The latest Investing Matters Podcast episode featuring Jeremy Skillington, CEO of Poolbeg Pharma has just been released. Listen here.
Not sure where the rig is at present. According to one site still was at previous drilling site on the first.Mobilisation is supposed to have started according to Zephyr. Is this part of rigging down from the previous drill? Rigging up is supposed to be planned for mid April. Not sure how long that takes. So drilling is unlikely in mid April unless that process is efficiently carried out. So unless activities have taken place not reported then drilling might not commence in mid April.
Tomorrow is 45 days since the end of the last quarter. Should get updates on Williston production if Zephyr follow the previous patterns. January delays should impact on the next quarter. However, the last RNS said before the end of the month for updates. So not so sure now.
Many here appear to be under the impression that Zephyr can control the data from these wells. The data will come but normally from official releases which are around fortnight after the end of the month. We are minority partners and rely on the operators to provide data. That said CH should have kept quiet about the release of data that he has no control over.
It would appear that the six wells are
LOON FEDERAL 5-24-25TFH
Loon Federal1-24-25H
LOON FEDERAL 2-24-25H
Loon Federal 5-SLTFH
VIXEN FEDERAL 1-5LH
GENESIS 2-13H
The first, forth and fifth appear to have had some production testing on September.
Names from April presentation slide 12 of 31. Production from pages 48 and fifty of spreadsheet.
Acknowledge both Duff 55 and Bridgedogg1