Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPremier African Minerals Share News (PREM)

Share Price Information for Premier African Minerals (PREM)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.195
Bid: 0.19
Ask: 0.20
Change: 0.004 (2.09%)
Spread: 0.01 (5.263%)
Open: 0.195
High: 0.20
Low: 0.1925
Prev. Close: 0.191
PREM Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

AIM WINNERS & LOSERS: Premier African Minerals slides on project delay

Thu, 25th May 2023 11:22

(Alliance News) - The following stocks are the leading risers and fallers on AIM in London on Thursday.

----------

AIM - WINNERS

----------

European Metals Holdings Ltd, up 7.3% at 33.80 pence, 12-month range 29.50p-59.00p. The mineral exploration and development company says testwork confirms separation efficiency and capability of flotation of lithium-bearing zinnwaldite from Cinovec in Czechia. It notes that the updated flotation testwork recently undertaken at Nagrom Laboratories, Perth, has repeatedly reached over 95% lithium recovery from flotation concentrates at target Li-grades and mass yield. "The exceptional lithium extraction results are outstanding and further underline the commercial viability of operations at Cinovec," says Chair Keith Coughlan. "We expect the current testwork to be completed by the end of June and will publish the full results." Cadence Minerals, which has a 6.8% stake in European Metals, was down 1.6%.

----------

AIM - LOSERS

----------

Premier African Minerals PLC, down 29% at 0.55p, 12-month range 0.26p-1.04p. The Africa-focused minerals and metals project developer says its process plant at Zulu lithium and tantalum project is now fully commissioned. The supplier has advised Premier African that the milling and sizing component of the plant requires certain limited modifications to allow for full optimisation to design capacity throughput. It now expects the first spodumene shipments in June, and final optimisation in the fourth quarter of 2023 following plant modifications.

----------

RA International Group PLC, down 23% at 12.10p, 12-month range 11.05p-25.00p. The London-based remote site services provider in Africa and the Middle East says pretax loss narrowed to USD13.2 million in 2022 from USD32.2 million in 2021. Revenue rises 15% to USD62.9 million from USD56.4 million the prior year. However, the company's underlying earnings before interest, tax, depreciation, and amortisation falls by 91% to USD600,000 to USD6.7 million. The underlying Ebitda margin narrowed markedly to 1.0% from 12.3%. The company says this was a reflection of "inflationary pressure impacting the business since the second half of 2021". The margin pressure will abate over time, RA says, "with newly awarded contracts generating improved margins".

----------

By Sophie Rose, Alliance News reporter

Comments and questions to newsroom@alliancenews.com

Copyright 2023 Alliance News Ltd. All Rights Reserved.

More News
12 Apr 2024 13:20

Premier African raises another £1m due to strong institutional interest

(Sharecast News) - Premier African Minerals announced on Friday that it had raised a fresh £1m, due to strong institutional interest in its fundraising announced on 11 April.

Read more
12 Apr 2024 10:46

Premier African Minerals announces third share subscription of 2024

(Alliance News) - Premier African Minerals Ltd on Friday said it has accepted the subscription of further shares following strong institutional interest.

Read more
11 Apr 2024 13:05

IN BRIEF: Premier African raises GBP2 million for Zulu lithium asset

Premier African Minerals Ltd - minerals and metals producer focused on projects in Zimbabwe and Namibia - Announces a subscription offer for 1.2 billion new shares at an issue price of 0.17 pence each to raise around GBP2.0 million. Says the proceeds will go towards development of the company's Zulu lithium and tantalum project in Zimbabwe. The issue price represents a 15% discount to the company's Wednesday closing share price of 0.20p.

Read more
10 Apr 2024 13:36

TRADING UPDATES: Fulcrum acquires Ontario gold tailings project

(Alliance News) - The following is a round-up of updates by London-listed companies, issued on Wednesday and not separately reported by Alliance News:

Read more
2 Apr 2024 13:22

UK shareholder meetings calendar - next 7 days

Wednesday 3 April 
Downing Strategic Micro-Cap Investment Trust PLCGM re approval of B share scheme
Quantum Exponential Group PLCGM re delisting or potential investment in company
Thursday 4 April 
Rio Tinto PLCAGM
Scottish American Investment Co PLCAGM
TheWorks.co.uk PLCGM re Main Market delisting and AIM admission
Friday 5 April 
Faron Pharmaceuticals LtdAGM
VPC Specialty Lending Investments PLCGM re capital return via B share scheme
Monday 8 April 
Premier African Minerals LtdAGM
Tuesday 9 April 
Ethernity Networks LtdEGM re board appointments and option grants
  
Comments and questions to newsroom@alliancenews.com
  
A full 21-day events calendar is provided each day with a subscription to Alliance News UK Professional.
  
