Less Ads, More Data, More Tools Register for FREE

Pin to quick picksRGM.L Regulatory News (RGM)

  • There is currently no data for RGM

Direct Nickel - Demonstration Programme Update

17 Feb 2014 11:59

RNS Number : 2300A
Regency Mines PLC
17 February 2014
 



REGENCY MINES PLC

("Regency" or the "Company")

Direct Nickel Limited - Nickel Production Demonstration Programme declared successful

17 February 2014

Regency Mines Plc ("Regency" or the "Company"), the mining exploration and mineral investment company with interests in nickel and other minerals in Australia, Papua New Guinea and Sudan, reports, further to the announcements on 17 January 2014 and 6 December 2013, that its partner Direct Nickel Ltd ("DNi") has today announced the successful outcome of the Demonstration Programme on the DNi Process carried out between January and December 2013 at the DNi test plant in Perth, WA.

Highlights

The recently received process validation report confirms:

· Chemistry that regenerates and recycles reagents within the process

· Ability to treat limonite and saprolite ores and blends without loss in nickel recovery

· Low process intensity not requiring high temperatures or pressures

· Off-the-shelf equipment with a well-known design and scalable methodology

· No exotic materials of construction

· Low volume, benign tailings that can be disposed as landfill

· Valuable by-products of MgO and hematite

and a key metric has been confirmed:

• Processing operating costs of US$2.00 to $3.00/lb (before by-product credits)

DNi's announcement also confirms:

· Commitment to commercialisation of the new process technology

· Feasibility Study under way at Buli, Halmahera, in partnership with Indonesia's largest nickel producer ANTAM

· Planned DNi Process commercial plant to produce up to 10-20,000 tonnes per annum of nickel in concentrate

Takeaways of the Demonstration Programme

Key takeaways from the programme were:

· The DNi Process has proved to be simple and safe to operate on a continuous basis

· Metal recoveries for pay metals Ni, Co, Fe and Mg match laboratory results with +90% for Ni

· +95% recycling of nitric acid achieved

· High standards of occupational health, safety and environment demonstrated

· A working, accurate process model has been developed and verified

· Commercially available 304 stainless steel remains the construction material of choice

· Water and energy balances have been confirmed

· A simplified flowsheet has resulted in reduced processing capital costs

· Processing operating costs of US$2.00 to $3.00/lb (before credits) have been confirmed as feasible for some markets such as Indonesia

· MHP (mixed hydroxide intermediate product) grades of 32%Ni were achieved, with scope to further improve identified.

Russell Debney, DNi CEO, states: "The completion of the Nickel Production Demonstration Programme positions DNi for our first commercial plant. As importantly, its success will increase awareness of the availability of a commercially viable solution in the DNi Process to access and process nickel laterite resources."

He states: "Some of the ore for this demonstration was sourced from ANTAM's Buli operation. For the ores tested, the Demonstration Programme has shown the DNi Process has very high recoveries of nickel, and other valuable by-products such as cobalt, hematite and magnesium oxide,"

Background on DNi, ANTAM, and the DNi Process

DNi (ASX:DIR), a company in which Regency is a 7% shareholder, is the developer of the DNi Process and is the Company's joint venture partner in the Mambare nickel-cobalt laterite project in Oro Province, Papua New Guinea; a project which has a license for the DNi Process.

PT ANTAM (Persero) Tbk (IDX:ANTM; ASX:ATM) ("ANTAM") is a diversified mining company and Indonesia's largest nickel miner and operates ferronickel processing facilities in Sulawesi. Co-operation agreements between ANTAM and DNi joint venture subsidiary PT DNi were signed with ANTAM in 2012 and 2013.

The DNi Process is a hydrometallurgical process for the treatment of nickel laterites. It is designed to operate with tank leaching at atmospheric pressure, and to treat both limonite and saprolite ores with a single flowsheet. The DNi Process recycles its reagents, offer high cobalt and nickel recoveries with short residence time, and enables the treatment of nickel laterites with industry-competitive capital and operating costs. The DNi Process has the potential to add materially to the prospective value of world nickel laterite resources which receive access to the DNi Process.

The DNi Process has been developed over the past seven years and has been demonstrated over the last year at a test plant facility located in the CSIRO's Mineral Research Centre in Perth at a scale of 1 ton of ore per day. The test plant programme was completed in December 2013.

