The latest Investing Matters Podcast episode featuring financial educator and author Jared Dillian has been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAnglo Asian Regulatory News (AAZ)

Share Price Information for Anglo Asian (AAZ)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 69.00
Bid: 68.00
Ask: 70.00
Change: -1.00 (-1.43%)
Spread: 2.00 (2.941%)
Open: 69.50
High: 69.50
Low: 69.00
Prev. Close: 70.00
AAZ Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Final Micon environmental report

28 Sep 2023 07:00

RNS Number : 8973N
Anglo Asian Mining PLC
28 September 2023
 

 

28 September 2023

 

Anglo Asian Mining plc

Final Micon environmental report

 

Anglo Asian Mining plc ("Anglo Asian" or the "Company"), the AIM listed gold, copper and silver producer focused on Azerbaijan provides an update on the final Micon report (the "Report") which was delivered on 26 September 2023 to the Company and the Government of Azerbaijan (the "Government").

 

Background to the Report

Micon International Co Limited ("Micon") was commissioned on 21 July 2023 by the Company and the Government to undertake a Health, Safety and Environmental due diligence review of the tailings management at Gedabek gold mine (the "Review"). The Review also included soil and water sampling and the testing of air quality in the vicinity of Gedabek. The Review was commissioned following protests in July 2023 by local residents against the proposed construction of a second tailings dam close to the location of the Company's existing tailings dam.

 

Work undertaken at the Gedabek site pursuant to the Review

Three Micon employees visited Gedabek between 25 to 27 July 2023 where they undertook a detailed investigation of the processing facilities and visited environmental monitoring locations and the Company's existing tailings dam.

 

IQLIM Environment Analytical ("IQLIM"), an Azerbaijan environmental engineering company, also visited the Gedabek site between 25 July 2023 and 1 August 2023 on behalf of Micon. During this period, IQLIM carried out sampling of soils and surface and ground water. They also conducted air quality and noise monitoring. The environmental samples taken were analysed by the Caspian Environmental Laboratory in Azerbaijan, an accredited independent laboratory.

 

The Company engaged Mine Environmental Management ("MEM") to be present during the Micon and IQLIM site inspections to ensure they were conducted in accordance with industry standards. MEM was in attendance at Gedabek throughout both visits. The Company's tailings dam consulting engineers, Knight Piésold, were also present during the Micon site visit. Azecolab, an accredited laboratory, was also engaged by the Company to take duplicate environmental samples which were analysed at Azecolab's laboratory.

 

Environmental sampling carried out at the Gedabek site

Water sampling

17 surface water samples, plus one duplicate (18 in total) and 18 groundwater samples, plus two duplicates (20 in total) were taken by IQLIM.

 

Soil sampling

A total of 29 composite (bulk) soil samples (plus three duplicates) were taken by IQLM from locations in and around the Gedabek site, including background locations, the mine site itself, the area around the tailings dam and its pipeline corridor and local settlements.

 

Air quality, noise and radiation monitoring

Sampling was carried out on air quality using portable gas, dust, noise, vibration and radioactivity analysers.

 

Results of the Review and main conclusions in the Report

The main findings of the Report were as follows:

 

· Radiation levels at Gedabek are aligned with natural background conditions for the area. Noise levels were low and within acceptable limits. No issues of concern were identified with air quality

· No cyanide was found in any soil sample above the limits of analytical detection (

· Very low concentrations of cyanide (0.013 to 0.23 milligrams per litre) were found in four water samples (taken from three monitoring stations and one surface station) out of 35 samples taken, although all were well within the guidelines of the International Finance Corporation ("IFC") Environmental and Social Performance Standards Limits (IFC Environmental, Health, and Safety Guidelines for Mining).

· The Report concluded "Opposition to the proposed new tailings storage facility is the result of a lack of proactive communication between the site management team and the local community, longstanding issues regarding land allocation and mineral rights, and the failure to follow accepted international protocols for public consultation, rather than a fundamental technical problem with the current tailings storage facility or the proposed location for the new tailings storage facility."

· The management of the Gedabek site included various examples of good practice:

o Knowledgeable and experienced technical staff

o The existing tailings dam is in generally good working condition

o Good signage at the water bodies

o Topsoil is stockpiled for rehabilitation and closure

o The site appeared generally clean and tidy

· Various issues were highlighted for improvement:

o The emergency response capability at the Gedabek site for dealing with a cyanide incident was inadequate

o The Company's environmental monitoring and associated documentation should be strengthened so issues are identified at an earlier stage

o The Gedabek operation does not have a dedicated community relations department and is therefore limited to administrative work rather than proactive communication in the field

· Recommendations were also made to improve some operational, social and safety aspects of the Gedabek site

Next steps

The Board is carefully considering the findings of the Report and is in active dialogue with the Government and local communities at Gedabek with regard to implementing the recommendations in the Report. Further updates will be made in due course, including regarding the resumption of agitation leaching and flotation processing at Gedabek.

