Charles Jillings, CEO of Utilico, energized by strong economic momentum across Latin America. Watch the video here.

Less Ads, More Data, More Tools Register for FREE
George Frangeskides, Chairman at ALBA, explains why the Pilbara Lithium option ‘was too good to miss’
George Frangeskides, Chairman at ALBA, explains why the Pilbara Lithium option ‘was too good to miss’View Video
Charles Jillings, CEO of Utilico, energized by strong economic momentum across Latin America
Charles Jillings, CEO of Utilico, energized by strong economic momentum across Latin AmericaView Video

Latest Share Chat

Jangada Mines upbeat on latest results from Pitombeiras

Mon, 15th Jun 2020 08:23

(Sharecast News) - Natural resources company Jangada Mines announced additional high-grade assay results from its diamond drilling programme at the Pitombeiras Vanadium Project in Brazil on Monday.
The AIM-traded firm said the programme was evaluating the structural corridor associated with the known vanadium titanomagnetite mineralisation, which included the Pitombeiras North and Pitombeiras South anomalies, and the newly-discovered Goela vanadium titanomagnetite targets.

It said the highest vanadium pentoxide grade intercept received to date stood at 0.81%, with both drilling results also representing the best results to date on a grade and width basis.

Results received included 35.25 metres at 0.70% vanadium pentoxide, 13.22% titanium dioxide and 64.74% ferric oxide, including seven metres at 0.81% vanadium pentoxide, 15.29% titanium dioxide and 72.69% ferric oxide on drillhole DD20PI19.

They also included 38 metres at 0.64% vanadium pentoxide, 12.51% titanium dioxide and 61.42% ferric oxide, including 14 metres at 0.75% vanadium pentoxide, 14.46% titanium dioxide and 70.97% ferric oxide on drillhole DD20PI20.

"The Pitombeiras North resource drilling programme continues to reassure the consistency of the grades, widths and continuity within the 50 metres-by-100 metres drilling grid whilst surprising us with these new highest grades intercepts, which increase the average grade of the programme to date to 0.535% vanadium pentoxide over an average of 31.34 metres in apparent thickness," said chairman Brian McMaster.

"There remain seven mineralised holes to be returned from the SGS-Geosol laboratory, six of them from the Goela target are expected in the coming weeks.

"We look forward to sharing these in due course and then determining an initial JORC resource estimate and continuing with a preliminary economic assessment."

At 0809 BST, shares in Jangada Mines were up 1.39% at 1.82p.

Related Shares

More News
15 Apr 2024 10:17

Blencowe makes progress on Uganda project feasibility study work

(Alliance News) - Blencowe Resources PLC on Monday reported "significant progress" on its definitive feasibility study work for its project in Uganda.

10 Apr 2024 12:40

Blencowe receives third tranche of funding for graphite project

(Alliance News) - Blencowe Resources PLC announced on Wednesday the receipt of a third tranche of its grant from the US International Development Fina...

6 Feb 2024 17:35

TRADING UPDATES: Power Metal firms Tati gold; Union Jack inks deal

(Alliance News) - The following is a round-up of updates by London-listed companies, issued on Tuesday and not separately reported by Alliance News:

29 Jan 2024 11:57

Blencowe Resources receives letter of interest for debt funding

(Alliance News) - Blencowe Resources PLC on Monday said it received a formal letter of interest regarding a participation in debt funding by the US In...

2 Jan 2024 11:55

Blencowe Resources ships bulk graphite to China for testing

(Alliance News) - Blencowe Resources PLC on Tuesday said 600 tonnes of bulk sample graphite mined at its Orom-Cross project have been shipped to China...

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.