Trinidad Operational Update

19 Mar 2015 07:00

RNS Number : 8496H
Range Resources Limited
19 March 2015
 



Trinidad Operational Update

 

Range is pleased to provide a Trinidad update with the following highlights:

 

· Production increased by 23% from the previous month;

· Testing on two wells in the South Quarry field is currently ongoing;

· One further well is drilling ahead in the South Quarry field;

· The sale of Range Resources Drilling Services Limited is on track to complete before the end of the month;

· LandOcean has committed to add four new drilling rigs this year to the existing fleet to be available for drilling from Q3 2015;

· Waterflood preparations are progressing, with the first preferred waterflood project now identified on Beach Marcelle field;

· Waterflood studies have been extended to include further blocks;

· In accordance with the revised internal forecast, management believes the production target of 1,000 bopd will now be achieved during Q4 2015.

Development and exploration programmes

 

Current production in Trinidad reached 645 barrels of oil per day (bopd) from an average of 525 bopd in the previous month.

 

During the current quarter, the Company has:

 

· Completed two new development wells (QU 454 and QU 455) in the South Quarry field to depths of 1,440 ft. and 890 ft. respectively, with testing operations currently ongoing;

· Brought three new development wells in the Morne Diablo field into production (these wells were drilled in the previous quarter), including the QUN 157 well, which is currently flowing at a stabilised rate of 105 bopd on a restricted 5/32" choke from an average perforated depth of 1,300 ft.;

· The QU 456 well spudded and is drilling ahead in the South Quarry field to a target depth of 2,000 ft.;

· Spudding of the first shallow onshore exploration well on the Guayaguayare licence has been postponed to Q2 2015; and

· Range and its strategic partner LandOcean Energy Services Co., Ltd (LandOcean) are progressing with geological and geophysical studies which are aimed at improving operational efficiency, and sub-surface evaluation, in order to reduce risk and increase reward. These studies resulted in a revision of the previous development and exploration drilling programmes. The refined 2015 / 2016 work programme is being finalised and will be announced in the coming weeks. 

Waterflood programme

 

Beach Marcelle waterflood project

 

As previously announced, LandOcean has been evaluating three waterflood blocks in the Beach Marcelle field: C, NE, and SE blocks, and two blocks in the South Quarry field. Study work is now being extended to include two further blocks in Beach Marcelle: SW and NW blocks, which were previously partially waterflooded by Texaco.

 

Following a further review, Range and LandOcean have jointly come to a conclusion that given its potential for additional reserves recoverable by waterflooding, the first preferred waterflood project on the Beach Marcelle field will be on the SE block. The next key steps in the programme will be for Range to study the economics and feasibility of the waterflood project for this block in detail, ahead of any relevant approvals, including regulatory approvals.

 

In the meantime, operations are in progress with continued integrity testing of existing wellbores in the SE and C blocks, with some 60% of wells now tested. Surface facility studies by LandOcean engineers are continuing.

 

Morne Diablo waterflood project

 

LandOcean has reviewed existing plans for expansion of the successful pilot waterflood scheme, and has suggested changes to the waterflooding pattern which could enhance incremental production and recovery from the project. Studies to compare the anticipated recoveries and production from each of the waterflood patterns are now underway, with a view to defining the preferred waterflood scheme, and commencing implementation, during Q2/Q3 2015.

 

Rig fleet update

 

Further to the Company's announcement on 14 January 2015, the sale of Range Resources Drilling Services Limited (RRDS) to LandOcean Petroleum Corp. Ltd is progressing well with final completion anticipated before the end of March 2015. To date, Range has received US$2.3 million of the sale proceeds with the remainder anticipated to be received at final completion.

 

RRDS will continue to provide full oilfield operations services to Range in Trinidad, to accelerate Range's planned development and exploration drilling programmes, with services to be priced at competitive rates, to be reviewed by Range's management periodically.

 

Range is pleased to advise that LandOcean has committed to add four new drilling rigs this year to the existing fleet as follows:

 

 

Rig

Drilling Capability (depth)

Status

A

4,900 ft.

Currently on route to Trinidad and scheduled to commence drilling from August 2015

B

9,800 ft.

Expected to be transported to Trinidad in June 2015 and scheduled to commence drilling from October 2015

C

3,200 ft.

Expected to be transported to Trinidad in Q4 2015

D

6,500 ft.

