The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPatagonia Gold Regulatory News (PGD)

  • There is currently no data for PGD

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Progress Update

7 May 2013 07:00

RNS Number : 0382E
Patagonia Gold PLC
07 May 2013
 



7th May 2013

 

Patagonia Gold reports continued progress

At Lomada de Leiva, Cap-Oeste/COSE and La Manchuria Projects

 

London, United Kingdom 7th May 2013 - Patagonia Gold Plc (AIM: PGD, TSX: PAT) ("Patagonia Gold" or "the Company") today is pleased to provide a progress update for its Lomada de Leiva, Cap-Oeste/COSE and La Manchuria projects in the Santa Cruz province, Argentina.

 

Lomada de Leiva:

·; Preparation works for the 200,000 tonne expansion of the existing trial heap leach pad were completed in late March 2013 with loading of mineralised material, irrigation and production of gold in progress.

·; Construction of the first stage of the main heap leach pad remains on schedule for completion in late Q2 2013. The PVC membrane lining of the drainage dam and buttress sections is now in place with pipework installation underway.

·; Patagonia Gold's mining fleet has been delivered to site and commissioned. Operator training and demobilisation of hire gear is underway, with all contractor equipment scheduled to be off site by the end of May 2013.

 

Cap-Oeste/COSE

·; Drilling in the structural corridor between the Cap-Oeste and COSE deposits continues to intersect wide zones of gold-silver mineralisation with drill-hole CSE-091 intersecting 66.6m at 2.04 grammes per tonne (g/t) gold and 36.18 g/t silver.

·; COSE resource update to include the newly identified mineralisation scheduled to commence in Q3 2013 with completion in Q4 2013.

·; Pre-Feasibility study on the Cap-Oeste deposit is set to commence in May 2013 led by Newfields Inc. of Reno, Nevada USA.

 

La Manchuria:

·; Drilling has recommenced at La Manchuria with 4,000 metres of extension and exploration drilling scheduled for completion in Q2 2013.

·; The Manchuria deposit is currently being re-evaluated as a potential bulk tonnage heap leach target that will incorporate mineralisation not previously included in the model.

 

"With the Lomada project funded to completion and set to provide free cash flow in the second half of 2013, Patagonia Gold can now focus on expanding its significant resource base of 1.88 million ounces of gold equivalent, concentrating on the highly prospective, high grade Cap-Oeste/COSE and La Manchuria deposits," said Bill Humphries, CEO of Patagonia Gold.

 

Photographs of the progress at Lomada and Cap-Oeste will be posted on the Company's website, www.patagoniagold.com

 

LOMADA DE LEIVA:

The Lomada de Leiva project is located approximately 40 kilometres south-east of the town of Perito Moreno in the province of Santa Cruz, within the Company's La Paloma property block, covering over 44 square kilometres.

 

Gold production continues with the mining, loading and irrigation of mineralised material onto the expanded trial heap leach pad.

 

Construction of the fully permitted Lomada main heap leach project is well advanced and on target to achieve full 'nameplate' production of 21,000 ounces of gold per annum in late Q2 2013. The company recently received a permit, issued by the national authorising body RENAR, to store explosives on site, which will both substantially increase mining capacity and reduce costs. Construction of the explosives magazine was completed in Q1 2013.

Targeted mine production of 65,000 tonnes of mineralised material per month is scheduled to be achieved by June 2013, which is expected to coincide with the completion of the main pad area. Mine office facilities are now onsite and installed and a 40-person mine camp has also been constructed. The mine camp, to be commissioned by late May, will increase onsite personnel availability and reduce administration, travel and lodging costs.

CAP-OESTE/COSE:

The El Tranquilo property block, covering approximately 80,000 hectares, contains Patagonia Gold's flagship Cap-Oeste project, together with the COSE bonanza gold and silver deposit and numerous other prospects including Monte Leon.

