If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksTethyan Resources Regulatory News (TETH)

  • There is currently no data for TETH

Exploration Update

16 May 2006 07:01

Triple Plate Junction Plc16 May 2006 For immediate release 16 May 2006 Triple Plate Junction plc ("TPJ" or the "Company") EXPLORATION UPDATE - DRILLING UNDERWAY AT PU SAM CAP Triple Plate Junction Plc (AIM : TPJ), the AIM-listed gold exploration companyhas commenced a 700m drill program at the Pu Sam Cap exploration license in theLai Chau Province of Vietnam. While assay results are still awaited, earlyindications support the Company's belief that Pu Sam Cap has the potential tohost a substantial multi-metal deposit. DIAMOND DRILLING: Stage 1 drilling at Pu Sam Cap commenced on 4 May 2006 This involves drilling afence line of three angled holes for a total of 700m to test the depth extensionof mapped mineralized structures seen at surface. The Pu Sam Cap license is thesubject of a joint venture with Newmont Vietnam Pty Limited, a subsidiary ofNewmont Mining Corporation the world's largest gold producer. The geology andstructures in the license area along with extensive gold and coppermineralisation led the independent consultant, ACA Howe, to conclude that therewas every indication of a long lived hydrothermal system with possibly multiplephases of gold mineralisation; both epithermal and porphyry style. Detailed mapping of the artisanal workings at Pu Sam Cap has confirmed a numberof major intersecting structures that have the potential to contain significanttonnages of gold-bearing mineralization as well as bonanza grade gold values ina dilational setting, particularly in what is known as Zone 5 of the artisanalworkings. Sampling of these workings has returned gold values up to 64g/t goldand 121g/t silver, 4.86% copper, plus anomalous copper, lead, molybdenum,antimony and bismuth. These mineralized structures have been traced over astrike length of several kilometres and have an observed vertical extent of some500 -800 metres. They occur within a volcanic diatreme breccia complexcharacterized by specularite-potassic feldspar alteration typical of majoralkaline Iron-Oxide-Copper-Gold (IOCG) deposits around the world, such as theCandelaria-Punta del Cobra district of Chile, Pampa in Argentina and Werneke inYukon, Canada. The first hole is at a depth of 191m having gone through a fracture zone from183.5m to approximately 187.5m (about 4m), within which is a 0.5m wide zone ofcalcite-quartz-chalcopyrite which is visually similar to the high grade zones atsurface and near-surface workings. If assays return similar values to thosefound at and near-surface it will prove the continuity of these gold richstructures at depth. The core is currently on its way for assay. MAGNETIC-RADIOMETRIC SURVEY: A helicopter-borne magnetic-radiometric survey has recently been completed overthe entire Pu Sam Cap exploration license areas. The ability to bring a foreignhelicopter with modern geophysical equipment into the sensitive north-westborder areas of Vietnam, again a first for this part of the country, is atribute to the painstaking preparatory work carried out by TPJ to build strongrelationships with the central and provincial government authorities. Thegeophysical equipment is owned by Newmont Mining Corporation and Newmontpersonnel operated the survey equipment and are presently interpreting theresults. The airborne geophysical survey will give TPJ a better understanding of thegeology, structure and mineralization of the Pu Sam Cap area. It is designed topin-point geological and structural controls for any major mineralized systemsconcealed within or marginal to the Pu Sam Cap complex. The massive volumes of specularite-rich alteration, observed at Pu Sam Cap,often reflect the upper levels of a significant IOCG system, grading down intomore magnetite-rich mineral bodies or distal base-metal halos (Barton & Johnson,2000). This will be investigated as part of the current and subsequentexploration campaign. Geoff Walsh, Chief