 0.14% copper containing 50,000 tonnes of nickel and 15,200 tonnes ofcopper. This additional resource increases the Company's total inferred andindicated resources to 259,000 tonnes of nickel and 73,700 tonnes of copperwithin 57.1 million tonnes. A detailed categorisation of the resource inventoryis presented at the end of this announcement. To assist in exploration planning for the 2007 calendar year, Amur requested SRKConsulting to compile a second resource model wherein the preliminarily exploredarea of the zone was extended down dip and between exploration drill holes andtrenches. This non-compliant JORC model was then used to assess the open pitpotential of the deposit. Using the Lerchs Grossman algorithm, a significantportion of the non-compliant model "mines" within an open pit outline,indicating that exploration within the area is warranted and should becontinued. Should exploration in-fill work be successful, the Directors believethat the resource tonnage could be significantly increased from that containedwithin the JORC compliant resource estimate. Commenting on the results, CEO Robin Young stated, "We have again advanced thisproject another hurdle closer to production. This highly positive result buildson our already substantial base and should improve the results of the on goingpre-feasibility study to be released within the next six months." (The information contained in this announcement has been reviewed and approvedon behalf of SRK Consulting (UK) Limited by Dr Mike Armitage. Dr Armitage is aQualified Professional Geologist.) SRK Consulting Independently Estimated In Situ Geological Resource - October 30, 2006 JORC Compliant Deposit Tonnage Ni Ni Cu Cu (Mt) (t) (%) (t) (%) Indicated Resource Maly Krumkon - - - - - Vodorazdelny 7.1 42,900 0.60 12,000 0.17 Ikenskoe 21.3 89,500 0.42 25,800 0.12 Total Resource =SUM(ABOVE) 28.4 =SUM(ABOVE) 132,400 0.47 =SUM(ABOVE) 37,800 0.13 Inferred Resource Maly Krumkon 11.0 50,000 0.45 15,200 0.14 Vodorazdelny 3.6 22,500 0.62 6,700 0.19 Ikenskoe 14.1 54,200 0.39 14,000 0.10 Total Resource =SUM(ABOVE) 28.7 =SUM(ABOVE) 126,700 0.44 =SUM(ABOVE) 35,900 0.13 Total Indicated + Inferred Resource Maly Krumkon 11.0 50,000 0.45 15,200 0.14 Vodorazdelny 10.7 65,400 0.61 18,700 0.17 Ikenskoe 35.4 143,600 0.41 39,800 0.11 Total Resource =SUM(ABOVE) 57.1 =SUM(ABOVE) 259,000 0.45 =SUM(ABOVE) 73,700 0.13 Ends Enquiries: Amur Minerals Corp. Nabarro Wells & Co. Limited Parkgreen CommunicationsRobin Young John Wilkes Victoria ThomasCEO Director+44 (0) 7981 126 818 +44 (0) 20 7710 7400 +44 (0) 20 7493 3713 Notes to Editors The Amur Group's principal asset is the 100% owned Kun-Manie explorationlicence, a nickel-copper deposit located in the Amur Province in the far east ofthe Russian Federation. The Kun-Manie licence area is approximately 950 km(2)and is located 700 km northeast of the capital city of Blagoveshchensk and is750km north of the Chinese border. In April 2004 ZAO Kun-Manie, a wholly ownedsubsidiary of Amur, was granted a licence to explore for nickel and relatedmetals, including copper and platinum, in respect of the Kun-Manie licence. Work carried out to date on the Kun-Manie licence including diamond coredrilling, trenching and geological mapping has identified four mineralisedtargets, the Vodorazdelny, Ikenskoe, Maly Krumkon and Falcon zones each of whichwarrant further exploration. The four zones are located within a 15 kilometerlong segment of the 40 kilometre long Krumkon Trend. This trend is the primaryexploration target within the licence area. An additional two targetsidentified as Chornie Ispelene and Kubuk have been identified within the trendand require additional geological