Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSOLO.L Regulatory News (SOLO)

  • There is currently no data for SOLO

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Portland Extended Flow Test at Horse Hill-1

18 Jul 2018 14:00

RNS Number : 0546V
Solo Oil Plc
18 July 2018
 

FOR IMMEDIATE RELEASE

18 July 2018

 

SOLO OIL PLC

("Solo" or the "Company")

 

 

Portland Extended Flow Test ("EWT") at Horse Hill-1, PEDL137, Weald Basin, UK

 

Solo Oil plc (LSE AIM: SOLO) is pleased to note the announcement made today by UK Oil & Gas Investments PLC - "Portland Extended Flow Test ("EWT"): Well Clean-Up Phase Complete, Dry Oil Flows to Surface, Horse Hill-1 Oil Discovery, PEDL137, Weald Basin, UK" and set out in Appendix 1 below.

 

The Company holds a 9.75% beneficial interest in licence PEDL137 containing the HH-1 oil discovery.

 

Neil Ritson, Solo's Chairman, commented:

 

"This is an excellent start to the extended well tests at Horse Hill and fully confirms our expectations for the productivity of the Portland reservoir. A lot more testing is planned over the coming months and we look forward to further positive updates from the operator as the test sequence progresses."

For further information:

Solo Oil plc

Neil Ritson / Dan Maling

+44 (0) 20 7440 0642

 

 

Beaumont Cornish Limited

Nominated Adviser

Roland Cornish / Rosalind Abrahams

+44 (0) 20 7628 3396

 

Shore Capital

Broker

Jerry Keen

 

Buchanan (PR)

Ben Romney / Chris Judd / Henry Wilson

 

 

+44 (0) 20 7408 4090

 

 

 

+44 (0) 20 7466 5000

 

 

 

 

APPENDIX ONE

 

UK Oil & Gas Investments PLC

("UKOG" or the "Company")

 

Portland Extended Flow Test ("EWT"): Well Clean-Up Phase Complete, Dry Oil Flows to Surface,

Horse Hill-1 Oil Discovery, PEDL137, Weald Basin, UK

 

Highlights:

 

· Initial Portland well "clean-up" phase completed successfully

· Light sweet crude oil (36 API) and associated solution gas flowed sustainably via pump and natural flow to surface over a 4-day period to date. Oil contains no metered water content (i.e. "dry oil")

· Metered daily oil rates to date equal to or exceed 2016 values. Highest observed hourly rate equivalent to an implied daily rate of 352 barrels of oil per day ("bopd"). Corresponding metered solution gas volumes are up to an implied rate of 30,000 cu ft per day.

· Flow has not yet been optimised for maximum sustainable flow rates

· First tanker containing 214 barrels of dry oil exported to BP's Hamble oil terminal

· Initial analysis indicates well productivity unaffected by 2 year shut-in period since 2016

· Following a planned 24-hour shut in (i.e. pressure build-up test) the first of three planned Portland test sequences will commence

 

UK Oil & Gas Investments PLC (London AIM: UKOG) is pleased to announce that it has been informed by Horse Hill Developments Ltd ("HHDL"), the operator of the Horse Hill-1 ("HH-1") Kimmeridge and Portland oil discovery, in which UKOG holds a 32.435% beneficial interest along with licence PEDL137, that the initial well "clean-up" phase of the Portland extended well test ("EWT") programme has been completed according to plan. Over the past four days, the well has delivered a sustained dry oil and solution gas flow to surface via pump and natural flow.

 

Observed metered Portland flow rates to date are broadly equivalent to, or exceed, those recorded during the short duration 2016 test. The highest recorded hourly metered rate to date, equates to an implied daily rate of 352 bopd and was achieved using a 20/64" choke, a notably more restricted setting than the 64/64" choke used in 2016. Corresponding solution gas flows have been measured up to an implied rate of 30,000 cubic feet per day. Note that, to date, flow has not yet been optimised for maximum sustainable production rates, this will follow in the subsequent test sequences.

 

Several periods of sustained natural flow (i.e. flow to surface without pumping) have also been observed over the past few days, with the most productive period producing an implied daily dry oil rate of 228 bopd over a two-hour period.

 

Initial reservoir parameter analysis indicates that the Portland is performing very well compared to the productivity measured in 2016 prior to temporarily shutting in and suspending the well.

 

To date a total of 463 barrels of light sweet 36 API crude have been recovered to surface during the clean-up period, together with all 141 barrels of completion and kill fluids (i.e. saline water) used to suspend the well after the 2016 well test.

