George Frangeskides, Chairman at ALBA, explains why the Pilbara Lithium option ‘was too good to miss’. Watch the video here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPOLY.L Regulatory News (POLY)

  • There is currently no data for POLY

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Polymetal: Ore Reserves increase at Kyzyl

9 Nov 2020 07:00

Polymetal International plc (POLY) Polymetal: Ore Reserves increase at Kyzyl 09-Nov-2020 / 10:00 MSK Dissemination of a Regulatory Announcement, transmitted by EQS Group. The issuer is solely responsible for the content of this announcement.


Release time

IMMEDIATE LSE, MOEX, AIX: POLY / ADR: AUCOY

Date

09 November 2020

 

 

Polymetal International plc

Ore Reserves increase at Kyzyl

Polymetal announces a 25% increase in Ore Reserves at Kyzyl to 10.3 Moz of gold following initial reserve estimate at East Bakyrchik of 2.2 Moz of gold.

"A substantial reserve addition at East Bakyrchik extends the life-of-mine at Kyzyl to 30 years", said Vitaly Nesis, Group CEO of Polymetal. "Importantly, open-pit mining will now continue till 2036".

HIGHLIGHTS

The initial JORC-compliant Ore Reserve estimate for East Bakyrchik (Zone 2 of Kyzyl) as at 1 April 2020 comprises 18.8 Mt of ore at an average grade of 3.7 g/t containing 2.2 Moz of gold, roughly 80% of which are underground. Total Kyzyl Ore Reserves now stand at 59.3 Mt of ore with an average grade of 5.4 g/t containing 10.3 Moz of gold. This represents a 25% increase compared with the estimate at the end of 2019. Open-pit reserves increased by 9% to 4.3 Moz of gold contained at an average grade of 4.9 g/t, underground reserves were up 40% to 6.0 Moz at an average grade of 5.8 g/t. East Bakyrchik has added 5 years to the total Kyzyl life of mine (2050), while life-of-mine (LOM) for the open pit has extended by 6 years (to 2036). East Bakyrchik open-pit LOM average strip ratio is 27 t/t. The new mining schedule assumes an increase in the capacity of the Kyzyl processing plant from 2.0 Mtpa to 2.2 Mtpa in 2022. East Bakyrchik Ore Reserve estimate incorporates data from the exploration campaign in 2015-2020 including 29.9 km of drilling (168 diamond drill holes). Total Kyzyl Mineral Resources (additional to Ore Reserves) amount to 15.6 Mt of ore with an average grade of 4.0 g/t representing 2.0 Moz of gold contained.

Ore Reserves (Proved + Probable) changes

Ore Reserves

Category

01.01.2020(Bakyrchik)

01.04.2020(Bakyrchik &

 East Bakyrchik)

Change, %

Open pit[1]

Tonnage, Mt

21.8

27.3

+25%

Au grade, g/t

5.7

4.9

-13%

Au content, Moz

4.0

4.3

+9%

 

 

 

 

 

Underground

Tonnage, Mt

18.8

32.1

+71%

Au grade, g/t

7.1

5.8

-18%

Au content, Moz

4.3

6.0

+40%

 

 

 

 

 

Total

Tonnage, Mt

40.6

59.3

+46%

Au grade, g/t

6.3

5.4

-15%

Au content, Moz

8.2

10.3

+25%

 

 

 

ORE RESERVES

The Ore Reserve estimate is reported in accordance with the JORC Code (2012) and was prepared by Polymetal using a gold price of US$ 1,200/oz. For the Bakyrchik open pit and underground the previous estimate was performed as at 1 July 2019, the updated estimate was prepared as at 1 April 2020 and accounts for the pit extension and depletion. A cut-off grade of 0.8 g/t of gold was applied for the open pit and 3.0 g/t for the underground. East Bakyrchik initial Ore Reserve estimate was performed as at 1 April 2020. A cut-off grade for recovered gold of 0.6 g/t was applied for the open pit and 2.0 g/t for the underground, the reserves were estimated on the basis of variable recovery value for each of the blocks generated.

