Drilling and Exploration Update

24 Jul 2013 07:00

RNS Number : 9864J
Patagonia Gold PLC
24 July 2013
 



24th July 2013

 

Patagonia Gold Reports La Manchuria and Cap-Oeste-COSE Drilling and Exploration Update

 

London, United Kingdom 24th July 2013 - Patagonia Gold Plc (AIM: PGD,) ("Patagonia Gold" or the "Company") today provided a drilling and exploration progress update on the La Manchuria and Cap-Oeste-COSE projects.

 

La Manchuria project:

·; A re-evaluation of the existing La Manchuria resource, in conjunction with a drilling campaign to identify its possible expansion, is underway. Management believes significant potential exists to substantially grow the resource base by changing the focus from the narrow high grade vein hosted model used for the existing resource estimate to a lower grade bulk tonnage model

·; Assays from the first four drill-holes of the current campaign have been received with LM-099-D, drilled into a previously undrilled area of the Eastern Manchuria outcrop, intersecting 3.95 metres (m) at 15.97 grams per tonne (g/t) gold and 41.60 g/t silver

·; The Western outcrop containing the Main Zone ore body has been extended to the South East with LM-097-D intersecting 40m at 2.11 g/t gold 35.98 g/t silver

 

Cap-Oeste-COSE project:

·; A potential new high grade shoot has been identified 250 metres along strike to the north west of the main Cap-Oeste ore body with CO-401-D intersecting 42.50m at 2.12g/t gold and 57.41 g/t silver from 374.4m down hole. The shoot remains open along strike and down dip

·; Newfields Inc. of Reno, Nevada, USA has been contracted to lead the prefeasibility study to assess the economic viability of the combined Cap-Oeste-COSE deposits. Ongoing evaluation of both deposits have shown there to be potential synergies in combining their development including significant cost reductions in capital and operational costs.

 

La Manchuria South (new prospect)

·; First pass exploration success at La Manchuria South, located 15 kilometres to the south of the La Manchuria project, have returned encouraging results from sawn channel samples, including 1.10m @ 14.46g/t gold and 234.17g/t silver in Ch-18 plus 1.00m @ 4.50 g/tgold and 18.50g/t silver in Ch-01. All 20 channel samples returned anomalous values over the 450m strike of the mineralised structure

 

 

LA MANCHURIA:

The La Manchuria project is located approximately 44 kilometres south-east of the Cap-Oeste and COSE deposits and represents a large system of low sulphidation style vein hosted gold-silver (Au-Ag) mineralisation which outcrops at surface.

 

A nine hole, 1259m HQ diameter diamond drill programme was completed into the Manchuria main zone and Manchuria East on the 30th May 2013. Results have now been received for the first four holes tabulated below.

Hole ID

From

To

Length

Au

Ag

Au Eq

(m)

(m)

(m)

(g/t)

(g/t)

(g/t)

LM-096-D

136.87

138.00

1.13

6.78

311.00

11.96

LM-097-D

19.00

59.00

40.00

2.11

35.98

2.71

Including

39.00

40.00

1.00

16.30

41.20

16.99

and

51.00

52.00

1.00

11.60

58.10

12.57

LM-098-D

59.55

60.50

0.95

8.87

22.50

9.25

LM-099-D

53.50

57.45

3.95

15.97

41.60

16.66

including

55.10

56.40

1.30

29.89

52.25

30.76

Table 1; Initial results from La Manchuria 2103 exploration programme

*Intervals reported in the above table are not true thicknesses and are estimated to represent between 80-85% of the actual true thickness of mineralisation

** AuEq (gold equivalent) ratio is 60:1 Ag:Au

 

The mineralisation intersected in the eastern zone is hosted within a "Classic" low sulphidation mineralised style epithermal vein which is subvertical and outcrops at surface. The structure has been mapped at surface over a strike extent of greater than 400m. Follow up drilling is now being designed to test both along strike and down dip of hole LM-099-D as mineralisation has only been tested to a very shallow depth of 50m below the existing ground surface.

