focusIR May 2024 Investor Webinar: Blue Whale, Kavango, Taseko Mines & CQS Natural Resources. Catch up with the webinar here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksTALV.L Regulatory News (TALV)

  • There is currently no data for TALV

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Cooperation agreement with Ou

23 Jun 2008 12:37

RNS Number : 2959X
Talvivaara Mining Company PLC
23 June 2008
 



23 June 2008

Talvivaara Mining Company Plc 

Talvivaara signs cooperation agreement with Outokumpu Oyj to conduct a feasibility study on manganese production at the Talvivaara Mine

Talvivaara Mining Company Plc ("Talvivaara" or the "Company") announces today that it has signed a Cooperation Agreement (the "Agreement") with Outokumpu Oyj ("Outokumpu") to conduct a feasibility study on manganese production at the Talvivaara MineThe feasibility study will encompass an evaluation of the technical and commercial feasibility of employing electrowinning technology for the extraction of manganese metal and/or manganese oxide from the leach solution generated from Talvivaara's bioheapleaching process. 

The ore at the Talvivaara deposits has a manganese content of approximately 0.3%, which should enable annual production of more than 30,000 tonnes of manganese, according to the Company's present production plan. Over the last two years, Talvivaara has conducted a pre-feasibility study on the extraction of manganese and obtained encouraging results for the electrolytic recovery of high-purity manganese metal and manganese oxide from the leach solution. In the bioheapleaching process, recovery of manganese has been found to be comparable to that of nickel and zinc. 

Outokumpu is an international stainless steel company with production plants in FinlandSwedenBritain and the United States, and has a continuous need for base metal alloys such as nickel, ferrochrome, molybdenum and manganese in its production. 

Commenting on the announcement, Talvivaara's CEO, Pekka Pera, said: "The potential to produce manganese at the Talvivaara mine is a bonus over and above our strongly developing nickel operations and it is part of our long term strategy to expand the scope of our business. As well as potentially generating additional cash flow to the Company, the commercial production of manganese would also reduce the environmental burden of our operations and create savings in operating costs by eliminating manganese removal in the water purification process

We are particularly delighted to be working on this project with Outokumpu, a leading stainless steel producer with unrivalled expertise in this area."

"Outokumpu is very pleased to be involved in the feasibility study, because Outokumpu is a significant user of manganese", states Pekka Erkkilä, EVP, from Outokumpu.

ENQUIRIES

Talvivaara Mining Company Ltd Tel: +358 20 7129 800

Pekka Perä

Saila Miettinen-Lähde

Outokumpu Oyj

Niilo Suutala Tel: +358  40 734 1767

Merlin Tel: +44 207 653 6620

Tom Randell

Anca Spiridon

NOTES TO EDITORS

Company Overview

Talvivaara and its subsidiary Talvivaara Project Ltd aims to become an internationally  significant base metals producer with its primary focus on nickel and zinc using a technology known as bioheapleaching to extract metal out of low grade ore

 

The Company's main activity is the development and exploitation of two polymetallic deposits, Kuusilampi and Kolmisoppi, in SotkamoFinland (together, the "Talvivaara deposits") using bioheapleaching technology (the "Talvivaara Project")

 

The Talvivaara deposits comprise one of the largest known sulphide nickel resources in Europe with 266 million tonnes of ore in measured and indicated resources

Resources are sufficient to support anticipated production for a minimum of 24 years, expected to start in late 2008, with an expected annual nickel output of approximately 33,000 tonnes; the Company has the potential to provide approximately 2.3% of the world's current annual production of nickel by 2010

In addition to the mining of nickel, as by-products of the process, the mine is also expected to produce zinc (approximately 60,000 tpa), copper (approximately 10,000 tpa) and cobalt (approximately 1,200 tpa)

The mine site is situated close to existing energy and transportation infrastructure

 

The Group plans to develop the Talvivaara deposits using bioheapleaching technology

 

Bioheapleaching harnesses locally occurring, live bacteria for the extraction of metals from ore

This technology is already widely used for other metals, notably copper and gold

During the last two years, the Group has demonstrated the viability of using the bioheapleaching technology for the extraction of nickel in large on-site pilot trials

