If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAUE.L Share News (AUE)

  • There is currently no data for AUE

Aureus Mining Increases License Size To Develop Second Gold Project

Mon, 11th May 2015 08:08

LONDON (Alliance News) - Aureus Mining Inc on Monday said the Bea Mountain mining license has been enlarged to include the Leopard Rock gold target, which will allow the company to develop a second gold project under its existing mineral development agreement.

The miner said the entire 13 kilometre gold bearing structural corridor stretching from the Gondoja target to the Leopard Rock South target is now located within the company's Bea Mountain mining licence. The license now covers 478 kilometres squared in total from the previous 457 kilometres squared.

The enlargement of the licence allows the company to try to commercially develop the entire mineralised gold corridor under the Mineral Development Agreement, subject to the granting of an environmental permit, said the company.

The rights to mine at the Leopard target are covered by the Bea Mountain Mineral Development Agreement, which "provides a stable environment in respect to the legal, operational and fiscal parameters for the operations", it said.

"The inclusion of the Leopard Rock gold target within our existing mining licence area will allow Aureus to develop the entire 13 kilometre gold corridor under the same fiscal and operating terms as the New Liberty project," said President and Chief Executive David Reading.

The New Liberty Gold project is located within the Southern Block of the 100% owned Bea Mountain mining licence and has a 25-year, renewable mineral development agreement.

Previous drilling at the Leopard target has produced intercepts including 17.6 grammes of gold per tonne over 4 metres, 13.9 grammes of gold per tonne over 4 metres, 9.4 grammes of gold per tonne over 3 metres, and 9.5 grammes per tonne over 3 metres.

Aureus currently has an exploration team carrying out field mapping and sampling whilst identifying potential targets. The company is hoping to begin a drilling programme on the targets in the first quarter of 2016.

"This consolidation enables us to focus our efforts solely on defining a second economic project rather than negotiating a new mineral development agreement for a portion of the corridor. We consider the gold corridor to be highly prospective and to date we have only drill tested approximately one kilometre of this area. This has resulted in the definition of over 900,000 ounces at Ndablama," said Chief Executive Reading.

Aureus shares were up 9.0% to 26.29 pence per share on Monday morning.

By Joshua Warner; joshuawarner@alliancenews.com; @JoshAlliance

Copyright 2015 Alliance News Limited. All Rights Reserved.

Related News

Aureus Mining raises $72m to fund transition
14 Oct 2016

Aureus Mining raises $72m to fund transition

(ShareCast News) - Aureus Mining announced on Friday that it has conditionally raised approximately $72m via an equity fundraising to finance its tran...

Aureus Mining battles mechanical issues and needs further funding
8 Aug 2016

Aureus Mining battles mechanical issues and needs further funding

(ShareCast News) - Gold production at Aureus Mining has continued to be hindered by breakdowns, mechanical issues and low equipment availability at th...

AUE.L News

Aureus Mining Net Loss Widens In 2013 On Costs, Impairment
6 Mar 2014

Aureus Mining Net Loss Widens In 2013 On Costs, Impairment

LONDON (Alliance News) - Aureus Mining Inc Thursday said its net loss widened in its full year as legal fees, expenses and a large impairment hit the ...

DIRECTOR DEALINGS: Aureus Mining Non-Executive Exercises Options
31 Jan 2014

DIRECTOR DEALINGS: Aureus Mining Non-Executive Exercises Options

LONDON (Alliance News) - Aureus Mining Inc Friday said non-executive director Luis Da Silva exercised options over 187,500 shares at an exercise price...

Aureus Mining Confirms Extension Of Mineralisation At Ndablama
27 Jan 2014

Aureus Mining Confirms Extension Of Mineralisation At Ndablama

LONDON (Alliance News) - Aureus Mining Inc Monday said it has found mineralisation following ten drill tests at the Ndablama Gold Project in Liberia. ...

First gold from Aureus Liberia pushed back to 2015
17 Dec 2013

First gold from Aureus Liberia pushed back to 2015

MONROVIA, Dec 17 (Reuters) - London-listed gold firm Aureus Mining will pour first gold at its Liberia project in the first quarter of 2015, the compa...

STOCKS NEWS EUROPE-FTSE AIM index weak, Angle outperforms
17 Dec 2013

STOCKS NEWS EUROPE-FTSE AIM index weak, Angle outperforms

Junior-listed AIM shares fall 0.4 percent, lagging the FTSE Small Cap index and the midcaps, up 0.2 percent and 0.1 percent respectively. Specialist m...

STOCKS NEWS EUROPE-UK small caps up 0.3 pct into mid-session
10 Dec 2013

STOCKS NEWS EUROPE-UK small caps up 0.3 pct into mid-session

The FTSE small cap index is up 0.3 percent into mid-session, outperforming the slightly weaker junior-listed AIM shares and the 0.2 percent gain on th...

Aureus Mining's New Liberty on track for first gold in 2015
2 Dec 2013

Aureus Mining's New Liberty on track for first gold in 2015

Aureus Mining said it was on track to produce its first gold from a scheme in Liberia in the first three months of 2015. Aureus said it had made sign...