Kyzyl Ore Reserve estimate

Ore Reserves

Tonnage,

Gold grade,

Gold content,

Mt

g/t

Moz

Proved

 

 

 

Open-pit (Bakyrchik)

1.4

7.4

0.3

Stockpiles

0.4

5.2

0.1

Total Proved

1.8

6.9

0.4

 

 

 

 

Probable

 

 

 

Open-pit

25.5

4.8

3.9

Bakyrchik

20.4

5.3

3.5

East Bakyrchik

5.0

2.6

0.4

Underground

32.1

5.8

6.0

Bakyrchik

18.4

7.1

4.2

East Bakyrchik

13.7

4.1

1.8

Total Probable

57.5

5.3

9.9

 

 

 

 

Proved + Probable

 

 

 

Open-pit

26.9

4.9

4.2

Bakyrchik

21.8

5.4

3.8

East Bakyrchik

5.0

2.6

0.4

Underground

32.1

5.8

6.0

Bakyrchik

18.4

7.1

4.2

East Bakyrchik

13.7

4.1

1.8

Stockpiles

0.4

5.2

0.1

Total Proved+Probable

59.3

5.4

10.3

Notes: discrepancies in calculations are due to rounding

 

 

MINERAL RESOURCES

The Mineral Resources estimate is reported in accordance with the JORC Code (2012) and was prepared by Polymetal using a gold price of US$ 1,200/oz. For the Bakyrchik open pit and underground the previous estimate was performed as at 1 July 2019, the updated estimate was prepared as at 1 April 2020 and accounts for the pit extension and depletion. Cut-off grades of 0.8 g/t and 3.0 g/t of gold were applied for the open and the underground, respectively. East Bakyrchik updated Mineral Resource estimate was performed as at 1 April 2020. A cut-off grade for recovered gold of 0.6 g/t was applied for the open pit and 2.0 g/t for the underground, the resources were estimated on the basis of variable recovery for each of the blocks generated. The Mineral Resource estimate for Bolshevik was prepared by Polymetal as at 1 January 2019, revised estimate was not performed due to lack of material changes. Cut-off grades for the open pit and the underground are 1.0 g/t and 3.3 g/t of gold, respectively.

Kyzyl Additional Mineral Resource estimate

Mineral Resources (additional to Ore Reserves)

Tonnage,

Gold grade,

Gold content,

Mt

g/t

Moz

Measured

Open-pit (Bakyrchik)

0.0

2.5

0.003

Total Measured

0.0

2.5

0.003

 

 

 

 

Indicated

Open-pit

1.8

2.2

0.1

Bakyrchik

0.7

2.2

0.1

East Bakyrchik

0.4

1.2

0.0

Bolshevik

0.7

2.9

0.1

Underground

5.0

4.5

0.7

Bakyrchik

2.1

4.8

0.3

East Bakyrchik

2.5

4.0

0.3

Bolshevik

0.4

6.4

0.1

Total Indicated

6.8

3.9

0.9

 

 

 

 

Measured + Indicated

 

 

 

Open-pit

1.9

2.2

0.1

Bakyrchik

0.8

2.2

0.1

East Bakyrchik

0.4

1.2

0.0

Bolshevik

0.7

2.9

0.1

Underground

5.0

4.5

0.7

Bakyrchik

2.1

4.8

0.3

East Bakyrchik

2.5

4.0

0.3

Bolshevik

0.4

6.4

0.1

Total Measured + Indicated

6.8

3.9

0.9

 

 

 

 

Inferred

 

 

 

Open-pit

3.9

2.3

0.3

Bakyrchik

0.4

2.0

0.02

Bolshevik

3.5

2.3

0.3

Underground

4.9

5.6

0.9

Bakyrchik

2.4

6.4

0.5

East Bakyrchik

0.6

3.7

0.1

Bolshevik

1.9

5.2

0.3

Total Inferred

8.7

4.1

1.2

 

Measured + Indicated + Inferred

 

 

 

Open-pit

5.7

2.3

0.4

Bakyrchik

1.2

2.1

0.1

East Bakyrchik

0.4

1.2

0.02

Bolshevik

4.2

2.4

0.3

Underground

9.8

5.1

1.6

Bakyrchik

4.5

5.7

0.8

East Bakyrchik

3.1

4.0

0.4

Bolshevik

2.2

5.4

0.4

Total Measured + Indicated + Inferred

15.6

4.0

2.0

Notes: discrepancies in calculations are due to rounding.

Competent persons

This estimate was prepared by employees of JSC Polymetal Management Company, JSC Polymetal Engineering and subsidiaries of the Company, led by Mr. Valery Tsyplakov.

