The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Drilling Update

19 May 2011 07:00

Hambledon Mining plc

("Hambledon" or "Company")

Latest drilling results from Sekisovskoye Underground Project, Kazakhstan

Hambledon Mining plc (AIM: HMB), the Kazakhstan gold producer, today provides an update on the latest set of drill results received from its substantial underground drill programme at Sekisovskoye.

Results from the drill campaign during March and April 2011:

Seventeen drill holes completed to date, all have intersected gold mineralisation Over 2,730 metres drilled of planned 25,000 metre operation Key mineralised intersections include: Hole D66 - 18m at 3.66 g/t Au Hole D133 - 15m at 4.0 g/t Au Hole D67 - 1m at 10.9 g/t Au

The results from completed drilling continue to show increases in overall width of mineralisation when compared to the drilling undertaken in the 1990s and historically by the Soviet exploration programmes. These width extensions lead to an increased volume of economic mineral resources.

The recent drilling has been aligned to the mine planning work for stope definition. This information is to be used by Golders Associates ("Golders") in their current geological modeling of Sekisovskoye at 1.0 g/t Au cut off grade boundary. This modelling forms the basis for the detailed mine engineering that is also being undertaken by Golders. The result of both studies is that later in 2011 Hambledon will be in a position to update its mineable reserve statement. The analytical works were carried out in the Altai Ken-Bayitu laboratory with independent assay verification undertaken by the Alex Stewart Group in Karabalta, Kyrgyzstan.

The Sekisovskoye deposit comprises approximately ten large mineralised zones intermingled with an additional 190 narrow and sinuous mineralisation zones. The zones of mineralisation show wide variation in thickness from 0.35 metres to 30 metres with an average of 2.2 metres and localised pinch and swell structure, with variable gold and silver content.

Tim Daffern, CEO, commented:

"Our positive progress in the drilling programme has resulted in gold mineralisation in line with management expectations. We hope to update shareholders before the end of the June with the next batch of underground drill results. To date, 17 drill holes have been completed and the results have confirmed the geometry of the resource and validity of the current resource model"

Appendix 1

Sekisovskoye 2011 - Drill result summary as of May 2011, hole 9 (complete) to hole 17.

? HOLE COORDINATES DEPTH GOLD MINERALIZATION_ore intervals
X Y Z AZI DIP drilled core total FROM TO LENGTH AA-AKB LAB, AU, g/t
9 D125 7617.3 6757.22 322.95 225 -30 189.8 189.8 189.8 3.00 4.00 1 7.32
11.00 15.00 4 2.38
37.00 70.00 33 4.5
91.00 92.00 1 1.32
109.00 110.00 1 1.78
123.00 124.00 1 1.38
145.00 147.00 2 2.16
170.00 171.00 1 1.5
177.00 178.00 1 1.29
10 D135 7613.814 6640.819 327.047 41 0 75.1 75.1 75.1 15.00 16.00 1 1.59
11 D136 7611.787 6639.246 325.657 230 -68 164.1 164.1 164.1 38.00 53.00 15 1.52
98.70 99.70 1 1.37
158.00 159.00 1 1.52
12 D67 7449.712 6930.709 324.24 225 -46.4 209.4 209.4 209.4 17.00 18.00 1 1.26
30.50 31.50 1 1.14
38.70 39.80 1.1 5
135.00 136.00 1 10.9
170.70 171.40 0.7 1.17
174.80 176.00 1.2 2.11
205.00 206.00 1 1.33
13 D139 7586.18 6614.071 326.905 227 0 175.6 175.6 175.6 71.00 72.00 1 1.26
124.00 126.00 2 2.29
14 D66 7453.59 6934.41 324.56 49 -43 70.5 70.5 70.5 7.00 8.00 1 1.7
12.00 13.00 1 1.88
17.00 18.00 1 1.06
22.00 34.00 12 3.66
37.00 43.00 6.00 2.87
64.00 65.00 1.00 4.82
15 D137 7609.407 6637.11 324.849 224 -33.1 91.9 91.9 91.9 4.00 5.00 1.00 1.34
16 D134 7564.42 6649.838 325.01 230 -41 61.5 61.5 61.5 3.00 4.00 1 1.85
29.00 30.00 1 1.3
36.00 37.00 1 1.38
17 D133 7564.67 6650.032 324.145 226 -78 123 123 123 8.40 9.40 1.00 1.34
20.80 21.80 1.00 4.65
24.80 25.80 1.00 2.13
30.70 31.60 0.90 1.29
40.30 41.30 1.00 1.12
48.00 49.00 1.00 1.24
50.00 51.00 1.00 1
55.00 56.00 1.00 1.48
69.00 77.00 8.00 1.15
87.00 88.00 1.00 3.93
93.00 108.00 15.00 4
111.00 112.00 1.00 1.62
114.00 115.00 1.00 1.14

Qualified Person

Information in this report relating to the exploration results is based on data reviewed by Timothy Daffern, BEng, MBA, FIMMM, MIMMM, MCIM, Chartered Mining Engineer, Chief Executive Officer of Hambledon Mining plc. Timothy Daffern has in excess of 21 years experience in mineral project development and evaluation including exploration and is a Qualified Person under the AIM Rules.

ENQUIRIES:

HAMBLEDON MINING:

Telephone +44 (0)207 233 1462

Charles Zorab

FAIRFAX I.S. PLC (NOMAD AND JOINT BROKER):

Telephone +44 (0)207 598 5368

Ewan Leggat/Katy Birkin

AMBRIAN PARTNERS LTD (JOINT BROKER):

Telephone +44 (0)207 634 4700

Samantha Harrison/Shaun Whyte

TAVISTOCK COMMUNICATIONS:

Telephone +44 (0)207 920 3150

Ed Portman/Jos Simson

Copyright Business Wire 2011

Related Shares

Back to RNS

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.