Operational Update, Canada

6 Mar 2012 07:00

RNS Number : 7195Y
Solo Oil Plc
06 March 2012
 



For Immediate Release, 7 am

6 March 2012

 

 

SOLO OIL PLC

("Solo")

Operational Update, Canada

 

Solo today announces a further update on activities in South Western Ontario, Canada operated by its Joint Venture partner Reef Resources Limited ("Reef").

 

Reef's announcement, to the Toronto exchange, reads:

 

March 5, 2012 - Calgary, Alberta - Reef Resources Ltd. ("Reef" or the "Company") reports the following developments and updates. The Company continues to make progress on all field activities associated with the ongoing development of the Ausable Gas Recycling and Enhanced Oil Recovery (EOR) project in Ontario.

 

·; The recent extremely wet weather in Ontario has caused delays to the pipelining between the existing South Airport gas well and the Ausable process facility. Operations will recommence once better ground conditions are available. Once the pipeline welding is completed the necessary road bores will be conducted. Gas and gas liquids from South Airport will be used for re-injection at Ausable once the pipeline is commissioned.

·; The reversal of the Union Gas meter, which was tentatively scheduled for February 27, 2012 has been delayed by Union Gas due to its internal resource planning. Union has given the Company a new date of March 19 for the meter reversal. Piping modifications at the facility will commence once the gas flow is reversed and will allow initiation of the gas re-injection scheme. The workover program for installation of a production packer in Ausable #1 well will coincide with meter reversal and will allow gas reinjection into the uppermost section of the Ausable reef.

·; A larger inlet separator has been purchased in Alberta and will be shipped to Ontario. The larger separator is designed to handle the greater oil, water and natural gas volumes associated with the venturi pumping system. A new high pressure surface venturi pump skid has also been designed and the Company is currently sourcing qualified fabricators. Facility upgrades associated with the larger separator and pump skid will accommodate production from all the Ausable and Airport wells.

·; After commissioning trials on the Ausable #5 venturi pump, a downhole valve requires replacement. A service rig is required to retrieve and re-run the down-hole assembly and it is planned to undertake this work in the next 14 days. Oil production rates from Ausable #5 and Ausable #1 have being hampered by mechanical issue's at the pump inlet level approximately 560 metres below surface. A gas-fired line heater is being installed to heat the high pressure water to service the venturi pumps on all wells in order to overcome this problem.

·; The cementing of the surface casing of the North Airport well has been successfully completed, Current depth is 280 meters and the rig is now drilling on to total depth estimated to be 608 meters.

 

Arnie Hansen, Reef President commented: "While progress at times has suffered from some minor delays, all the components of what we believe will be a very successful and productive program are now coming together at Ausable."

 

Neil Ritson, Solo Executive Director, commented; 

 

"Meeting the field production target of 500 bopd by end 2012 depends on successfully implementing a range of technical modifications at the Ausable Field, the import of gas from Union Gas and from the joint ventures own Airport reefs, and the full commissioning of the venturi pumping system successfully trialled in 2011 at Ausable #1. Good progress is being made on all the critical elements. In addition, the North Airport exploration well is anticipated to reach the reservoir in April and may give a further boost to the available equity gas for the EOR scheme."

 

Competent Person's Statement:

 

The information contained in this announcement has been reviewed and approved by Neil Ritson, Chief Executive Officer and Director for Solo Oil Plc who has 35 years of relevant experience in the oil industry. Mr. Ritson is a member of the Society of Petroleum Engineers, an Active Member of the American Association of Petroleum Geologists and is a Fellow of the Geological Society of London.