investigation and drilling. In combination,the six zones are located along approximately 50% of the length of the KrumkonTrend. The remainder of the trend also contains additional potential based ongeochemical sampling and geological mapping which has identified anomalouslymineralized host structures needing additional reconnaissance and detailedexploration work. To date, detailed exploration and an independently calculated resource estimatecompiled by SRK Consulting indicates the presence of Indicated and Inferredresources. These are contained within the three deposits, the Vodorazdelny,Ikenskoe and Maly Krumkon zones. An update to the Competent Person's Reportwithin the Amur Admission Document dated 10th March 2006 now indicates thesethree zones contain a total of 57.1Mt at a mean grade of 0.45% nickel, yielding259,000 tonnes of contained nickel; 0.13% copper, containing 73,700 tonnes ofcontained copper. Amur also owns the Anadjakan gold-copper exploration licence in Kharaborvsk Krainear the well infrastructured city of Elban. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
12th Jul 20127:00 amRNSDrilling Underway on Maly Kurumkon Extension
27th Jun 20124:40 pmRNSSecond Price Monitoring Extn
27th Jun 20124:35 pmRNSPrice Monitoring Extension
25th Jun 20123:43 pmRNSFinal Results
18th May 20127:00 amRNSFurther Metallurgical Test Work Results
17th May 20124:40 pmRNSSecond Price Monitoring Extn
17th May 20124:35 pmRNSPrice Monitoring Extension
10th May 20127:07 amRNSSGS Mineral Services Metallurgical Test Results
17th Apr 20124:35 pmRNSPrice Monitoring Extension
30th Mar 20124:35 pmRNSPrice Monitoring Extension
26th Mar 20124:40 pmRNSSecond Price Monitoring Extn
26th Mar 20124:35 pmRNSPrice Monitoring Extension
14th Mar 20127:00 amRNSChorney Ispelene Exploration Results
7th Mar 20124:35 pmRNSPrice Monitoring Extension
7th Mar 20129:00 amRNSNewly Acquired Core Drill Rig for Kun-Manie
20th Feb 20128:20 amRNSHolding(s) in Company
10th Feb 20124:35 pmRNSPrice Monitoring Extension
7th Feb 20127:00 amRNSSubscription and Update
23rd Jan 20127:01 amRNSBroker Appointment
11th Jan 20124:35 pmRNSPrice Monitoring Extension
16th Dec 201110:30 amRNSNon-Executive Directors' Dealings
21st Nov 20117:00 amRNSPhase I Exploration Results
31st Oct 20117:00 amRNSReport Completed on Kun-Manie Project
28th Oct 20114:40 pmRNSSecond Price Monitoring Extn
28th Oct 20114:35 pmRNSPrice Monitoring Extension
28th Sep 20112:00 pmRNSInterim Results
23rd Sep 20114:40 pmRNSSecond Price Monitoring Extn
23rd Sep 20114:35 pmRNSPrice Monitoring Extension
22nd Sep 20114:40 pmRNSSecond Price Monitoring Extn
22nd Sep 20114:35 pmRNSPrice Monitoring Extension
21st Sep 20119:00 amRNSChange of NOMAD Registered Name
15th Aug 20114:40 pmRNSResult of AGM
8th Aug 20114:35 pmRNSPrice Monitoring Extension
27th Jul 20114:26 pmRNSNotice of Annual General Meeting
29th Jun 20117:00 amRNSFinal Results
13th Jun 20119:30 amRNS2011 Field Work Underway At Kun-Manie
25th May 20117:00 amRNS2.07 million GBP Financing Complete
23rd May 20114:41 pmRNSSecond Price Monitoring Extn
23rd May 20114:35 pmRNSPrice Monitoring Extension
18th Apr 20119:15 amRNSGrant of Options
11th Apr 20117:00 amRNSKun-Manie Project Update
22nd Mar 201110:41 amRNS£2.5m Placing - replacement due to date error
22nd Mar 20117:00 amRNS£2.5m Placing
3rd Feb 20117:00 amRNSFinal 2010 Exploration Results
13th Dec 20107:00 amRNSUpdate on Licence Application
20th Oct 20102:40 pmRNS?2m Placing & Exploration Update
20th Oct 20102:40 pmRNS£2m Placing & Exploration Update
30th Sep 20107:00 amRNSInterim Results
29th Sep 20105:12 pmRNSResult of AGM
7th Sep 20103:45 pmRNSNotice of AGM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.