Expected to be transported to Trinidad in Q4 2015

 

 

Revised production forecast

 

The Company announced on 30 September 2014 that it was aiming to reach production of 1,000 bopd during the first half of 2015. In accordance with the revised internal forecast, and based on anticipated completion of the proposed US$60 million funding with Core Capital Management Co., Ltd in April 2015, management believes the production target of 1,000 bopd will now be achieved during Q4 2015.

 

The Company is finalising its detailed production forecast which will be announced in Q2 2015.

 

 

 

Contacts

Cantor Fitzgerald Europe(Nominated Advisor and Broker)

David Porter / Sarah Wharry(Corporate finance)

Richard Redmayne (Corporate broking)

t. +44 (0)20 7894 7000

 

Range Resources Limited

Australian Office

Ground Floor, BGC Centre

28 The Esplanade

Perth WA 6000

Australia

 

t. +618 6205 3012

UK Office

Suite 1A, Prince's House38 Jermyn StreetLondon, SW1Y 6DNUnited Kingdom

t. +44 (0)20 7025 7040

f. +44 (0)20 7287 8028

e. admin@rangeresources.co.uk

www.rangeresources.co.uk

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCGLGDXSBBBGUC
Date   Source Headline
21st Feb 20147:00 amPRNTrinidad Operations Update
14th Feb 20145:00 pmPRNNotice of General Meeting
6th Feb 20147:00 amPRNChange of Advisors
3rd Feb 20143:00 pmPRNSuccessful Bid for St. Mary’s Block in Trinidad
3rd Feb 20147:00 amPRNAppointment of CEO and Non Executive Directors
3rd Feb 20147:00 amPRNQuarterly Activities Report
31st Jan 20144:40 pmRNSSecond Price Monitoring Extn
31st Jan 20144:35 pmRNSPrice Monitoring Extension
28th Jan 20147:36 amPRNGuatemala Update
15th Jan 20147:55 amPRNGuatemala Update
10th Jan 20143:27 pmPRNTexas Update and Investor Update Conference Call
8th Jan 201411:11 amPRNGuatemala Update
27th Dec 20134:40 pmRNSSecond Price Monitoring Extn
27th Dec 20134:35 pmRNSPrice Monitoring Extension
19th Dec 20137:03 amPRNTrinidad Update
17th Dec 20137:00 amPRNRange completes farm-in agreement with Niko Resources
29th Nov 20134:40 pmRNSSecond Price Monitoring Extn
29th Nov 20134:35 pmRNSPrice Monitoring Extension
26th Nov 20134:35 pmRNSPrice Monitoring Extension
26th Nov 20137:51 amPRNResults of AGM
26th Nov 20137:30 amPRNTrinidad Update
21st Nov 20134:35 pmRNSPrice Monitoring Extension
21st Nov 20138:12 amPRNGuatemala Update
1st Nov 20137:00 amPRNQuarterly Activities Report and Appendix 5B
29th Oct 201311:30 amPRNCompany Update
29th Oct 201310:11 amPRNAnnual Report and Notice of Meeting
28th Oct 20137:00 amPRNGuatemala Update
10th Oct 20138:37 amPRNASX Price Query and Texas Sale Update
3rd Oct 20134:35 pmRNSPrice Monitoring Extension
1st Oct 20138:20 amPRNGuatemala Update
27th Sep 201310:41 amPRNAnnual Financial Report
16th Sep 20137:01 amPRNTrinidad and Texas Update
12th Sep 20134:35 pmRNSPrice Monitoring Extension
4th Sep 20137:51 amPRNGuatemala Update
3rd Sep 20139:58 amPRNGeorgian Update
3rd Sep 20139:53 amPRNGeorgia and Texas Update
22nd Aug 20137:43 amPRNTrinidad Update and Key Appointments
16th Aug 20137:30 amPRNStatement re Share Price Movement
9th Aug 20132:05 pmPRNTexas Asset $30M Sale Finalised
1st Aug 20137:00 amPRNQuarterly Activities Report and Appendix 5B
29th Jul 20138:03 amPRNGuatemala Update
24th Jul 20137:00 amPRNMerger Update - Potential Sale of Russian Assets
22nd Jul 20137:00 amPRNGuatemala Update
12th Jul 20133:59 pmPRNMerger Update
11th Jul 201310:37 amPRNAmended Appendix 3B
9th Jul 20137:02 amPRNGuatemala Update
4th Jul 20137:39 amPRNRange increases its footprint in Trinidad
19th Jun 20139:20 amPRNResults of General Meeting
17th Jun 20137:16 amPRNInternational Petroleum Transaction and Guatemala Update
10th Jun 20137:35 amPRNTrinidad Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.