RE: CPO5 and the LS3/128 Jun 2019 12:01
Also a North West (GUATIQUIA) to Sol (South) set of faults.
See page 29 - 31 of http://www.fronteraenergy.ca/content/uploads/2019/02/FEC-190205-2017-Full-Presentation.pdf
(it took an age to download for me, but worth looking at). They are planning 10 wells in the Coralillo field which has similar characteristics (LS1, LS3) and is adjacent to the top left of CPO-5 - see page 10 of Amer presentation http://www.amerisurresources.com/images/rns-pdfs/AGM-Presentation-14-05-19.pdf . If you zoom in, you can see the faults identified in both presentations and Mariposa is updip to the Coralillo field.
Coralillo-1:
"In February 2018, the Company began drilling the Coralillo-1 exploratory well on the Guatiquia block, which reached total depth of 13,240 feet (11,573 feet TVD) on March 27, 2018. The well encountered 13 feet of net pay in the Guadalupe formation, and 15 feet of net pay in the Lower Sand-1A formation. The well was completed in the Guadalupe and Lower Sand-1A formations with a selective completion and electrical submersible pump. The Lower Sand-1A formation has been flow tested for approximately 10 days at an average rate of 1,050 bbl/d of 15.3 degree API oil with an average water cut of 1% at stabilized bottomhole flowing pressure with a 60% drawdown. The well is currently shut-in for a pressure buildup test on the Lower Sand-1A formation. During the testing period, the well produced a total of 9,200 bbls of oil."