 

For further information:

 

Solo Oil plc

David Lenigas

Neil Ritson

+44 (0) 20 7440 0642

Beaumont Cornish Limited

Nominated Adviser and Joint Broker

Roland Cornish

+44 (0) 20 7628 3396

Old Park Lane Capital Plc

Joint Broker

Michael Parnes

Luca Tenuta

 

Shore Capital

Joint Broker

Pascal Keane

Jerry Keen (Corporate Broker)

 

Pelham Bell Pottinger

Public Relations

Mark Antelme

 Henry Lerwill

 

+44(0) 20 7493 8188

 

 

 

 

 

 

+44 (0) 20 7408 4090

 

 

 

 

+44 (0) 20 7861 3232

 

Glossary:

 

boed - barrels of oil equivalent per day

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCUGURWWUPPGQA
Date   Source Headline
26th Aug 20157:00 amRNSTanzania Update
12th Aug 20151:25 pmRNSResult of AGM
18th Jun 20157:00 amRNSNutech Report on Horse Hill
11th Jun 20153:11 pmRNSAudited Report and Accounts to 31 December 2014
5th Jun 20157:30 amRNSRestoration - Solo Oil Plc
5th Jun 20157:00 amRNSHorse Hill-1 Well and Restoration of Trading
4th Jun 20157:30 amRNSSuspension - Solo Oil plc
4th Jun 20157:30 amRNSAnnouncement re temporary suspension
14th May 20157:00 amRNSTanzanian Assets CPR
13th May 20152:00 pmRNSHorse Hill Licence Extension
11th May 20157:00 amRNSUpgrade to Horse Hill
6th May 20157:01 amRNSIssue of Shares and TVR
29th Apr 20157:00 amRNSAcquisition of Buri Africa shares
28th Apr 20157:00 amRNSHorse Hill Licences
14th Apr 20153:38 pmRNSIssue of Equity and TVR
9th Apr 20157:00 amRNSSignificant upgrade to Horse Hill, Weald Basin
1st Apr 20157:00 amRNSUpdate Kiliwani North Development, Tanzania
18th Mar 20157:00 amRNSUpdate on Horse Hill discovery, UK Weald Basin
27th Feb 20155:24 pmRNSTotal Voting Rights
25th Feb 20157:00 amRNSKiliwani North Development Licence Acquisition
18th Feb 20158:26 amRNSUpdate - Kiliwani North Gas Field, Tanzania
6th Feb 20157:00 amRNSUpdate - Kiliwani North Gas Field, Tanzania
4th Feb 20157:00 amRNSIssue of Equity and TVR
3rd Feb 20157:00 amRNSAcquisition of Kiliwani North
18th Dec 20147:00 amRNSUpdate - Ruvuma PSC, Tanzania
17th Dec 201412:35 pmRNSHorse Hill-1 Oil Discovery Update
17th Dec 20147:00 amRNSUpdate on Tanzania Acquisition
17th Dec 20147:00 amRNSKNDL - Partial Disposal Update
12th Nov 20147:00 amRNSUpdate - acquisition of interest in Tanzania
5th Nov 20148:00 amRNSHorse Hill-1 Provisional Results at TD
31st Oct 201411:46 amRNSTotal Voting Rights
29th Oct 20147:00 amRNSApplication in the UK 14th Round
24th Oct 20147:00 amRNSPortland Oil Discovery, Horse Hill-1
17th Oct 20143:30 pmRNSBoard Changes
16th Oct 201411:30 amRNSDrilling Update, Horse Hill-1, Weald Basin UK
14th Oct 20147:00 amRNSAcquisition of interest in Kiliwani Gas Field
6th Oct 20147:00 amRNSDrilling Report
29th Sep 20143:57 pmRNSUnaudited Interim Results
29th Sep 201411:00 amRNSDrilling Update, Horse Hill-1, Weald Basin UK
25th Sep 20147:00 amRNS$5m debt facility and £2.26m placing
24th Sep 20141:00 pmRNSDrilling Update, Horse Hill-1, Weald Basin UK
18th Sep 20142:00 pmRNSUpdate, Horse Hill-1, Weald Basin UK
11th Sep 20147:00 amRNSRuvuma Basin update
4th Sep 20142:00 pmRNSIncreased Acreage Holdings, Weald Basin UK
4th Sep 201410:43 amRNSUpgraded Ntorya-1 reserves, Tanzania
3rd Sep 20147:00 amRNSDrilling Commenced at Horse Hill-1
6th Aug 201412:00 pmRNSUpdate on Horse Hill
21st Jul 20147:00 amRNSUpdate on Horse Hill Prospect, UK
30th Jun 20142:14 pmRNSTotal Voting Rights
27th Jun 20145:26 pmRNSResult of AGM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.