 

Ten diamond core HQ drill-holes totalling 2,475 metres have been completed so far this year targeting the wide mineralised area, previously identified by exploration drilling in 2012 (ref. news release 5 July 2012), along the Bonanza-COSE fault between the Cap-Oeste and COSE deposits. To date, the 1.5 kilometres of strike length has only partially been tested. Further drilling will be designed once all results have been received and the first phase of a new geological resource model has been completed.

 

COSE mineralised intersections include:

Hole-ID

From

To

Interval

Grade

Grade

Grade

(m)

(m)

(m)

Au (g/t)

Ag (g/t)

AuEq (g/t)

CSE-088-D

180.0

214.0

34.0

2.31

27.14

2.82

including

180.0

188.0

8.0

5.08

83.76

6.64

CSE-089-D

227.7

243.4

15.8

1.18

15.26

1.47

CSE-090-D

130.0

157.0

27.0

1.38

108.26

3.40

CSE-091-D

117.4

184.0

66.6

2.04

36.18

2.71

including

155.5

176.1

20.6

3.01

42.60

3.80

CSE-092-D

151.1

153.9

2.8

5.71

95.12

7.49

CSE-093-D

228.0

233.0

5.0

6.58

14.61

6.85

*Intervals reported in the above table are not true thicknesses and are estimated to represent between 80-85% of the actual true thickness of mineralisation

** AuEq(gold equivalent) ratio is 53.5:1 Ag:Au

 

Patagonia Gold is assessing the possibility of including COSE in the Cap-Oeste Pre-Feasibility study. A recalculation and estimation of the COSE resource will need to be completed as the first step of the Pre-Feasibility study, after which the combined compliant resources of Cap-Oeste and COSE will be incorporated into the preliminary evaluation. Newfields Inc. of Reno, Nevada, USA will lead the pre-feasibility team along with mining consultant AMEC and potentially another third party to oversee plant and metallurgical process design and costing. Further updates will be provided as the Pre-Feasibility study proceeds.

 

LA MANCHURIA:

The La Manchuria project is located approximately 44 kilometres south-east of the Cap-Oeste and COSE deposits and represents a large system of low sulphidation style vein hosted gold-silver (Au-Ag) mineralisation which outcrops at surface. To date, the Company has completed 20,993 metres of diamond and reverse circulation drilling on this project. Patagonia Gold reported the following Canadian National Instrument (NI) 43-101 compliant resource in September 2010:

 

Indicated

Grade (g/t)

Metal (Oz)

Domain

Tonnes

Au

Ag

AuEq

Au

Ag

AuEq

Oxide

141,570

1.91

139.1

3.12

8,675

633,338

14,198

Hypogene

284,136

3.46

133.0

4.54

31,642

1,214,873

41,486

Total

425,705

2.95

135.0

4.07

40,317

1,848,211

55,684

Inferred

Grade (g/t)

Metal (Oz)

Domain

Tonnes

Au

Ag

AuEq

Au

Ag

AuEq

Oxide

496,179

1.33

42.5

1.66

21,138

678,485

26,462

Hypogene

972,840

1.64

53.0

2.05

51,197

1,656,751

64,220

Total

1,469,020

1.53

49.4

1.92

72,335

2,335,236

90,682

The following economic assumptions were used in calculating the AuEq grade of each block:

Gold Price: $US 925/oz Gold recovery: 95%

Silver Price: $US 14.50/oz Silver Recovery: 60%

Formulae:

1) Metal Value = Grade * Metal Price * Metallurgical Recovery * 0.032151

2) AuEq = (Au-Value + Ag-Value) / (Au-Price * 0.032151)

 

"Thomas C Stubens, M.A.Sc., P.Eng., a Senior Geologist with Micon International Limited and a Qualified Person as defined in Canadian National Instrument 43-101, was the author of the report entitled "Technical Report on the Mineral Resources of the La Manchuria Project, Santa Cruz Province, Argentina", prepared for Patagonia Gold SA, dated 15th September, 2010."