 

The Talvivaara orebody is well-suited for open pit mining due to the thin overburden, favourable resource geometry and a low waste to ore ratio

 

The ore has a nickel content of 0.27 per cent. and is well-suited to bioheapleaching due to both its high sulphide content and its low pH, which enables rapid leaching with reduced need for chemical catalysis

 

The Company has secured a 10-year off-take agreement for 100 per cent. of its main product output of nickel and cobalt to Norilsk Nickel

 

With good infrastructure, progressive mining laws, subsidy policies and economically and politically stable operating environment and readily available mining expertise, Finland provides a favourable environment for operating a mine

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
AGREAFKDADDPEFE
12
Date   Source Headline
23rd Jun 20144:40 pmRNSSecond Price Monitoring Extn
23rd Jun 20144:35 pmRNSPrice Monitoring Extension
16th Apr 20144:35 pmRNSPrice Monitoring Extension
17th Feb 20144:35 pmRNSPrice Monitoring Extension
27th Nov 20134:40 pmRNSSecond Price Monitoring Extn
27th Nov 20134:35 pmRNSPrice Monitoring Extension
26th Mar 201312:57 pmPRNDisclosure of Short Position: Talvivaara Mining Co Plc
11th Feb 20134:35 pmRNSPrice Monitoring Extension
21st Dec 20095:32 pmRNSDates of Financial Reporting for 2010 Announced
22nd Oct 200911:00 amRNSCrushing enhancement and ramp up of mining
7th Aug 20095:34 pmRNSResult of AGM
7th Aug 20093:47 pmRNSHolding(s) in Company
22nd Jun 20098:00 amRNSHolding(s) in Company
4th Jun 20098:43 amRNSHolding(s) in Company
3rd Jun 20097:00 amRNSNotice of EGM
2nd Jun 20091:50 pmRNSResult of Placing
2nd Jun 20097:00 amRNSProposed Placing and Trading Update
13th May 20098:39 amRNSHolding(s) in Company
7th May 20098:30 amRNSSecondary Listing on NASDAQ OMX Helsinki
30th Apr 20091:30 pmRNSResolutions of Annual General Meeting
28th Apr 20097:00 amRNSInterim Management Statement
17th Mar 20099:00 amRNSNotice of AGM
13th Mar 200912:18 pmRNS2009 Annual General Meeting
4th Mar 20097:00 amRNSAnnual Results
27th Feb 200910:00 amRNSNotice of Results
19th Feb 20099:28 amRNSTalvivaara Delivers First Nickel to Norilsk Nickel
5th Jan 200911:39 amRNSDirector/PDMR Shareholding
22nd Dec 200810:48 amRNSPublication Dates for InterimManagementStatements
4th Dec 20087:00 amRNSResource and Operations Update
21st Nov 20084:47 pmRNSSecond Price Monitoring Extn
21st Nov 20084:37 pmRNSPrice Monitoring Extension
14th Oct 20082:38 pmRNSDirector Dealings
2nd Oct 20087:00 amRNSInterim Management Statement
1st Oct 20089:40 amRNSFirst Metal Production
11th Sep 200811:57 amRNSDirector Dealings
29th Aug 20087:02 amRNSInterim Results
16th Jul 200810:10 amRNSMaterials Handling Process Co
30th Jun 200812:15 pmRNSDirector Dealings
23rd Jun 200812:37 pmRNSCooperation agreement with Ou
13th May 20084:41 pmRNSConvertible bonds offering pl
13th May 20086:00 amRNSOffering of convertible bonds
29th Apr 200812:35 pmRNSInterim Management Statement
2nd Apr 20087:01 amRNSFirst Blast Ceremony
14th Mar 20081:09 pmRNSResult of AGM
7th Mar 200812:00 pmRNSEuromoney Award
26th Feb 20087:01 amRNSAnnual Results
18th Feb 20084:53 pmRNSChange in Date of Results
21st Dec 200712:00 pmRNSInterim Management Statements
21st Dec 200712:00 pmRNSFinancial Reporting Schedule
13th Dec 200712:25 pmRNSDirector Dealings
12

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.