Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pre-close Trading Update

23 Sep 2020 07:00

RNS Number : 7760Z
Hardide PLC
23 September 2020
 

The information communicated in this announcement is inside information for the purposes of Article 7 of Regulation 596/2014.

 

23 September 2020

 

Hardide plc

("Hardide" or "the Group" or "the Company")

 

Pre-close Trading Update

 

Hardide plc (AIM: HDD), the developer and provider of advanced surface coating technology, is pleased to provide an update on trading for the financial year ending 30 September 2020.

 

The Group expects (subject to audit and year-end adjustments) to report revenues of £4.7 million and an EBITDA loss of c.£0.5 million. This is in line with the Trading Update issued on 16 July 2020. Cash at bank is expected to be c.£2.7 million and there are capital commitments of c.£0.5 million remaining to fully complete the investment in the UK site relocation.

 

Production has continued uninterrupted at both the UK and US sites throughout the COVID-19 pandemic, with significant emphasis being placed on health and safety measures to protect staff and contractors.

 

The relocation of the business to the new site at Longlands Road, Bicester is now complete, on schedule and at projected cost. After delays due to travel restrictions, the large reactor has now been installed and commissioned, which completes the installation of all new equipment at the facility. This reactor, together with the new large pre-treatment line, increases considerably the size range of components that can be coated. One Airbus-approved reactor is still operational at the Wedgwood Road site and this will remain in place until the Longlands Road site is fully approved by Airbus. In addition to the developments in the UK, a fourth reactor has been installed at the Martinsville, Virginia facility making a total of nine reactors in the Group.

 

The extensive process of Airbus' qualification for the new site is progressing well and on schedule to be completed in early 2021. Orders are now starting to be received for the Airbus components that have been approved previously and shortly further parts are due to be approved by Airbus.

The Group previously reported the impact on its current year revenue from a delay in receiving a major oil and gas project order caused by the COVID-19 pandemic. Hardide is pleased to report that this order has now been received and will give a positive start to the first quarter of the new financial year. Generally, there has been a reduction in demand from oil and gas customers in this current second half as the global economy has slowed. However, it is pleasing that demand from customers in flow control and precision engineering has not been significantly affected.

Multiple test programmes for new applications are progressing strongly with customers in various sectors and therefore present encouraging prospects for new business in the 2020-21 financial year. Looking beyond the disruption of the present COVID-19 pandemic, the Board of Hardide believes there are strong grounds for expecting a return to increasing demand and remain positive about the longer-term growth of the Company.

 

The Group expects to report its preliminary results for the year to 30 September 2020 on or around 7 December 2020.

 

Enquiries:

 

Hardide plc

Robert Goddard, Non-Executive Chairman

Philip Kirkham, CEO

Jackie Robinson, Communications Manager

 

 

Tel: +44 (0) 1869 353830

 

IFC Advisory

Graham Herring / Tim Metcalfe / Florence Chandler

 

Tel: +44 (0) 20 3934 6630

 

finnCap - Nominated Adviser and Joint Broker

Henrik Persson / Matthew Radley (corporate finance)

Richard Chambers (ECM)

 

Allenby Capital- Joint Broker

Jeremy Porter (Corporate Finance)

Tony Quirke (Sales)

 

Tel: +44 (0) 20 7220 0500

 

 

Tel: +44 (0) 20 3328 5656

Notes to editors:

Hardide develops, manufactures and applies advanced technology tungsten carbide/tungsten metal matrix coatings to a wide range of engineering components. Its patented technology is unique in combining, in one material, a mix of toughness and resistance to abrasion, erosion and corrosion; together with the ability to coat accurately interior surfaces and complex geometries. The material is proven to offer dramatic improvements in component life, particularly when applied to components that operate in very aggressive environments. This results in cost savings through reduced downtime and increased operational efficiency. Customers include leading companies operating in oil and gas exploration and production, valve and pump manufacturing, precision engineering and aerospace industries.

www.hardide.com

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
TSTELLFLBKLXBBE

Related Shares

Back to RNS

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.