 

Management believes that significant potential exists to substantially grow the resource base by changing the mineralisation focus from the thin, discontinuous high grade vein hosted model to a low grade bulk tonnage target. Preliminary re-evaluation work is underway. Should this study provide positive results, an updated 43-101 compliant resource will be prepared.

 

Drilling is currently in progress and will concentrate on extending the mineralised envelope on the Manchuria deposit and testing targets at Manchuria East and further to the north-east and south-east where no drilling has previously been completed. Drilling will also follow up on the excellent trenching results in Manchuria East including TR-EZ S07 reporting 12 metres @ 2.97 g/t gold and TR-EZ S09 2.5 metres @ 11.98 g/t gold. Both of these trenches intersect an outcropping vein structure with a strike extent of in excess of 300 metres.

 

Geochemical and geophysical programmes will also be undertaken during the second half of 2013 on both the La Manchuria property and the recently incorporated Manchuria South property which was obtained through the 2011 PGSA joint venture arrangement between the Company and Fomicruz, the Santa Cruz provincial mining company. Manchuria South contains mineralised occurrences previously delineated by Fomicruz.

 

About Patagonia Gold

Patagonia Gold Plc is a mining company that seeks to grow shareholder value through exploration, development and production of gold and silver projects in the southern Patagonia region of Argentina. The Company is primarily focused on four projects: the flagship Cap-Oeste project, the nearby COSE project, the La Manchuria project and the Lomada heap leach project, which is generating free cash flow. Patagonia Gold, indirectly through its subsidiaries or under option agreements, has mineral rights to over 220 properties in several provinces of Argentina and Chile, and is one of the largest landholders in the province of Santa Cruz.

Patagonia Gold is listed on the Toronto Stock Exchange (TSX) under the symbol PAT and has been listed on the AIM market of the London Stock Exchange under the symbol PGD since 2003.

Matthew Boyes, (BSC. Geology, Fellow AusIMM) Chief Operating Officer for Patagonia Gold PGSA and a qualified person as defined in Canadian National Instrument 43-101, has reviewed and verified all scientific or technical mining disclosure contained in this press release.

 

Cautionary Note Regarding Technical Information and Forward-Looking Information

The Company's production decision in respect of the Lomada project is not based on a feasibility study of mineral reserves demonstrating economic and technical viability and therefore readers are cautioned that there is increased uncertainty and there are economic and technical risks of failure associated with such production decisions.

 

This news release may contain certain information that constitutes forward-looking information within the meaning of applicable securities laws. Forward-looking information is frequently characterised by words such as "plan," "expect," "project," "intend," "believe," "anticipate" and other similar words, or statements that certain events or conditions "may" or "will" occur. Forward-looking information includes, but is not limited to, statements about strategic plans, mineral resources estimates, spending commitments, forecasts of free cash flow, future operations, results of exploration, commencement and completion of pre-feasibility studies, future work programs, commencement production, production schedules, capital expenditures and objectives. Forward-looking information is based on the opinions, expectations and estimates of management at the date the statements are made, and are subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward-looking information. These factors include the inherent risks involved in the exploration and development of mineral properties, the uncertainties involved in interpreting drilling results and other geological data, fluctuating metal prices and other factors described above and in the Company's most recent annual information form under the heading "Risk Factors," which has been filed electronically by means of the Canadian Securities Administrators' website located at www.sedar.com. The Company disclaims any obligation to update or revise any forward-looking information if circumstances or management's estimates, expectations or opinions should change. The reader is cautioned not to place undue reliance on forward-looking information.