 

To date, the Company has completed 20,993 metres of diamond and reverse circulation drilling on this project. Patagonia Gold reported the following Canadian National Instrument (NI) 43-101 compliant resource in September 2010:

Indicated

Grade (g/t)

Metal (Oz)

Domain

Tonnes

Au

Ag

AuEq

Au

Ag

AuEq

Oxide

141,570

1.91

139.1

3.12

8,675

633,338

14,198

Hypogene

284,136

3.46

133.0

4.54

31,642

1,214,873

41,486

Total

425,705

2.95

135.0

4.07

40,317

1,848,211

55,684

Inferred

Grade (g/t)

Metal (Oz)

Domain

Tonnes

Au

Ag

AuEq

Au

Ag

AuEq

Oxide

496,179

1.33

42.5

1.66

21,138

678,485

26,462

Hypogene

972,840

1.64

53.0

2.05

51,197

1,656,751

64,220

Total

1,469,020

1.53

49.4

1.92

72,335

2,335,236

90,682

The following economic assumptions were used in calculating the AuEq grade of each block:

Gold Price: $US 925/oz Gold recovery: 95%

Silver Price: $US 14.50/oz Silver Recovery: 60%

Formulae:

1) Metal Value = Grade * Metal Price * Metallurgical Recovery * 0.032151

2) AuEq = (Au-Value + Ag-Value) / (Au-Price * 0.032151)

 

"Thomas C Stubens, M.A.Sc., P.Eng., a Senior Geologist with Micon International Limited and a Qualified Person as defined in Canadian National Instrument 43-101, was the author of the report entitled "Technical Report on the Mineral Resources of the La Manchuria Project, Santa Cruz Province, Argentina", prepared for Patagonia Gold SA, dated 15th September, 2010".

 

Management believes significant potential exists to substantially grow the resource base by changing the mineralisation focus from the thin, discontinuous high grade vein hosted model used for the above resource estimate to a lower grade bulk tonnage target. Preliminary re-evaluation work is underway. Should this study provide positive results, PGD will update the existing 43-101 compliant resource. The timeline for completion of this work is scheduled for Q4 2013.

 

Geochemical and geophysical programmes will also be undertaken during the second half of 2013 on both the La Manchuria property and the recently incorporated Manchuria South property.

 

CAP-OESTE-COSE:

The El Tranquilo property block, covering approximately 80,000 hectares, contains Patagonia Gold's flagship Cap-Oeste project, together with the COSE bonanza gold and silver deposit and numerous other prospects including Monte Leon.

 

Newfields Inc. of Reno, Nevada, USA has been contracted to lead the prefeasibility study to assess the economic viability of the combined Cap-Oeste-COSE deposits. Newfields will lead a team of potentially two to three different consulting houses in the completion of a comprehensive pre-feasibility level study on the project. Newfields will concentrate predominantly on design and testwork associated with the construction of the tailings storage facility (TFS) and water management plus the geotechnical studies for pit wall and underground mine design.

 

In May 2013 a single hole, CO-401-D, was drilled into an area 250 metres along strike to the north west of the main Cap-Oeste deposit where two previously drilled exploratory holes, CO-335-D and CO-387-D had intersected wide mineralised zones containing high grade gold and silver. CO-401-D successfully intersected similar mineralisation 50m down dip of CO-387-D confirming the presence of a potential new high grade gold and silver shoot. The shoot remains open along strike in both directions and down dip.

Hole ID

From

To

Length

Au

Ag

Au Eq

(m)

(m)

(m)

(g/t)

(g/t)

(g/t)

CO-335-D

353.50

381.80

28.30

4.11

25.51

4.53

CO-387-D

345.85

372.20

26.35

3.08

74.74

4.36

including

354.00

354.50

0.50

15.41

792.37

28.61

CO-401-D

374.70

417.20

42.50

2.12

57.41

3.08

including

383.10

384.60

1.50

16.39

363.42

22.45

Table 2; CO-335-D reported RNS 28th March 2012, CO-387-D and CO-401-D not previously reported.

*Intervals reported in the above table are not true thicknesses and are estimated to represent between 80-85% of the actual true thickness of mineralisation

** AuEq(gold equivalent) ratio is 60:1 Ag:Au, AuEq (ppm) for CO-335-D recalculated at 60:1 Ag:Au ratio

 

Follow up drilling will be designed to test the extension of this potential new shoot.

 

LA MANCHURIA SOUTH:

La Manchuria South properties are made up of the HAYDEE and RENE licence areas which are located 15 kilometres to the South of La Manchuria project and were part of the package of properties incorporated into PGSA land holdings through the Shareholders agreement with Fomicruz, the mining arm of the province of Santa Cruz (see RNS 26th October 2011).

 

Limited exploration has been completed to date on these properties. Samples taken in this first pass programme reported were predominantly repeats of samples taken by Fomicruz in the late 1990's which confirmed that mineralisation existed at the site. The main structure is covered by a volcano to the north west and open to the south east. A detailed geophysics and trench sampling programme is being designed and will be implemented in Q4 2013.

