RE: Results17 Nov 2025 08:07
RNS released 0700 this morning
Highlights
Exceptional near surface copper intercepts including: 5.8m at 1.12% Cu / 19g/t Ag, 6.5m at 1.03% Cu, 4.7m at 1.48% Cu, in addition to 6.0m at 1.4% Cu / 31g/t Ag from the newly identified Rhyolite Target, all exceeding our expectations.
These results allow for a significant growth runway with less than 1% of the project area drilled. Ongoing mapping confirms a district wide mineralised envelope, consistent with our 25 million tonne Initial Exploration Target.
Shallow, near surface tabular copper deposit supports low capex and rapid development pathway, with a geometry amenable to open-pit operations.
The new Rhyolite Target copper-silver discovery adds a second, potentially large scale, mineral system, materially expanding the projects already significant upside potential.
On track to break ground on the Initial Mine Development in 2027, with a maiden resource expected as early as H1 2026.