Chris Heminway, Exec-Chair at Time To ACT, explains why now is the right time for the Group to IPO. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAFC Energy Regulatory News (AFC)

Share Price Information for AFC Energy (AFC)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 19.60
Bid: 19.32
Ask: 19.60
Change: 1.16 (6.29%)
Spread: 0.28 (1.449%)
Open: 19.50
High: 19.60
Low: 18.46
Prev. Close: 18.44
AFC Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

FEED Study at Dunsfold Park

24 Jul 2017 07:00

RNS Number : 8228L
AFC Energy Plc
24 July 2017
 

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014. Upon the publication of this announcement via a Regulatory Information Service ("RIS"), this inside information is now considered to be in the public domain.

 

 

24 July 2017

 

AFC Energy PLC

 

("AFC Energy" or the "Company")

 

 

AFC Energy Commences FEED on Landmark Hydrogen Fuel Cell Micro-Grid in Surrey at Dunsfold Park

 

AFC Energy (AIM: AFC), the industrial fuel cell power company, is pleased to announce it has executed a term sheet with Dunsfold Park Ltd. ("Dunsfold Park") to commence Front End Engineering and Design ("FEED") work on a landmark hydrogen micro-grid at the Dunsfold Park site in Surrey, UK.

The FEED will commence immediately.

Highlights

· AFC Energy to commence FEED study for an initial 1 - 1.5 MW hydrogen fuel cell micro grid, sufficient to power up to 2,500 homes, as part of the Dunsfold Estate Masterplan residential and industrial redevelopment

 

· FEED study to deliver a fully engineered project and cost estimate of +/-10%

 

· The hydrogen micro-grid is the first known initiative of its kind in the world

 

· The micro-grid as envisaged will install at varying stages:

 

o 1 - 1.5 MW of AFC Energy hydrogen fuel cell generation capacity

o AFC Energy integrated hydrogen battery

o hydrogen vehicle refuelling station

o electric car recharging points (sourced from hydrogen fuel cell generation)

o low grade heat integration from the AFC Energy fuel cell

 

· The scheme will be supplied with "green" hydrogen sourced locally via bio-methane

 

· Plans to deliver the micro-grid across multiple phases commencing second half of 2018 in line with demand from the Dunsfold Park site

Dunsfold Park is home to AFC Energy's head office, and under its site redevelopment Masterplan, is scheduling the development of an initial 1,800 new homes and green space, co-existing with light industry, to create one the UK's largest residential and industrial brownfield redevelopment projects.

AFC Energy and Dunsfold Park have executed a Term Sheet which seeks to deploy up to 1 - 1.5 MW of the Company's fuel cell systems on site as part of a residential and industrial energy micro grid to meet the growing needs of the redeveloped site.

 

The scheme expects to be supplied with "green hydrogen" sourced locally from bio-methane (anaerobic digestion facility) making the proposition an entirely renewable and clean micro-grid which could have application not only across the UK, but could also be replicated internationally across all brown and green field residential, commercial and industrial developments.

The clean micro-grid is entirely consistent with the Dunsfold Park renewable energy strategy and that of the UK Government's industrial policy and policy of building more stability, flexibility and resilience into local power grids through the decarbonisation of the national power grid.

AFC Energy will commence work on the FEED in August 2017 to fully engineer and cost up the project to +/-10% cost accuracy before sanction is given by both AFC Energy and Dunsfold Park. The commercial terms of project ownership, power pricing and revenue sharing (expected to be in excess of £25m over the 20-year life of the project) will be developed in parallel. Furthermore, both parties are interested in considering different delivery and ownership models including a joint venture.

Power generation from the fuel cell facility in conjunction with the existing solar farm on site, will make Dunsfold Park the only Business Park in the UK with a micro grid supplied entirely by a combination of hydrogen / renewable derived energy, highlighting the importance and prominence of this project in the context of the UK energy market.

The timing for delivery of the project will be divided into multiple phases in recognition of the growth trajectory for new energy demand in conjunction with the site's redevelopment initiatives. Indicatively, the parties hope to deliver the first 0.5 - 1 MW of installed generation capacity in Q4 2018 and the second tranche of installed power capacity by the end of Q3 2019.

Jim McAllister, Chief Executive of Dunsfold Park Ltd, said: "We are delighted to be collaborating with AFC Energy, a long-time tenant of Dunsfold Park on this nationally significant hydrogen fuel cell project. We look forward to seeing the results of the FEED study and endorse the initiative's full alignment with Dunsfold Park's clean energy strategy which has permeated all of our redevelopment activities over the past few years. Initiatives such as this collaboration with AFC Energy further highlight Dunsfold, the Borough of Waverley and the County of Surrey's prominence at the forefront of renewable energy technologies."