 

Forward EWT Plans

 

The well will now be shut in for a planned 24-hour pressure build-up test. Operations will then include further flow parameter optimisation, followed by the first of three planned flow sequences designed to assess whether the Portland oil pool contains a commercially viable volume of oil. The first test sequence will likely include an optimised maximum rate test, prior to choking back the well to provide the steady state flow conditions necessary to determine the Portland oil pool's connected oil volume. Note that in order to collect the required data during these steady state flow periods, rates will likely be below any future optimised production rates.

 

Testing of each of the Kimmeridge Limestone 4 ("KL4") and KL3 oil pools will follow completion of the Portland test sequence.

 

Stephen Sanderson, UKOG's Executive Chairman and Chief Executive, commented:

 

"Test results to date have exceeded our initial expectations given the length of time the well was shut-in since 2016. Although we are in the very early stages of our 150-day test campaign at Horse Hill, the signs to date are extremely positive for the Portland oil pool. The unexpected bonus of natural oil flow to the surface, without the use of a pump, gives us cause for further optimism regarding the Portland's overall commercial potential. It is important at this stage, however, to keep our expectations at a realistic level.

 

The Company looks forward to further positive results from the remaining Portland test sequences and then the testing of the two deeper and higher productivity Kimmeridge Limestone oil pools. Further updates will be made throughout the test campaign."

 

Extended Well Test ("EWT") Overview

As the 2016 short flow test campaign established commercially viable initial flow rates for each of the Portland, KL4 and KL3 zones, the 2018 EWT's prime goal is to confirm that the wellbore is connected to a commercially viable oil volume within one or more of the three zones.

 

The long-term reservoir performance data is also expected to provide the necessary data to enable, for the first time, Petroleum Resources Management System compliant Kimmeridge and Portland reserve figures to be estimated at Horse Hill.

 

Each test sequence will include a short, optimised rate test, together with a sequence of "choked back" (i.e. reduced) steady-state flow periods necessary to obtain the data required to determine the connected oil volume within each zone. A series of associated long pressure build up tests are also planned. Oil produced from the EWT will be sold on the "spot" oil market and any revenues will be utilised to offset overall testing costs.

 

Qualified Person's Statement

 

Stephen Sanderson, UKOG's Executive Chairman and Chief Executive, who has over 35 years of relevant experience in the oil industry, has approved the information contained in this announcement. Mr Sanderson is a Fellow of the Geological Society of London and is an active member of the American Association of Petroleum Geologists.

 

For further information, please contact:

 

UK Oil & Gas Investments PLC

Stephen Sanderson / Kiran Morzaria Tel: 01483 243450

 

WH Ireland (Nominated Adviser and Broker)

James Joyce / James Sinclair-Ford Tel: 020 7220 1666

 

Cenkos Securities PLC (Joint Broker)

Joe Nally / Neil McDonald Tel: 0207 397 8919

 

Public Relations

Brian Alexander / David Bick Tel: 01483 243450

 

 

UKOG Licence Interests

 

The Company has interests in the following UK licences:

Asset

Licence

UKOG's Interest

Licence Holder

Operator

Area (km2)

Status

Avington 1

PEDL070

5%

UKOG (GB) Limited

IGas Energy Plc

18.3

Field currently shut in

Broadford Bridge 3

PEDL234

100%

Kimmeridge Oil & Gas Limited 4

Kimmeridge Oil & Gas Limited 4

300.0

BB-1 & 1z completed, preparing two further planning applications

Holmwood 3

PEDL143

40%

UKOG

Europa Oil & Gas (Holdings) plc

91.8

Holmwood-1 exploration well planned in 2018

Horndean 1

PL211

10%

UKOG (GB) Limited

IGas Energy Plc

27.3

Field in stable production

Horse Hill 5

PEDL137

32.435%

Horse Hill Developments Ltd 

Horse Hill Developments Ltd 

99.3

Production tests and further appraisal well(s) scheduled for 2018

Horse Hill 5

PEDL246

32.435%

Horse Hill Developments Ltd

Horse Hill Developments Ltd 

43.6

As above

Isle of Wight (Onshore) 2, 3

PEDL331

65%

UKOG

UKOG

200.0

Preparing Arreton-3 oil discovery appraisal well planning submission

Markwells Wood 2

PEDL126

100%

UKOG (GB) Limited

UKOG (GB) Limited

11.2

Revised drilling and testing planning application underway

 

Notes:

 

1. Oil field currently in production.

2. Oil discovery pending development and/or appraisal drilling.

3. Exploration asset with drillable prospects and leads. PEDL234 contains the Broadford Bridge-1 and 1z discovery well, the extension of the Godley Bridge Portland gas discovery plus further exploration prospects.

