Initial Ore Reserve estimate for Nezhda

13 Nov 2017 07:00

RNS Number : 2522W
Polymetal International PLC
13 November 2017
 

Release time

IMMEDIATE

Date

13 November 2017

 

 

Polymetal International plc

Initial ore reserve estimate for the Nezhda gold property

Polymetal International plc (LSE, MOEX: POLY; ADR: AUCOY) ("Polymetal", the "Company") is pleased to report the initial Ore Reserve estimate for the Nezhda gold property in accordance with the JORC Code (2012).

HIGHLIGHTS

· Open-pit Ore Reserves are estimated at 15.5 Mt of ore with an average gold equivalent (GE) grade of 4.0 g/t for 2.0 Moz of GE contained.

· Additional Mineral Resources are estimated at 55.9 Mt of ore with an average GE grade of 5.0 g/t for 8.9 Moz of GE contained.

· Current reserve estimate assumes 11 years of open-pit mining from Ore Zone 1. Ore will be processed by a conventional concentrator with further off-site downstream processing or sale of concentrate to 3rd parties.

· The Company expects average annual production of 150 Koz of payable gold in concentrate with all-in sustaining cash costs in the range of US$ 650-710/oz of GE and total cash costs in the range of US$590-640/oz of GE.

· Nezhda is expected to benefit from low capital intensity with robust project economics. Total capital expenditures are estimated at US$ 249 million (including pre-stripping costs).

· The project's IRR is expected to be 20% with an NPV of US$ 132 million (using a 10% discount rate, US$ 1,200/oz gold price, US$ 16/oz silver price and RUB/USD exchange rate of 60). This estimate is only based on the current reserve estimate.

· Production start date is currently projected to start during first half of 2022, subject to a positive investment and development decision in Q4 of 2018. Such date would be after the successful ramp-up of Kyzyl and consolidation of 100% ownership in the Nezhda property.

· Polymetal is now focused on further exploration drilling for the conversion of resources into higher categories and the preparation of a feasibility study by the end of 2018.

 

"I am pleased that the initial Ore Reserve estimate for Nezhda reaffirms its economic viability and justifies Polymetal's approach to developing the asset." said Vitaly Nesis, Group CEO of Polymetal. "With low capital intensity and significant low-cost production, Nezhda retains significant optionality which we will work hard on to incorporate in the development plan before our final investment decision".  

INITIAL ORE RESERVE STATEMENT

The Nezhda Ore Reserve estimate for the open pit is reported in accordance with the JORC Code (2012) as at 1 July 2017 using a gold price of US$ 1,200/oz and silver price of US$ 16/oz. A cut-off grade of 2.0 g/t gold equivalent (GE) has been applied. The Ore Reserve statement was prepared by Polymetal.

Nezhda Open-pit Ore Reserves estimate

Ore Reserves

Tonnage

Grade

Content

Mt

Au, g/t

Ag, g/t

GE, g/t

Au, Moz

Ag, Moz

GE, Moz

Proved

7.6

4.0

25

4.2

1.0

6.2

1.0

Probable

7.9

3.7

15

3.8

0.9

3.8

1.0

Proved+Probable

15.5

3.8

20

4.0

1.9

10.0

2.0

 

 

 

 

 

 

 

 

Notes: Ore Reserves were estimated as at 01.07.2017 at the prices: Au=US$ 1,200/oz, Ag = US$ 16/oz, COG GE =2.0 g/t. Ore Reserves are reported in accordance with JORC Code (2012). Discrepancies in calculations are due to rounding

ADDITIONAL MINERAL RESOURCES

Additional Mineral Resources for Nezhda for the open pit and underground are reported in accordance with the JORC Code (2012) as at 1 July 2017 using a gold price of US$ 1,200/oz and silver price of US$ 16/oz. The revaluation of Mineral Resources was prepared by Polymetal based on new geomechanical data for the deposit.