Executive of TPJ said "Pu Sam Cap was TPJ's cornerstone project at listing and drilling the firsttarget is a milestone for TPJ. It is providing us with our first look atsub-surface structures on this exciting prospect. Intersecting thecalcite-quartz-chalcopyrite vein at depth on the first of our three-hole plan isan excellent result. We are also delighted with the support we have received from Newmont on theairborne geophysical survey. The results will help focus our exploration effortson this highly prospective area." For further information please contact: Triple Plate Junction plc 020 7499 1400Geoff Walsh, Chief ExecutiveDavid Lees, Finance Director Buchanan Communications 020 7466 5000Tim Anderson / Isabel Podda/Ben Willey This statement contains certain "Forward looking Statements". All statements,other than statements of historical fact, included herein, including, withoutlimitation, statements regarding potential mineralization and reserves,exploration results and future plans and objectives of Triple Plate JunctionPlc, are forward looking statements that involve various risks anduncertainties. There can be no assurance that such statements will prove to beaccurate and actual results and future events could differ materially from thoseanticipated in such statements. Certain risk factors may also affect the actualresults achieved by Triple Plate Junction Plc. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
15th Feb 20125:21 pmRNSHoldings in Company
13th Feb 20127:52 amRNSProject Update - Crater Mountain
13th Feb 20127:01 amRNSProject Update - Crater Mountain
10th Feb 201212:55 pmRNSProject Update - Morobe - Replacement
10th Feb 201210:19 amRNSProject Update - Morobe
7th Feb 201211:15 amRNSProject Update - Crater Mountain
31st Jan 20125:12 pmRNSIncentivisation Arrangements - JSOP
27th Jan 20127:56 amRNSProject Update - Crater Mountain
26th Jan 20127:00 amRNSProject Update - Crater Junction
19th Jan 20122:32 pmRNSMorobe Update - Gumots Drilling
30th Dec 20111:01 pmRNSProject Update - Crater Mountain
30th Dec 201110:29 amRNSMorobe Update
30th Dec 20117:00 amRNSTotal Voting Rights
23rd Dec 20111:05 pmRNSArbitration Proceedings
23rd Dec 20111:01 pmRNSProject Update - Crater Mountain
21st Dec 20119:14 amRNSProject update - Crater Mountain
16th Dec 201110:45 amRNSIssue of Equity; Registered Office
14th Dec 20119:43 amRNSProject Update - Crater Mountain
6th Dec 201110:45 amRNSUpdate on Manus Island
30th Nov 20119:37 amRNSInterim Report
25th Nov 20117:00 amRNSProject Update - Crater Mountain
24th Nov 201110:07 amRNSProject Update - Crater Mountain
17th Nov 20119:10 amRNSProject Update - Crater Mountain
17th Nov 20117:00 amRNSChange of Adviser
31st Oct 20117:00 amRNSTotal Voting Rights
25th Oct 201110:05 amRNSProject Update - Crater Mountain
10th Oct 201110:12 amRNSProject Update - Crater Mountain
30th Sep 20114:32 pmRNSResult of AGM
30th Sep 20117:00 amRNSTotal Voting Rights
27th Sep 20117:00 amRNSIssue of Equity
13th Sep 20111:16 pmRNSProject Update - Crater Mountain
7th Sep 20113:45 pmRNSAppointment of Adviser
5th Sep 201110:52 amRNSNotice of AGM - Correction
2nd Sep 20113:27 pmRNSNotice of AGM
25th Aug 20117:00 amRNSFinal Results
12th Aug 201111:01 amRNSThe Crater Mountain Project
1st Aug 20117:00 amRNSTotal Voting Rights
29th Jul 20113:56 pmRNSProject Update - Pu Sam Cap
26th Jul 20118:57 amRNSProject Update - Crater Mountain
21st Jul 20114:33 pmRNSProject Update - Crater Mountain
19th Jul 20117:00 amRNSDrilling Commences at Hide's Creek
12th Jul 20113:41 pmRNSProject Update - Crater Mountain
6th Jul 201111:29 amRNSProject Update - Crater Mountain
1st Jul 20117:00 amRNSIssue of Equity and Directors' Interests
29th Jun 201110:16 amRNS"Heli-mag" Survey Commences at Manus Island
16th Jun 20118:38 amRNSHolding(s) in Company
12th May 201111:11 amRNSProject Update - Crater Mountain
4th May 20117:00 amRNSIntended Issue of Options
3rd May 201110:16 amRNSProject Update - Crater Mountain
11th Apr 20117:00 amRNSCommencement of Drilling

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.