4. UKOG has a 100% interest in Kimmeridge Oil & Gas Limited, which has a 100% interest in PEDL234.

5. Oil discovery with successful flow test in 3 zones, further long-term testing scheduled in 2018

6. UKOG has a direct 49.9% interest in HHDL, which has a 65% interest in PEDL137 and PEDL246.

 

 

The information contained within this announcement is deemed by the Company to constitute inside information under the Market Abuse Regulation (EU) No. 596/2014.

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
RSPLVLFFVDFBBBQ
Date   Source Headline
27th Jun 20147:00 amRNSHorse Hill Development Update
19th Jun 20144:39 pmRNSIssue of Equity and TVR
16th Jun 20147:00 amRNSUpdate on the Horse Hill-1 well
22nd May 20147:00 amRNSSeismic Acquisition, Tanzania
16th May 201410:00 amRNSUpdate on Horse Hill Investment
12th May 20143:13 pmRNSDirector's Dealings
8th May 20145:06 pmRNSDirector's Dealings
29th Apr 20141:19 pmRNSAudited Report and Accounts to 31 December 2013
27th Mar 20147:00 amRNSNtorya Gas-Condensate Development, Tanzania
4th Mar 20147:00 amRNSHorse Hill Investment Update
5th Feb 20147:00 amRNSUK Onshore Acquisition
3rd Feb 20147:00 amRNSAddendum to the Ruvuma PSA, Tanzania
19th Nov 20137:39 amRNSAppraisal of Ntorya
21st Oct 20137:00 amRNSInvestment in West Africa
4th Oct 20137:00 amRNSPossible Sale of Interests in Ontario
25th Sep 20137:00 amRNSUnaudited Interim Results
12th Sep 201311:38 amRNSChange of Accounting Date - replacement
11th Sep 20139:41 amRNSChange of accounting reference date
20th Aug 20139:28 amRNSUpdate Pan Minerals Acquisition
19th Aug 20137:00 amRNSUpdate, Tanzania
8th Jul 20137:00 amRNSRegulatory Approval
3rd Jun 201311:12 amRNSTotal Voting Rights
30th May 20137:00 amRNSUpdate Tanzania, Variation of PSA Terms
21st May 20139:47 amRNSShare Acquisition in West Africa
21st May 20137:00 amRNSProgress towards a Farm-out in Tanzania
15th May 20137:00 amRNSIssue of Equity and TVR
10th May 20131:46 pmRNSResult of AGM
9th May 20137:00 amRNSAcquisition in West Africa
17th Apr 20132:12 pmRNSNotice of Annual General Meeting
21st Mar 20137:00 amRNSUpdate, Farm-out in Tanzania
11th Mar 20132:56 pmRNSIssue of Equity and TVR
5th Mar 20131:37 pmRNSIssue of Equity and TVR - replacement
5th Mar 20137:00 amRNSIssue of Equity
4th Mar 20134:27 pmRNSUnaudited Interim Results
31st Jan 20132:55 pmRNSTotal Voting Rights
29th Jan 201311:12 amRNSUpdate, Farmout in Tanzania
11th Jan 20135:36 pmRNSIssue of Equity
9th Jan 201311:47 amRNSProgress with Farmout in Tanzania
31st Dec 20127:00 amRNSTotal Voting Rights
7th Dec 20125:32 pmRNSEmployee Benefit Trust
23rd Nov 20121:40 pmRNSIssue of Options
22nd Nov 20127:00 amRNSFarm-out Update, Ruvuma Basin, Tanzania
20th Nov 20127:00 amRNSAnnual Financial Report
25th Oct 20127:00 amRNSNew Corporate Presentation
24th Oct 201210:08 amRNSAnnouncement by Joint Venture Partner
18th Oct 20127:00 amRNSSolo Terminates Equity Line Facility
8th Oct 20127:00 amRNSIndustry Partner Sought
28th Aug 201210:54 amRNSReplacement: Production Update
28th Aug 20127:00 amRNSProduction Update
9th Aug 20127:00 amRNSIssue of Equity and TVR

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.