Copyright 2024 Alliance News Ltd. All Rights Reserved.

Read more
13 Mar 2024 18:18

TRADING UPDATES: Redrock acquires remainder of Australian subsidiary

(Alliance News) - The following is a round-up of updates by London-listed companies, issued on Wednesday and not separately reported by Alliance News:

Read more
29 Feb 2024 18:06

TRADING UPDATES: United Oil adds Jamaica expert; Vaalco makes buy

(Alliance News) - The following is a round-up of updates by London-listed companies, issued on Thursday and not separately reported by Alliance News:

Read more
26 Feb 2024 20:17

TRADING UPDATES: Begbies trading in line; Probiotix inks partnership

(Alliance News) - The following is a round-up of updates by London-listed companies, issued on Monday and not separately reported by Alliance News:

Read more
21 Feb 2024 15:51

EARNINGS AND TRADING: Sure Ventures value down after VividQ fundraise

(Alliance News) - The following is a round-up of earnings and trading updates by London-listed companies, issued on Monday and Tuesday and not separately reported by Alliance News:

Read more
15 Feb 2024 14:17

IN BRIEF: Premier African Minerals announces discounted Zulu fundraise

Premier African Minerals Ltd - Metal and mineral developer focused on Africa - Announces a fundraise for GBP2.5 million through a subscription at an issue price of 0.275p per new share. This represents a 17% discount to the company's Wednesday closing price of 0.33p per share. Proceeds will go towards the company's Zulu lithium and tantalum project in south-west Zimbabwe. Premier African says it has sufficient funding to take it to first production at Zulu, with commercial production set to commence in late February and first shipments expected for March. Negotiations with Zimbabwe-based lenders for working capital facilities at Zulu are ongoing, the company says.

Read more
9 Feb 2024 11:46

Premier African Minerals announces new Zulu resource estimate

(Sharecast News) - Premier African Minerals announced an update to its Zulu lithium and tantalum project on Friday, with the release of a new SAMREC-compliant mineral resource estimate, replacing the previous estimate issued in June 2017.

Read more
9 Feb 2024 11:22

IN BRIEF: Premier African notes new mineral resource estimate for Zulu

Premier African Minerals Ltd - Africa-focused metals and mineral project developer - Says mineral resource estimate forecasts lithium oxide at 107,366 tonnes and the direct conversion of the contained lithium oxide to spodumene concentrate is 1,789,433 tonnes at Zulu lithium and tantalum project.

Read more
24 Jan 2024 20:16

EARNINGS AND TRADING: Nanoco receives proceeds from Samsung litigation

(Alliance News) - The following is a round-up of earnings and trading updates by London-listed companies, issued on Wednesday and not separately reported by Alliance News:

Read more
18 Jan 2024 14:18

IN BRIEF: Premier African says production to begin next month at Zulu

Premier African Minerals Ltd - Africa-focused metals and mineral project developer - Says new ball mill that has been custom built for its Zulu lithium and tantalum project in Zimbabwe is expected to depart from South Africa in the last week of January. The ball mill is the last major item to be placed for a restart of production that is still anticipated for late February, Premier African says. By February, the company says "additional hydrosizer, mill discharge screen, and associated tanks, sumps and pumps" will have been installed.

Read more
9 Jan 2024 11:47

IN BRIEF: Premier African to start Zulu production in February

Premier African Minerals Ltd - Africa-focused metals and mineral project developer - Says drill assay results at Zulu lithium and tantalum project in Zimbabwe show consistent spodumene concentrate grades as low as 4%. Results also show lithium oxide grades of 1.00% and 0.95%. Chief Executive Officer George Roach says: "Those surface trench and drill hole results, originating from the Southeast pegmatite, represent very good potential for this pegmatite that is adjacent but discrete from the main mining and pit developments underway at present." Adds it is on track to target revenue generating production by late February.

Read more

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.