Nezhda Additional Mineral Resource estimate

Additional Mineral Resources

Tonnage

Grade

Content

Mt

Au, g/t

Ag, g/t

GE, g/t

Au, Moz

Ag, Moz

GE, Moz

Measured

 

 

 

 

 

 

 

Underground

1.2

5.3

13

5.4

0.2

0.5

0.2

Total Measured

1.2

5.3

13

5.4

0.2

0.5

0.2

 

 

 

 

 

 

 

 

Indicated

 

 

 

 

 

 

 

Open-pit

0.8

2.9

21

3.0

0.1

0.5

0.1

Underground

5.5

5.2

16

5.3

0.9

2.9

0.9

Total Indicated

6.3

4.9

17

5.0

1.0

3.4

1.0

 

 

 

 

 

 

 

 

Measured+Indicated

 

 

 

 

 

 

 

Open-pit

0.8

2.9

21

3.0

0.1

0.5

0.1

Underground

6.7

5.2

15

5.3

1.1

3.3

1.2

Total Measured+Indicated

7.5

5.0

16

5.1

1.2

3.9

1.2

 

 

 

 

 

 

 

 

Inferred

 

 

 

 

 

 

 

Open-pit

1.8

3.0

13

3.1

0.2

0.7

0.2

Underground

46.7

4.9

10

5.0

7.4

15.4

7.5

Total Inferred

48.5

4.9

10

4.9

7.6

16.1

7.7

 

 

 

 

 

 

 

 

Measured + Indicated + Inferred

 

 

 

 

 

 

 

Open-pit

2.6

3.0

15

3.1

0.2

1.3

0.3

Underground

53.4

5.0

11

5.1

8.5

18.7

8.7

Total Measured + Indicated + Inferred

55.9

4.9

11

5.0

8.8

20.0

8.9

Notes: Measured and Indicated Mineral Resources are additional to Ore Reserves. Inferred Mineral Resources are by definition always additional to Ore Reserves. Cut-off grades of 3.0 and 2.0 g/t gold equivalent (GE) have been applied for the underground and open pit Mineral Resources, respectively. Due to the effects of rounding, the sum of individual values will not necessarily equal the total.

The estimate is based on data from 42,479 m of diamond drilling completed by Polymetal in 2015 and 2017 in addition to the 339,392 m of drilling completed by previous owners. Mineral resources for the open pit were estimated up to a depth of 250 m from the surface.

The largest mineralised structure is mineralised zone 1 ("MZ 1") which has a strike length of 4,900 m and a vertical extent over 1,800 m and comprises 80% of currently estimated Mineral Resources at Nezhda in terms of gold contained. For MZ 1, top cutting at 80 g/t gold was applied to reduce outlier grade influence on local estimation.

INFORMATION ON NEZHDA

Nezhda is the fourth largest gold deposit in Russia, located in northeast Yakutia in the Tompon municipal district, approximately 480 km east from the city of Yakutsk (population of 350,000). The property is remote with access by an all-season unpaved road and no grid connection. The nearest federal highway is 110 km away from the deposit by all-year unpaved road. The highway provides direct access to the Khandyga river port (170 km) and the Nizhniy Bestiakh railway spur (370 km). The climate is characterized by long severe winters and short hot summers. The relief is moderately mountainous with relative altitudes above valley floors not exceeding 600 m.

The deposit is composed of large mineralised zones, representing areas of intense brecciation comprised of crushed and sheared, hydrothermally altered, sedimentary rocks that have been variably enriched in quartz. The Nezhda mineralisation is double refractory due to the encapsulation of fine gold particles within sulphide minerals and significant presence of preg-robbing carbonaceous material.

The Nezhdaninskoye gold deposit was discovered in 1951 during the Allakh-Yunskaya geological exploration expedition. From 1959, the deposit was subject to several exploration and evaluation initiatives resulting in newly identified ore zones. In 1975, a 180 Kt per annum underground mine and concentrator was commissioned at Nezhda with over 2 Mt of ore mined and processed before the operation was placed on care and maintenance in 2005. Polyus acquired the asset in 2006, subsequently undertaking an extensive exploration program and completing several technical studies.

