If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSEY.L Regulatory News (SEY)

  • There is currently no data for SEY

Drilling Report

17 Jan 2006 07:00

Hardman Resources Limited17 January 2006 STOCK EXCHANGE / MEDIA RELEASE RELEASE DATE: 17 January 2006 AUSTRALIAN CONTACT: Peter Thomas Hardman Resources Ltd +61 8 9261 7600 LONDON CONTACT: Patrick Handley Brunswick Group +44 207 404 5959 RE: HARDMAN DRILLING PROGRAMME WEEKLY PROGRESS REPORT Hardman Resources Limited ("Hardman") provides the following progress report onits drilling activities: Uganda: Block 2 - Mputa-1 Wildcat Since the last report on 10 January the rig completed repairs and drilled thewell to total depth of 1,186 metres. The well encountered oil shows over twointervals within a deep objective and as of midnight on 16 January oil sampleshave been recovered from the upper interval, a sand of approximately 10 metresgross thickness at 965 metres. The sampling and pressure testing programme iscontinuing. Upon completion of the Mputa-1 exploration well operations, the rig will move tothe Waraga-1 location approximately 19 kilometres to the north-east of Mputa-1. Mputa-1 targeted a structural prospect defined by the 2005 seismic survey withpotential multiple objectives and in an area with surface oil seeps. Theresults of Mputa-1 provide confirmation of a working hydrocarbon system andconsiderable support for further evaluation of both this discovery and thesurrounding area where a number of other good prospects and leads have beenidentified. In this wildcat well the reservoir sands were poorer than expectedfor some of the objective levels but there is significant encouragement that thewell and seismic data can provide a better understanding of reservoir sanddistribution and considerably reduce the risk of other prospects. Further workwill be required before any comment can be made on the size or commercialsignificance of this discovery and the potential for future resource in thearea. The well location is 220 kilometres north-west of the capital Kampala andonshore 8 kilometres from Lake Albert. The location is 60 kilometres south-westof the Butiaba Waki-1 well (drilled in 1938) and 87 kilometres north-east of theTuraco exploration wells drilled by Heritage in 2002-2004. Hardman's CEO Mr Simon Potter commented: "This is a very encouraging result - even though there is still significantuncertainty about the size of Mputa and whether it has commercial potential,this well has confirmed the existence of a working petroleum system. It has beenan important step in reducing exploration risk in the basin and we are lookingforward to Waraga-1, the next well in the programme." Equities in Block 2 are: Block 2Hardman Petroleum Africa Pty Ltd (Operator) 50.0%Tullow Oil 50.0% Mauritania: PSC Area B, Block 4 - Dore-1 Exploration Well Since the last report on 12 January the 'Stena Tay' drilling rig completedoperations on the Zoule-1 well and moved to the Dore-1 exploration well locationin PSC B, Block 4. At midnight on 16 January the 'Stena Tay' was preparing tospud the well. The Dore prospect is located approximately 19 kilometres east of the Tiof field,and 30 kilometres north of the Chinguetti field in water depth of approximately386 metres. The well will be drilled to a proposed total depth of 2,388 metresand will target Oligocene aged submarine channel/turbidite sands as well asencountering the updip extension of the Tiof Miocene canyon system. Equities in PSC B are: PSC BWoodside Mauritania Pty Ltd (operator) 53.846%Hardman Chinguetti Production Pty Ltd 21.6%BG Group 11.63%Premier Oil Mauritania B Limited 