Mr. Tsyplakov is employed full-time as the Managing Director of JSC Polymetal Engineering and has 19 years' experience in gold, silver and polymetallic mining. Being a Fellow of the Institute of Materials, Minerals & Mining (FIMMM), London, he is a Competent Person under the JORC Code.

Listed below are other Competent Persons employed by the Company that are responsible for relevant research on which the Mineral Resources and Ore Reserves estimate is based:

Geology and Mineral Resources - Victor Pchelka, Head of Production and Geology Department, Polymetal Eurasia, PONEN, MIMMM, with 34 years' relevant experience; Mining and Ore Reserves: Open Pit Bakyrchik - Anton Ignatov, Chief Specialist for Open-pit Mining, Technical Department, Polymetal Management Company, MIMMM, with 17 years' relevant experience; Open Pit East Bakyrchik - Dmitriy Teterin, Head of Mineral Resources and Ore Reserves Audit Department, Polymetal Engineering, FIMMM, with 11 years' relevant experience; Underground - Andrei Somov, Head of underground mining Department, Polymetal Engineering, PONEN, FIMMM, with 32 years' relevant experience; Concentration and Metals - Igor Agapov, Director of Science and Technology Department, Polymetal Engineering, MIMMM, with 22 years' relevant experience; Mineral Resources, Bolshevik - Alexander Cherepanov, Lead Geologist, Prospecting and Exploration Department, Polymetal Management Company, MIMMM, with 27 years' relevant experience.

All the above-mentioned Competent Persons have sufficient experience that is relevant to the style of mineralisation and types of deposits under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves' (JORC Code).

All Competent Persons have given their consent to the inclusion in the report of the matters based on their information in the form and context in which it appears.

 

About Polymetal 

Polymetal International plc (together with its subsidiaries - "Polymetal", the "Company", or the "Group") is a top-10 global gold producer and top-5 global silver producer with assets in Russia and Kazakhstan. The Company combines strong growth with a robust dividend yield.

Enquiries

Media   Investor Relations

FTI Consulting

Leonid Fink

Viktor Pomichal

+44 20 3727 1000

Polymetal

Evgeny Monakhov

Timofey Kulakov

Kirill Kuznetsov

ir@polymetalinternational.com

+44 20 7887 1475 (UK)

 

+7 812 334 3666 (Russia)

Joint Corporate Brokers  

Morgan Stanley & Co. International plc

Andrew Foster

Richard Brown

Panmure Gordon

Daniel Norman

John Prior

+44 20 7425 8000

 

 

 

 

+44 20 7886 2500

RBC Europe Limited

Marcus Jackson

Jamil Miah

+44 20 7653 4000

Forward-looking statements

This release may include statements that are, or may be deemed to be, "forward-looking statements". These forward-looking statements speak only as at the date of this release. These forward-looking statements can be identified by the use of forward-looking terminology, including the words "targets", "believes", "expects", "aims", "intends", "will", "may", "anticipates", "would", "could" or "should" or similar expressions or, in each case their negative or other variations or by discussion of strategies, plans, objectives, goals, future events or intentions. These forward-looking statements all include matters that are not historical facts. By their nature, such forward-looking statements involve known and unknown risks, uncertainties and other important factors beyond the company's control that could cause the actual results, performance or achievements of the company to be materially different from future results, performance or achievements expressed or implied by such forward-looking statements. Such forward-looking statements are based on numerous assumptions regarding the company's present and future business strategies and the environment in which the company will operate in the future. Forward-looking statements are not guarantees of future performance. There are many factors that could cause the company's actual results, performance or achievements to differ materially from those expressed in such forward-looking statements. The company expressly disclaims any obligation or undertaking to disseminate any updates or revisions to any forward-looking statements contained herein to reflect any change in the company's expectations with regard thereto or any change in events, conditions or circumstances on which any such statements are based.

 

 


[1] Including stockpiles


ISIN:JE00B6T5S470
Category Code:MSCM
TIDM:POLY
Sequence No.:87431
EQS News ID:1146358
 
End of AnnouncementEQS News Service

UK Regulatory announcement transmitted by DGAP - a service of EQS Group AG. The issuer is solely responsible for the content of this announcement.