Contact Information

Bill Humphries, CEOPatagonia Gold PlcTel: +44 (0)20 7409 7444

Colin LanguedocBarnes Communications Inc.Tel: +1 (416) 367-5000

Angela Hallett/James DanceStrand Hanson LtdTel: +44 (0)20 7409 3494

Rory ScottMirabaud Securities LLPTel: +44 (0)20 7484 3510

David Bick / Mark LongsonSquare 1 Consulting+44 (0)20 7929 5599

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCSSSFMDFDSEII
Date   Source Headline
22nd Jul 201910:30 amRNSScheme of arrangement becomes Effective
22nd Jul 20197:30 amRNSSuspension - Patagonia Gold Plc
19th Jul 20191:00 pmRNSCourt Sanction of Scheme of Arrangement
17th Jul 20195:30 pmRNSPatagonia Gold
12th Jul 201912:26 pmRNSResults of Court Meeting and General Meeting
3rd Jul 20194:30 pmRNSForm 8.3 - Hunt Mining Corp./Patagonia Gold PLC
21st Jun 20191:48 pmRNSHolding(s) in Company Patagonia Gold Plc
20th Jun 201912:00 pmRNSPublication of Scheme Document
18th Jun 20197:00 amRNSRevision to the 2018 Financial Statements
13th Jun 20194:00 pmRNSForm 8 (OPD) Hunt Mining Corp./Patagonia Gold PLC
13th Jun 20194:00 pmRNSForm 8.3 - Hunt Mining Corp./Patagonia Gold PLC
13th Jun 20194:00 pmRNSForm 8.3 - Hunt Mining Corp./Patagonia Gold PLC
13th Jun 20194:00 pmRNSForm 8.3 - Hunt Mining Corp./Patagonia Gold PLC
13th Jun 20197:00 amRNSLoan Facility Amendment
11th Jun 20193:53 pmBUSForm 8.3 - Patagonia Gold Plc
10th Jun 20197:00 amRNSForm 8 (OPD) - Patagonia Gold plc
7th Jun 20194:30 pmRNSForm 8.3 - Patagonia Gold plc
31st May 20197:15 amRNSCalcatreu and Cap Oeste Mineral Resource Update
31st May 20197:00 amRNSOffer for Patagonia Gold plc by Hunt Mining Corp.
11th Apr 20197:00 amRNSFinal Results
1st Mar 20197:00 amRNSUS$15 million Loan Agreement
27th Feb 20197:00 amRNSDrill Results Calcatreu Project in Argentina
19th Feb 20197:00 amRNSOperations Update
13th Feb 20197:00 amRNSDrill Results - San Jose Project in Uruguay
18th Jan 20191:00 pmRNSProduction Update
18th Jan 20191:00 pmRNSProduction Update
28th Dec 20187:00 amRNSAcquisition of Exploration Properties
21st Dec 20187:00 amRNSSale of COSE Royalty Update
11th Dec 20184:30 pmRNSSale of COSE Royalty
10th Oct 20187:00 amRNSCap Oeste and Calcatreu Update
25th Sep 20187:00 amRNSHalf Yearly Financial Statements
6th Sep 201810:15 amRNSArgentine Export Tax
11th Jul 20187:00 amRNSCap Oeste Production Update
8th Jun 20187:00 amRNSCap Oeste Production Update
1st Jun 20187:00 amRNSReceipt of Balance Payment of COSE
21st May 20187:00 amRNSFinal Payment of Calcatreu Project
9th May 20182:21 pmRNSResult of AGM
27th Apr 20187:00 amRNSNotice of AGM
24th Apr 20182:18 pmRNSOperations Update
12th Apr 20187:00 amRNSProposed Capital Reorganisation and Notice of AGM
12th Apr 20187:00 amRNSFinal Results
26th Mar 20187:00 amRNSOperations Update
21st Feb 20187:00 amRNSOperations Update
1st Feb 20187:00 amRNSAcquisition of Calcatreu Deposit
18th Jan 201811:00 amRNSPrice Monitoring Extension
28th Dec 20177:00 amRNSDefinitive Agreement - Calcatreu Deposit
19th Dec 20177:00 amRNSGrant of Options
11th Dec 20177:00 amRNSCalcatreu Option
7th Dec 20174:38 pmRNSResult of General Meeting and Open Offer
21st Nov 20177:00 amRNSSubscription and Open Offer

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.