Polymetal entered into the joint venture with Polyus Gold for the Nezhda gold deposit in 2015, completing a total 42,479 m of diamond drilling by 2017, which resulted in an initial JORC-compliant mineral resource estimate reported on July 17, 2017.

MINING

The mine plan envisages two large open pits that will be mined over 11 years via conventional drill-and-blast and truck-shovel methods. Evaluation of subsequent underground mining potential is under way.

The ultimate contours of the open pits were determined via pit optimization, including trade-off studies with underground mining. An open-pit cut-off grade of 2.0 g/t GE was used. Average pit slope angles of 45-55 degrees for open-pit No.1 and 39-55 for open-pit No.2 were applied, with the upper and lower levels estimated at +1,475 m above sea level (asl) and +680 m asl, respectively.

Projected open-pit mining volumes are currently set at 1.5 Mtpa of ore with an average stripping ratio of 12:1.

METALLURGY AND PROCESSING

Currently expected flotation plant capacity is 1.5 Mt of ore per annum, followed by concentrate off-take or POX processing. Gold recovery to concentrate is anticipated at 85% with a mass pull ratio of 5.3%.

The current estimate envisages 1.5 Mtpa concentrator incorporating crushing, two-stage grinding, and flotation and gravity circuits. Tailings will be filtered and dry stacked within the existing historic storage facility. Dried flotation concentrates will be sold to third party off-takers while gravity concentrate will processed at the Amursk POX facility.

CAPITAL EXPENDITURE

Total capital costs for Nezhda are estimated at US$ 249 million, including US$ 15 million capitalised pre-stripping costs, with approximately US$ 30 million to be invested in 2018 into project design, permitting and exploration.

Area

Capital Cost,

US$ million

 

 

Mining fleet

41

Processing plant equipment

49

Construction and infrastructure

122

Engineering

7

Contingency

15

Initial Capital Costs

234

Pre-stripping

15

Total Capital Costs

249

PROJECT DEVELOPMENT TIMELINE

Polymetal envisages the following conceptual development timeline for the Nezhda gold Project:

· Completion of Feasibility Study and investment decision in Q4 2018

· Start of construction in Q4 2018 subject to positive investment decision

· Pre-stripping to start in 2019

· First production: 2022

· Full capacity: 2023

COMPETENT PERSONS

This estimate was prepared by employees of JSC Polymetal Management Company and JSC Polymetal Engineering, subsidiaries of the Company, led by Mr. Boris Sogrin, who assumes overall responsibility for the Mineral Resources and Ore Reserves Report.

Mr. Sogrin is with JSC Polymetal Engineering since 2004 and has more than 13 years experience in gold, silver and polymetallic mining. He is a Member of the Institute of Materials, Minerals & Mining (MIMMM), London, and a Competent Person under the JORC Code.

Listed below are other Competent Persons employed by the Company that are responsible for relevant research on which the Mineral Resources and Ore Reserves estimate is based:

· Geology and Mineral Resources - Roman Govorukha, Head of Geologic Modelling and Monitoring Department, MIMMM, with 16 years' relevant experience;

· Mining and Ore Reserves - Igor Epshteyn, Head of Mining Process Department, MIMMM, with 35 years' relevant experience;

· Concentration and Metals - Igor Agapov, Deputy Director of Science and Technology, MIMMM, with 19 years' relevant experience;

All the above mentioned Competent Persons have sufficient experience that is relevant to the style of mineralisation and types of deposits under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves' (JORC Code).

All Competent Persons have given their consent to the inclusion in the report of the matters based on their information in the form and context in which it appears.

