Re: Carnegie Activities Update

8 Feb 2011 09:19

RNS Number : 8535A
Renewable Energy Holdings plc
08 February 2011
 



8 February 2011

 

Renewable Energy Holdings plc

("REH" or the "Company")

 

Re: Carnegie Commercial Scale Unit Activities Update

 

Please find below an announcement released on 8 February 2011 by Carnegie Wave Energy Limited, in which REH holds 232,600,000 fully paid ordinary shares, representing 27.08% of the entire issued share capital:

 

"8th February 2011

 

Commercial Scale Unit Activities Update

 

·; Onshore hydraulic test rig successfully commissioned

·; Hydraulic module delivered and connected to CETO pump

·; Final testing and delivery of pump-to-mooring attachment

 

Carnegie Wave Energy Limited (ASX:CWE) is pleased to announce that the hydraulic energy module for its commercial scale demonstration unit has been delivered to Carnegie's Fremantle Wave Energy facility.

 

The hydraulic module is designed to sit on the sea floor adjacent to the CETO pump and imitate a wave energy plant. The key functions are to regulate the inlet and outlet pressures of the pump and to dissipate the generated energy by way of a heat exchanger.

 

The hydraulic module is only required for the stand-alone CETO 3 unit and allows an autonomous CETO unit to operate offshore without requiring the installation of piping to shore and onshore generators.

 

The delivery of the hydraulic module and its connection to the CETO pump allows the onshore test programme to be completed over the coming weeks. The test programme allows the system's performance to be characterised by cycling the pump with a temporary actuator. The test will also reduce risk and uncertainty prior to the subsequent installation and operation at Carnegie's test site off Garden Island in Western Australia.

 

The test program involves stroking the pump under various loads and velocities using sinusoidal profiles that simulate wave conditions. Instrumentation mounted on the pump and hydraulic module will record the system performance during both onshore and offshore testing. The pump to mooring attachment has also been delivered to Carnegie from French manufacturers Techlam. Techlam specialise in elastomeric components typically used in submarine and offshore applications whose requirements are not dissimilar to those of CETO. Instrumentation required for load measurement has been fitted locally and successfully tested and calibrated. The attachment is now ready for mobilisation for offshore testing.

 

Carnegie's Perth Wave Energy Project is located offshore Fremantle in the ocean between Garden Island and Five Fathom Bank at a depth of approximately 25 metres. Upon completion, it will be Australia's first commercial scale wave energy project.

 

The primary aim of the project is to demonstrate the CETO technology in commercial operation. The project site could also be a base for a desalination pilot project utilizing Carnegie's CETO technology.

 

About CETO

The CETO system distinguishes itself from other wave energy devices by operating out of sight and being anchored to the ocean floor. An array of submerged buoys is tethered to seabed pump units. The buoys move in harmony with the motion of the passing waves, driving the pumps which in turn pressurise water that is delivered ashore via a pipeline.

 

High-pressure water is used to drive hydroelectric turbines, generating zero-emission electricity. The high-pressure water can also be used to supply a reverse osmosis desalination plant, replacing greenhouse gas emitting electrically driven pumps usually required for such plants.

 

CETO Technology characteristics include:

·; CETO converts wave energy into zero-emission electricity and desalinated water

·; CETO is environmentally friendly, has no visual impact and attracts marine life

·; CETO is fully submerged in deep water away from popular surf breaks

 

About Carnegie

Carnegie Wave Energy Limited is an Australian, ASX-listed (CWE) wave energy technology developer. Carnegie is the owner and developer of the CETO Wave Energy Technology intellectual property.

 

Ends

 

For further information, please contact:

 

Renewable Energy Holdings plc

Mike Proffitt, Chief Executive

 

Tel: +44 (0) 16 2464 1199

Strand Hanson Limited

Rory Murphy / James Spinney

 

Tel: +44 (0) 20 7409 3494

Novus Capital Markets Ltd

Charles Goodfellow

 

Tel: +44 (0) 20 7107 1872

Financial Dynamics

Billy Clegg / Ed Westropp / Alex Beagley

Tel: +44 (0) 20 7831 3113

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCGCGDDRBGBGBI
Date   Source Headline
1st Feb 20107:00 amRNSRe: Carnegie announcement
27th Jan 20107:00 amRNSTrading Update
22nd Jan 20107:00 amRNSStrategic Disposal of Landfill Gas Asset
10th Dec 20097:00 amRNSCarnegie Wave Energy Limited update
3rd Nov 20097:00 amRNSStatement re Shareholder Circular Correction
30th Oct 20096:32 pmRNSShareholder Circular: Correction
26th Oct 20097:00 amRNSChange of Advisers
16th Oct 20099:13 amRNSHolding(s) in Company
12th Oct 20097:00 amRNSCETO: Completion of disposal
30th Sep 20097:00 amRNSInterim Results
4th Sep 20098:30 amRNSCETO: Completion of disposal
1st Sep 20097:00 amRNSBoard Appointments
28th Aug 200912:00 pmRNSTotal Voting Rights
25th Aug 200911:03 amRNSHolding(s) in Company
19th Aug 200910:20 amRNSHolding(s) in Company
19th Aug 200910:18 amRNSHolding(s) in Company
14th Aug 20097:00 amRNSDirector/PDMR Shareholding
6th Aug 200911:46 amRNSAcquisition
4th Aug 200911:33 amRNSCETO: Key acquisition conditions satisfied
31st Jul 20094:53 pmRNSPlacing
14th Jul 20094:59 pmRNSCETO Update
1st Jul 200910:50 amRNSResult of AGM
23rd Jun 20099:56 amRNSUpdate re Solar Energy and Poland Wind
18th Jun 200911:43 amRNSPosting of Accounts
29th May 200912:41 pmRNSHolding(s) in Company
29th May 20097:00 amRNSCETO Update and Solar Energy Letter of Intent
28th May 200912:56 pmRNSHolding(s) in Company
20th May 20093:49 pmRNSWind operations update and CETO revenue
11th May 20097:00 amRNSSale of wave energy Intellectual Property
9th Mar 20097:00 amRNSFinal Results
27th Feb 20097:00 amRNSUpdate on trading and CETO Bermuda project
22nd Jan 20097:00 amRNSBoard appointment
20th Jan 20097:00 amRNSCETO Update
22nd Dec 200812:27 pmRNSDirector Options
15th Dec 20087:00 amRNSCETO site - Vancouver, Canada
2nd Dec 20084:07 pmRNSHolding(s) in Company
1st Dec 20087:00 amRNSPolish Wind Farm Agreement
20th Nov 200812:13 pmRNSDirectorate Change
11th Nov 20089:33 amRNSDirector/PDMR Shareholding
6th Nov 20088:53 amRNSDirector/PDMR Shareholding
5th Nov 20087:00 amRNSWelsh wind farm agreement
23rd Oct 20081:39 pmRNSHolding(s) in Company
29th Sep 20084:31 pmRNSHolding(s) in Company
29th Sep 20084:31 pmRNSHolding(s) in Company
3rd Sep 20087:00 amRNSInterim Results
28th Aug 20087:00 amRNSCETO Update
20th Aug 200812:53 pmRNSNotice of Results
7th Aug 20084:23 pmRNSHolding(s) in Company
5th Aug 20087:00 amRNSMOU- Wave Farms in Bermuda
4th Aug 20083:11 pmRNSDirectors' Disclosure Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.