Comment

Regency Chairman Andrew Bell comments: "These long-awaited and much anticipated results are of signal importance. The advantages, in both process and economics, of the DNi Process need no longer be spoken of as hypothetical or potential, but can be described as actual.

This development comes at an opportune time for countries that wish to achieve greater value from nickel projects. Indonesia for one has banned nickel ore exports and from 2014 requires in-country processing, and others may soon follow leading to significant opportunities for DNi processing plants to be established worldwide. "

The full announcement is available to read at:

http://www.asx.com.au/asxpdf/20140217/pdf/42mrs9bvh7dbyg.pdf 

Enquiries:

Andrew Bell 020 7747 9960 or 07766 474849

Chairman Regency Mines plc

 

Colin Aaronson/David Hignell 020 7383 5100

NOMAD Grant Thornton UK LLP

 

Nick Emerson 01483 413500

 

Guy Wheatley 02073828416

 

Rupert Trefgarne 02031288817

 

Natasha Walton 020 7747 9960

Broker SI Capital Ltd

 

Joint Broker Beaufort Securities Ltd

 

Media Relations MHP Communications

 

Investor Relations Regency Mines plc

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCSFWFFWFLSEIE
Date   Source Headline
28th Aug 20093:00 pmRNSTotal Voting Rights
28th Aug 20092:22 pmRNSHolding(s) in Company
27th Aug 20097:00 amRNSDirectorate Change
24th Aug 20097:00 amRNSDirector's Dealing and Exercise of Options
19th Aug 20097:06 amRNSMemorandum of Understanding
14th Aug 20094:28 pmRNSUpdate
10th Aug 200911:08 amRNSDrilling Report
31st Jul 20093:00 pmRNSTotal Voting Rights
31st Jul 20092:22 pmRNSBotue-Mambare Project Update
13th Jul 20097:00 amRNSOption to Acquire NiS Tenements
29th May 20093:50 pmRNSDirectorate Change
29th May 20091:22 pmRNSHolding(s) in Company
29th May 20091:00 pmRNSTotal Voting Rights
22nd May 20097:00 amRNSIssue of Equity
15th May 200911:49 amRNSOption to Acquire/Exploration update
31st Mar 200911:10 amRNSTotal Voting Rights
31st Mar 200910:49 amRNSHalf Yearly Report
12th Mar 20092:04 pmRNSHolding(s) in Company
5th Mar 200911:31 amRNSIssue of Equity
2nd Feb 200912:33 pmRNSGrant of Options
27th Jan 200912:15 pmRNSResult of AGM
5th Jan 20099:17 amRNSHolding(s) in Company
2nd Jan 200911:00 amRNSResult of AGM
24th Dec 200810:05 amRNSFinal Results
25th Nov 20084:29 pmRNSExploration Update
11th Nov 20087:00 amRNSIssue of Equity
24th Oct 200812:38 pmRNSExploration Update
15th Oct 200810:46 amRNSHolding(s) in Company
2nd Oct 20089:24 amRNSHolding(s) in Company
2nd Oct 20089:18 amRNSHolding(s) in Company
30th Sep 20083:00 pmRNSTotal Voting Rights
26th Sep 20089:53 amRNSHolding(s) in Company
22nd Sep 20083:37 pmRNSIncreased Shareholding
19th Sep 20087:00 amRNSIssue of Equity
4th Sep 20082:43 pmRNSExploration Update
8th Aug 20082:01 pmRNSExploration Update - Mambare
30th Jul 20083:18 pmRNSTotal Voting Rights
25th Jul 200810:36 amRNSExploration Update - Mambare
8th Jul 20084:43 pmRNSTrading Update & Option Exerc
21st May 200812:01 pmRNSHolding(s) in Company
30th Apr 20081:15 pmRNSTotal Voting Rights
25th Apr 200810:59 amRNSExploration Update
24th Apr 20087:00 amRNSIssue of Equity
14th Apr 200811:22 amRNSExploration Update
31st Mar 20087:01 amRNSInterim Results
15th Feb 200812:25 pmRNSHolding(s) in Company
31st Jan 20083:00 pmRNSTotal Voting Rights
29th Jan 20081:58 pmRNSHolding(s) in Company
25th Jan 200811:28 amRNSHolding(s) in Company
17th Jan 200811:45 amRNSIssue of Equity

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.