Enquiries

Media Investor Relations

FTI Consulting

Leonid Fink

Viktor Pomichal

+44 20 3727 1000

Polymetal

Evgenia Onuschenko

Maryana Nesis

Michael Vasiliev

ir@polymetalinternational.com

+44 20 7016 9505 (UK)

 

+7 812 334 3666 (Russia)

Joint Corporate Brokers 

Morgan Stanley

Sam McLennan

Richard Brown

 

Panmure Gordon

Adam James

Tom Salvesen

+44 20 7425 8000

 

 

 

 

 

+44 20 7886 2500

RBC Europe Limited

Tristan Lovegrove

Marcus Jackson

+44 20 7653 4000

 

FORWARD-LOOKING STATEMENTS

THIS RELEASE MAY INCLUDE STATEMENTS THAT ARE, OR MAY BE DEEMED TO BE, "FORWARD-LOOKING STATEMENTS". THESE FORWARD-LOOKING STATEMENTS SPEAK ONLY AS AT THE DATE OF THIS RELEASE. THESE FORWARD-LOOKING STATEMENTS CAN BE IDENTIFIED BY THE USE OF FORWARD-LOOKING TERMINOLOGY, INCLUDING THE WORDS "TARGETS", "BELIEVES", "EXPECTS", "AIMS", "INTENDS", "WILL", "MAY", "ANTICIPATES", "WOULD", "COULD" OR "SHOULD" OR SIMILAR EXPRESSIONS OR, IN EACH CASE THEIR NEGATIVE OR OTHER VARIATIONS OR BY DISCUSSION OF STRATEGIES, PLANS, OBJECTIVES, GOALS, FUTURE EVENTS OR INTENTIONS. THESE FORWARD-LOOKING STATEMENTS ALL INCLUDE MATTERS THAT ARE NOT HISTORICAL FACTS. BY THEIR NATURE, SUCH FORWARD-LOOKING STATEMENTS INVOLVE KNOWN AND UNKNOWN RISKS, UNCERTAINTIES AND OTHER IMPORTANT FACTORS BEYOND THE COMPANY'S CONTROL THAT COULD CAUSE THE ACTUAL RESULTS, PERFORMANCE OR ACHIEVEMENTS OF THE COMPANY TO BE MATERIALLY DIFFERENT FROM FUTURE RESULTS, PERFORMANCE OR ACHIEVEMENTS EXPRESSED OR IMPLIED BY SUCH FORWARD-LOOKING STATEMENTS. SUCH FORWARD-LOOKING STATEMENTS ARE BASED ON NUMEROUS ASSUMPTIONS REGARDING THE COMPANY'S PRESENT AND FUTURE BUSINESS STRATEGIES AND THE ENVIRONMENT IN WHICH THE COMPANY WILL OPERATE IN THE FUTURE. FORWARD-LOOKING STATEMENTS ARE NOT GUARANTEES OF FUTURE PERFORMANCE. THERE ARE MANY FACTORS THAT COULD CAUSE THE COMPANY'S ACTUAL RESULTS, PERFORMANCE OR ACHIEVEMENTS TO DIFFER MATERIALLY FROM THOSE EXPRESSED IN SUCH FORWARD-LOOKING STATEMENTS. THE COMPANY EXPRESSLY DISCLAIMS ANY OBLIGATION OR UNDERTAKING TO DISSEMINATE ANY UPDATES OR REVISIONS TO ANY FORWARD-LOOKING STATEMENTS CONTAINED HEREIN TO REFLECT ANY CHANGE IN THE COMPANY'S EXPECTATIONS WITH REGARD THERETO OR ANY CHANGE IN EVENTS, CONDITIONS OR CIRCUMSTANCES ON WHICH ANY SUCH STATEMENTS ARE BASED