Adam Bond, AFC Energy's Chief Executive Officer, said: "As long-term tenants of Dunsfold Park, we are delighted to now be collaborating in the commercial deployment of AFC Energy's fuel cell technology. The introduction of hydrogen derived from renewable sources is a particular highlight of the proposed scheme and re-emphases the potential innovation in sourcing long term, sustainable hydrogen for our fuel cell projects. This scheme offers the potential for national and international replicability and could become a benchmark in localised hydrogen micro-grids. We look forward to working closely with Dunsfold Park in delivering this important clean energy initiative for the region."

For further information, please contact:

AFC Energy plc

Adam Bond (Chief Executive Officer)

 

 

+44 (0) 20 3697 1209

Cantor Fitzgerald Europe Nominated Adviser and Joint Broker

Andrew Craig

Richard Salmond 

 

+44 (0) 20 7894 7000

M C Peat & Co LLP Joint Broker

Charlie Peat

 

+44 (0) 20 7104 2334

Lionsgate Communications Public Relations

Jonathan Charles

 

+44 (0) 20 3697 1209

 About AFC Energy

 

AFC Energy plc has developed and successfully demonstrated an alkaline fuel cell system, which converts hydrogen into "clean" electricity. AFC Energy's key project POWER-UP demonstrated the world's largest operational alkaline fuel cell system at Air Products' industrial gas plant in Stade, Germany. The Company is now looking to build upon an already established pipeline of commercial opportunities and drive the findings from the development phase of the technology into a technically optimised and commercially relevant fuel cell system. For further information, please visit our website: www.afcenergy.com

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCUOUARBBABUUR
Date   Source Headline
13th Feb 20137:00 amRNSFinal Results and Notice of AGM
12th Feb 20139:00 amRNSMPs learn about potential of fuel cells
12th Feb 20137:00 amRNSPresentation to Proactive Investors One2One Forum
30th Jan 20137:00 amRNSResearch relationship with Lancaster University
24th Jan 20137:00 amRNSAFC extends fuel cell electrode life beyond 6 mths
10th Jan 20137:00 amRNSDirectorate Change
17th Dec 20127:00 amRNSEU funding and acquisition
30th Nov 201211:36 amRNSTotal Voting Rights
8th Nov 20122:51 pmRNSIssue of Share Options and Warrants
7th Nov 20127:00 amRNSEU grant for UK fuel cell energy facility
31st Oct 201211:37 amRNSTotal Voting Rights
11th Oct 20127:00 amRNSEquity Investment of £8.7m by Strategic Investor
14th Sep 201211:54 amRNSAFC Energy Opens Pilot Production Plant
10th Sep 20127:00 amRNSLatest Independent Technology Review Highlights Pr
10th Aug 20123:04 pmRNSDirector Shareholding
31st Jul 20124:30 pmRNSTotal Voting Rights
27th Jul 20123:47 pmRNSExercise of Options
5th Jul 20127:00 amRNSInterim Results
25th Jun 20127:00 amRNSAFC & ICL to build UK's largest fuel cell facility
7th Jun 20127:00 amRNSAppointment of Broker
31st May 20127:00 amRNSDirectorate Change
23rd May 20127:00 amRNSAFC Energy appoints production facility manager
16th May 20127:00 amRNSAFC extends fuel cell electrode life beyond 3 mths
30th Apr 20124:30 pmRNSTotal Voting Rights
25th Apr 20123:41 pmRNSExercise of Options and Warrants
11th Apr 20124:10 pmRNSResult of AGM
11th Apr 20122:15 pmRNSCommercialisation agreement with Waste2Tricity
12th Mar 20125:30 pmRNSAFC Energy appoints Luther Pendragon
8th Mar 20126:03 pmRNSPosting of Annual Report and Accounts
8th Mar 20127:00 amRNSSir John Sunderland appointed to Board
7th Mar 20127:00 amRNSDirectorate Change
6th Mar 20127:00 amRNSAdditional Production Facility Investment Approved
5th Mar 20127:00 amRNSRepayment of Loan from Waste2Tricity
20th Feb 20127:00 amRNSPreliminary Results and Notice of AGM
13th Feb 20127:00 amRNSIndependent Technology Review
6th Feb 20127:00 amRNSNotice of Final Results
9th Jan 20127:00 amRNSGenerates First Industrial Power
1st Dec 20117:00 amRNSAward of Grant
7th Nov 20117:00 amRNSGrant of Options
21st Oct 20117:00 amRNSDirector Dealing
3rd Oct 20117:00 amRNSCommissioning of Beta Systems at AkzoNobel
22nd Sep 20117:00 amRNSAppointment of Non-Executive Director
11th Aug 20117:00 amRNSFirst commercial-scale system commissioned
8th Aug 20117:00 amRNSCompletion of HAZOP Study
29th Jul 20117:00 amRNSTotal Voting Rights
7th Jul 20117:00 amRNSInterim Results
4th Jul 20118:00 amRNSHolding(s) in Company
4th Jul 20117:00 amRNSReceipt of funds following placing
30th Jun 20117:00 amRNSBeta System Update & Notice of Results
27th May 20117:00 amRNSPlacing and Directorate Change

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.