Tucked away at the bottom of the RNS25 Aug 2022 21:37
At the bottom of the RNS .
In April 2022, the trial for the lawsuit related to the chemical plant litigation commenced and concluded in July 2022. This litigation relates to one of Amec Foster Wheeler plc's subsidiaries, that Wood acquired in 2017, contracted to engineer, procure and construct a chemical plant for a client in Texas. The alleged actual damages total $695 million, including an alleged $317 million in lost revenue from delayed commercial operation.
The Group believes that the claims lack legal and factual merit but provided for an amount representing the fair value of the exposure upon acquisition of Amec Foster Wheeler. The Group has denied the claims and has strong legal and factual defences. Except for gross negligence, wilful misconduct, and warranty claims, overall liability is capped at 10 per cent of the contract price (or approximately $100 million).
A verdict is expected by year end. It is not possible to predict the ultimate outcome of the case at this point, but the Group remains open to a reasonable settlement. Due to likely appeals processes available to both parties, in the absence of a settlement it is not expected that an outflow will occur within the next 12 months.
Says it all troops the group is open to a reasonable settlement.