 

For further information please contact:

 

Anglo Asian Mining plc

Reza Vaziri, Chief Executive Officer

Tel: +994 12 596 3350

Bill Morgan, Chief Financial Officer

Tel: +994 502 910 400

Stephen Westhead, Vice President

Tel: +994 502 916 894

SP Angel Corporate Finance LLP (Nominated Adviser and Broker)

Ewan Leggat

Adam Cowl

Tel: +44 (0) 20 3470 0470

Hudson Sandler (Financial PR)

Charlie Jack

Harry Griffiths

 

Tel: +44 0) 20 7796 4133

 

Notes to editors

 

Anglo Asian Mining plc (AIM:AAZ) is a gold, copper and silver producer with a high-quality portfolio of production and exploration assets in Azerbaijan. The Company produced 57,618 gold equivalent ounces ("GEOs") for the year ended 31 December 2022. 

 

On 30 March 2023, the Company published its strategic plan for growth which shows a clearly defined path for the Company to transition to a multi-asset, mid-tier copper and gold producer by 2028. By 2028, copper will be the principal product of the Company, with forecast production of around 36,000 copper equivalent tonnes. It plans to achieve this growth by bringing into production four new mines during 2023 to 2028 at Zafar, Gilar, Xarxar and Garadag. 

 

The Company owns approximately 17.4 per cent. of Libero Copper & Gold Corporation ("Libero"). Libero is listed on the TSX Venture Exchange in Canada and owns, or has the option to acquire, several copper exploration properties in North and South America, including Mocoa in Colombia, one of the world's largest undeveloped copper-molybdenum resources. 

 

https://www.angloasianmining.com/

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCUBUNROKUKUAR
Date   Source Headline
2nd Jun 20179:30 amRNSPosting of Annual Report & Notice of AGM
25th May 20177:00 amRNSFull year results - 2016
9th May 201710:00 amRNSNew Corporate Presentation
8th May 20177:00 amRNSUgur Gold Deposit Development & Strategy Update
18th Apr 20177:00 amRNSStrategy Update and Q1 2017 Review
16th Feb 201712:32 pmRNSPartial transfer of loan from Amsterdam Trade Bank
17th Jan 20179:00 amRNSDirectors' Dealing
17th Jan 20177:00 amRNSQ4 & FY 2016 Operations and Production Update
22nd Dec 201610:00 amRNSUpdate re Director Loan
16th Dec 20167:00 amRNSSignificant Oxide Zone Drilled at Ugur Deposit
30th Nov 20167:00 amRNSGedabek Connected to Power Grid & Operation Update
14th Nov 201612:13 pmRNSGrant of Options
3rd Nov 20169:00 amRNSUpdated Presentation and AISC for Gedabek Mine
2nd Nov 20164:40 pmRNSSecond Price Monitoring Extn
2nd Nov 20164:35 pmRNSPrice Monitoring Extension
17th Oct 20167:00 amRNSNew Gold Discovery at its Gedabek Licence Area
13th Oct 20167:00 amRNSQ3 2016 Operations & Production Update
12th Sep 20167:00 amRNSInterim Results
14th Jul 20169:05 amRNSSecond Price Monitoring Extn
14th Jul 20169:00 amRNSPrice Monitoring Extension
14th Jul 20167:00 amRNSQ2 & H1 2016, Production Update, Operations Review
29th Jun 20167:30 amRNSHedging of gold sales for remainder of 2016
28th Jun 20167:00 amRNSResult of AGM
27th Jun 20167:00 amRNSAGM Statement
6th Jun 201610:00 amRNSPosting of Report & Accounts and Notice of AGM
25th May 20167:00 amRNSFinal Results
13th Apr 20167:00 amRNSQ1 2016 operations and production update, Gedabek
11th Feb 20164:41 pmRNSSecond Price Monitoring Extn
11th Feb 20164:35 pmRNSPrice Monitoring Extension
8th Feb 20164:41 pmRNSSecond Price Monitoring Extn
8th Feb 20164:35 pmRNSPrice Monitoring Extension
28th Jan 20167:00 amRNSNotification of Adoption of FRS 101
14th Jan 20167:00 amRNSQ4 2015/ FY 2015 Production Update Gedabek
11th Jan 20164:12 pmRNSDirector loan and Company net debt
21st Dec 20153:03 pmRNSFloating exchange rate regime
24th Nov 20157:00 amRNSCopper Concentrate Shipment from Floatation Plant
23rd Oct 20153:30 pmRNSDirector's Shareholding
14th Oct 20157:00 amRNSQ3 2015 Production Update
6th Oct 20159:53 amRNSHolding(s) in Company
22nd Sep 20157:00 amRNSInterim Results
31st Jul 20157:00 amRNSTotal Voting Rights
22nd Jul 20153:50 pmRNSIssue of Shares / Directors Dealing
13th Jul 20157:00 amRNSQ2 & H1 2015 operations update from Gedabek Mine
8th Jul 20154:40 pmRNSSecond Price Monitoring Extn
8th Jul 20154:35 pmRNSPrice Monitoring Extension
8th Jul 201512:42 pmRNSHolding(s) in Company
29th Jun 20153:00 pmRNSResult of AGM
29th Jun 201511:00 amRNSAGM Statement
5th Jun 201510:05 amRNSNotice of AGM and Posting R&A
28th May 20157:00 amRNSFinal Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.