9.231%ROC Oil Company 3.693% All reported depths (except water depth) are referenced to the rig rotary table(RT). Hydrocarbon shows will be only be reported after all required logs havebeen run and evaluated, although Hardman will release weekly updates on theexploration drilling campaign. Times and dates for Mauritania wells refer to GMT (Mauritania time), 8 hoursbehind Western Standard Time, Perth. Uganda time is GMT+3, 5 hours behindWestern Standard Time, Perth. PETER THOMASCHIEF FINANCIAL OFFICER Note: In accordance with Australian Stock Exchange Limited listing requirements,the geological information supplied in this report has been based on informationprovided by geologists who have had in excess of five years experience in theirfield of activity. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
9th Jun 20171:00 pmRNSOdewayne, Repubilc of Somaliland
25th Apr 20171:54 pmRNSResult of AGM
25th Apr 20177:00 amRNSInterim Management Statement
3rd Apr 20177:00 amRNSOdewayne, Repubilc of Somaliland
30th Mar 201711:19 amRNSPosting of Annual Report and Notice of AGM
20th Mar 20177:00 amRNSAnnual results for the year ended 31 December 2016
10th Feb 201710:10 amRNSHolding(s) in Company
6th Feb 20174:35 pmRNSPrice Monitoring Extension
20th Jan 20177:00 amRNSBoard Changes and Director Appointments
5th Jan 20179:30 amRNSDelayed Notifications of Major Interest in Shares
14th Nov 20167:00 amRNSCorporate Update
14th Nov 20167:00 amRNSInterim Management Statement
13th Oct 20164:00 pmRNSBoard Changes
5th Aug 20169:23 amRNSOdewayne, Republic of Somaliland
5th Aug 20167:00 amRNSNtem Concession, Cameroon
2nd Aug 20164:40 pmRNSSecond Price Monitoring Extn
2nd Aug 20164:35 pmRNSPrice Monitoring Extension
28th Jul 20167:00 amRNSResults for the six months ending 30 June 2016
11th May 20167:00 amRNSBoard Changes and Director Appointment
9th May 20167:00 amRNSCompletion of Withdrawal from Ambilobe, Madagascar
28th Apr 20167:00 amRNSWithdrawal from Ambilobe, Madagascar
25th Apr 20164:37 pmRNSAGM Results
25th Apr 201610:21 amRNSInterim Management Statement
4th Apr 20167:00 amRNSPublication of Report & Financial Statements 2015
16th Mar 20167:00 amRNSWithdrawal from Block C-3, Mauritania
14th Mar 20167:00 amRNSAnnual Financial Report
29th Jan 201611:37 amRNSWithdrawal from Block C-3, Mauritania
21st Dec 20154:40 pmRNSSecond Price Monitoring Extn
21st Dec 20154:35 pmRNSPrice Monitoring Extension
17th Dec 201511:39 amRNSHolding(s) in Company
10th Dec 201512:20 pmRNSHolding(s) in Company
1st Dec 20157:00 amRNSNtem Concession, Cameroon
30th Nov 20157:00 amRNSCompletion of Block C-10 interest acquisition
9th Nov 20157:00 amRNSInterim Management Statement
30th Jul 20153:42 pmRNSCompletion of acquisition of interest in Block C-3
27th Jul 20157:00 amRNSResults for the six months ending 30 June 2015
3rd Jun 20157:00 amRNSAcquisition of interest in Block C-10, Mauritania
2nd Jun 20157:00 amRNSAmbilobe Block, Madagascar
7th May 20157:00 amRNSAmpasindava Block, Madagascar
29th Apr 201512:10 pmRNSAGM Results
29th Apr 201510:05 amRNSInterim Management Statement
27th Apr 20157:00 amRNSUpdate for Ambilobe Block (Madagascar)
23rd Apr 20157:00 amRNSNtem Concession, Cameroon
9th Apr 20157:00 amRNSNtem Concession, Cameroon
8th Apr 20159:00 amRNSPublication of Report & Financial Statements 2014
26th Mar 20157:00 amRNSAnnual Financial Report
23rd Mar 20158:22 amRNSBoard and Management Appointment
10th Mar 20157:03 amRNSDirectorate Change
17th Feb 20157:00 amRNSNtem Concession Cameroon
16th Feb 20159:00 amRNSUpdate for Ambilobe and Ampasindava Blocks

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.