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLDXBDBUDBBGRD
Date   Source Headline
10th Aug 20237:00 amEQSPolymetal: Resumption of trading on AIX
1st Aug 20236:00 pmEQSPolymetal: Suspension of Trading on the London Stock Exchange
28th Jul 20231:00 pmEQSPolymetal: Results of GM
25th Jul 20232:00 pmEQSPolymetal: Results of AGM
24th Jul 20233:00 pmEQSPolymetal: Q2 2023 production results webcast
21st Jul 20237:00 amEQSPolymetal: Update to the timetable of the Re-domiciliation
10th Jul 20234:55 pmEQSPolymetal: Proposed cancellation of listing on the Official List and from trading on the London Stock Exchange and notice of General Meeting
10th Jul 202311:30 amEQSPolymetal: Acquisition of the controlling stake in the Baksy property in Kazakhstan
10th Jul 20237:00 amEQSPolymetal: Clarification to the expected timetable of the Re-domiciliation
30th Jun 20233:00 pmEQSPolymetal: Report on payments to governments for the year 2022
29th Jun 20237:05 amEQSPolymetal: Update to the timetable of the Re-domiciliation
29th Jun 20237:00 amEQSPolymetal: Notice of 2023 AGM
19th Jun 20233:30 pmEQSPolymetal: Board changes
16th Jun 20237:01 amEQSPolymetal: Further Extension to Exchange Offer Timetable
5th Jun 20237:00 amEQSPolymetal: Update on the Company’s Russian-registered subsidiary, JSC Polymetal
30th May 20231:30 pmEQSPolymetal: Results of GM
26th May 20234:21 pmEQSPolymetal: Resignation of Bank of New York Mellon as depository bank for American Depositary Receipt programme
22nd May 20237:00 amEQSPolymetal: Update on the Russian-registered JSC Polymetal
18th May 20235:00 pmEQSPolymetal: General Meeting Voting Arrangements
16th May 20237:01 amEQSPolymetal: Circulation of General Meeting Materials
10th May 20237:01 amEQSPolymetal: Q1 2023 production results
10th May 20237:00 amEQSPolymetal: Proposed re-domiciliation to the AIFC (Кazakhstan) and notice of General Meeting
3rd May 20237:00 amEQSPolymetal: Analyst and Investor Briefing
23rd Mar 20237:00 amEQSPolymetal International plc: Integrated Annual Report 2022
16th Mar 20237:01 amEQSPolymetal: Preliminary results for the year ended 31 December 2022
16th Mar 20237:00 amEQSPolymetal: Board Committee Changes
1st Mar 20237:01 amEQSPolymetal: Ore Reserves, Mineral Resources and Exploration update as at 1 January 2023
10th Feb 20238:00 amEQSPolymetal: Statement in relation to trading of shares on the London Stock Exchange
10th Feb 20237:00 amEQSPolymetal: Statement in relation to trading of shares on the London Stock Exchange
27th Jan 20234:40 pmRNSSecond Price Monitoring Extn
27th Jan 20234:35 pmRNSPrice Monitoring Extension
25th Jan 20238:00 amEQSPolymetal: Q4 and FY 2022 production results
25th Jan 20237:00 amEQSPolymetal: Q4 and FY 2022 production results
17th Jan 20238:00 amEQSPolymetal: Analyst and Investor Day
17th Jan 20237:00 amEQSPolymetal: Analyst and Investor Day
11th Jan 20234:35 pmRNSPrice Monitoring Extension
30th Dec 20228:00 amEQSPolymetal: Total Voting Rights as at 30 December 2022
30th Dec 20227:00 amEQSPolymetal: Total Voting Rights as at 30 December 2022
12th Dec 20228:00 amEQSPolymetal: Results of the first tranche of the Exchange Offer
12th Dec 20227:00 amEQSPolymetal: Results of the first tranche of the Exchange Offer
8th Dec 20228:00 amEQSPolymetal: Extension to the settlement period in connection with the Exchange Offer
8th Dec 20227:00 amEQSPolymetal: Extension to the settlement period in connection with the Exchange Offer
1st Dec 20228:00 amEQSPolymetal: Board Changes
1st Dec 20227:00 amEQSPolymetal: Board Changes
10th Nov 20228:00 amEQSPolymetal: Board Committee Changes
10th Nov 20227:00 amEQSPolymetal: Board Committee Changes
2nd Nov 20228:00 amEQSPolymetal: Q3 2022 production results
2nd Nov 20227:00 amEQSPolymetal: Q3 2022 production results
12th Oct 20225:30 pmEQSPolymetal: Submission of resolutions to NSM
12th Oct 20225:30 pmEQSPolymetal: Submission of resolutions to NSM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.