Date   Source Headline
10th Aug 20237:00 amEQSPolymetal: Resumption of trading on AIX
1st Aug 20236:00 pmEQSPolymetal: Suspension of Trading on the London Stock Exchange
28th Jul 20231:00 pmEQSPolymetal: Results of GM
25th Jul 20232:00 pmEQSPolymetal: Results of AGM
24th Jul 20233:00 pmEQSPolymetal: Q2 2023 production results webcast
21st Jul 20237:00 amEQSPolymetal: Update to the timetable of the Re-domiciliation
10th Jul 20234:55 pmEQSPolymetal: Proposed cancellation of listing on the Official List and from trading on the London Stock Exchange and notice of General Meeting
10th Jul 202311:30 amEQSPolymetal: Acquisition of the controlling stake in the Baksy property in Kazakhstan
10th Jul 20237:00 amEQSPolymetal: Clarification to the expected timetable of the Re-domiciliation
30th Jun 20233:00 pmEQSPolymetal: Report on payments to governments for the year 2022
29th Jun 20237:05 amEQSPolymetal: Update to the timetable of the Re-domiciliation
29th Jun 20237:00 amEQSPolymetal: Notice of 2023 AGM
19th Jun 20233:30 pmEQSPolymetal: Board changes
16th Jun 20237:01 amEQSPolymetal: Further Extension to Exchange Offer Timetable
5th Jun 20237:00 amEQSPolymetal: Update on the Company’s Russian-registered subsidiary, JSC Polymetal
30th May 20231:30 pmEQSPolymetal: Results of GM
26th May 20234:21 pmEQSPolymetal: Resignation of Bank of New York Mellon as depository bank for American Depositary Receipt programme
22nd May 20237:00 amEQSPolymetal: Update on the Russian-registered JSC Polymetal
18th May 20235:00 pmEQSPolymetal: General Meeting Voting Arrangements
16th May 20237:01 amEQSPolymetal: Circulation of General Meeting Materials
10th May 20237:01 amEQSPolymetal: Q1 2023 production results
10th May 20237:00 amEQSPolymetal: Proposed re-domiciliation to the AIFC (Кazakhstan) and notice of General Meeting
3rd May 20237:00 amEQSPolymetal: Analyst and Investor Briefing
23rd Mar 20237:00 amEQSPolymetal International plc: Integrated Annual Report 2022
16th Mar 20237:01 amEQSPolymetal: Preliminary results for the year ended 31 December 2022
16th Mar 20237:00 amEQSPolymetal: Board Committee Changes
1st Mar 20237:01 amEQSPolymetal: Ore Reserves, Mineral Resources and Exploration update as at 1 January 2023
10th Feb 20238:00 amEQSPolymetal: Statement in relation to trading of shares on the London Stock Exchange
10th Feb 20237:00 amEQSPolymetal: Statement in relation to trading of shares on the London Stock Exchange
27th Jan 20234:40 pmRNSSecond Price Monitoring Extn
27th Jan 20234:35 pmRNSPrice Monitoring Extension
25th Jan 20238:00 amEQSPolymetal: Q4 and FY 2022 production results
25th Jan 20237:00 amEQSPolymetal: Q4 and FY 2022 production results
17th Jan 20238:00 amEQSPolymetal: Analyst and Investor Day
17th Jan 20237:00 amEQSPolymetal: Analyst and Investor Day
11th Jan 20234:35 pmRNSPrice Monitoring Extension
30th Dec 20228:00 amEQSPolymetal: Total Voting Rights as at 30 December 2022
30th Dec 20227:00 amEQSPolymetal: Total Voting Rights as at 30 December 2022
12th Dec 20228:00 amEQSPolymetal: Results of the first tranche of the Exchange Offer
12th Dec 20227:00 amEQSPolymetal: Results of the first tranche of the Exchange Offer
8th Dec 20228:00 amEQSPolymetal: Extension to the settlement period in connection with the Exchange Offer
8th Dec 20227:00 amEQSPolymetal: Extension to the settlement period in connection with the Exchange Offer
1st Dec 20228:00 amEQSPolymetal: Board Changes
1st Dec 20227:00 amEQSPolymetal: Board Changes
10th Nov 20228:00 amEQSPolymetal: Board Committee Changes
10th Nov 20227:00 amEQSPolymetal: Board Committee Changes
2nd Nov 20228:00 amEQSPolymetal: Q3 2022 production results
2nd Nov 20227:00 amEQSPolymetal: Q3 2022 production results
12th Oct 20225:30 pmEQSPolymetal: Submission of resolutions to NSM
12th Oct 20225:30 pmEQSPolymetal: Submission of resolutions to NSM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.