RE: New interview16 May 2024 22:48
It’s actually in the RNS. And it’s not 6.9. It’s an overall ave across the 67 holes, 14.7% higher rounded up to 15% by SB.
Excerpt
An analysis of the 67 RC drillholes completed to date over the Cosgrove and Thomas prospects (the areas referred to in Figures 3 and 4) shows elevated TiO2 grades are present within the top 40m in 86% of the drillholes. The average grade for the top 40m, representative of the near-surface zone of weathered sandstone, was 5.53% TiO2 metre across all 67 drillholes, compared to an average grade of 4.82% TiO2 metre for the >40m to end of hole intercept which represents an average 14.7% increase in grade within the uppermost 40m of weathered sandstone.