 

LOMADA DE LEIVA:

Production at Lomada de Leiva heap leach project reached planned level as of the end of June 2013. Construction of the main heap leach project continues with all earthworks complete and the liner placed on the drainage pond and the first cell. Lining of cells 2 and 3 will be carried out in August when weather conditions are more favourable. The plant expansion and welding of the main pipelines is under way and is scheduled for completion in Q3 2013. All mine facilities have now been constructed along with camp accommodation for mine staff and contractors.

The expansion of the existing trial pad has created sufficient capacity for full mine production until the end of September 2013, after which loading of the main heap leach pad will commence.

Ends

About Patagonia Gold

Patagonia Gold Plc is a mining company that seeks to grow shareholder value through exploration, development and production of gold and silver projects in the southern Patagonia region of Argentina. The Company is primarily focused on three projects: the flagship Cap-Oeste/COSE project, the La Manchuria project and the Lomada heap leach project, which is generating free cash flow. Patagonia Gold, indirectly through its subsidiaries or under option agreements, has mineral rights to over 220 properties in several provinces of Argentina and Chile, and is one of the largest landholders in the province of Santa Cruz.

Matthew Boyes, (BSC. Geology, Fellow AusIMM) Chief Operating Officer for Patagonia Gold PGSA and a qualified person as defined in Canadian National Instrument 43-101, has reviewed and verified all scientific or technical mining disclosure contained in this press release.

 

Contact Information

Bill Humphries, CEOPatagonia Gold PlcTel: +44 (0)20 7409 7444

David Bick / Mark LongsonSquare 1 Consulting+44 (0)20 7929 5599

Colin LanguedocBarnes Communications Inc.Tel: +1 (416) 367-5000

Angela Hallett/James SpinnyStrand Hanson LtdTel: +44 (0)20 7409 3494

Rory ScottMirabaud Securities LLPTel: +44 (0)20 7484 3510

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCEAKXDAESDEFF
Date   Source Headline
22nd Jul 201910:30 amRNSScheme of arrangement becomes Effective
22nd Jul 20197:30 amRNSSuspension - Patagonia Gold Plc
19th Jul 20191:00 pmRNSCourt Sanction of Scheme of Arrangement
17th Jul 20195:30 pmRNSPatagonia Gold
12th Jul 201912:26 pmRNSResults of Court Meeting and General Meeting
3rd Jul 20194:30 pmRNSForm 8.3 - Hunt Mining Corp./Patagonia Gold PLC
21st Jun 20191:48 pmRNSHolding(s) in Company Patagonia Gold Plc
20th Jun 201912:00 pmRNSPublication of Scheme Document
18th Jun 20197:00 amRNSRevision to the 2018 Financial Statements
13th Jun 20194:00 pmRNSForm 8 (OPD) Hunt Mining Corp./Patagonia Gold PLC
13th Jun 20194:00 pmRNSForm 8.3 - Hunt Mining Corp./Patagonia Gold PLC
13th Jun 20194:00 pmRNSForm 8.3 - Hunt Mining Corp./Patagonia Gold PLC
13th Jun 20194:00 pmRNSForm 8.3 - Hunt Mining Corp./Patagonia Gold PLC
13th Jun 20197:00 amRNSLoan Facility Amendment
11th Jun 20193:53 pmBUSForm 8.3 - Patagonia Gold Plc
10th Jun 20197:00 amRNSForm 8 (OPD) - Patagonia Gold plc
7th Jun 20194:30 pmRNSForm 8.3 - Patagonia Gold plc
31st May 20197:15 amRNSCalcatreu and Cap Oeste Mineral Resource Update
31st May 20197:00 amRNSOffer for Patagonia Gold plc by Hunt Mining Corp.
11th Apr 20197:00 amRNSFinal Results
1st Mar 20197:00 amRNSUS$15 million Loan Agreement
27th Feb 20197:00 amRNSDrill Results Calcatreu Project in Argentina
19th Feb 20197:00 amRNSOperations Update
13th Feb 20197:00 amRNSDrill Results - San Jose Project in Uruguay
18th Jan 20191:00 pmRNSProduction Update
18th Jan 20191:00 pmRNSProduction Update
28th Dec 20187:00 amRNSAcquisition of Exploration Properties
21st Dec 20187:00 amRNSSale of COSE Royalty Update
11th Dec 20184:30 pmRNSSale of COSE Royalty
10th Oct 20187:00 amRNSCap Oeste and Calcatreu Update
25th Sep 20187:00 amRNSHalf Yearly Financial Statements
6th Sep 201810:15 amRNSArgentine Export Tax
11th Jul 20187:00 amRNSCap Oeste Production Update
8th Jun 20187:00 amRNSCap Oeste Production Update
1st Jun 20187:00 amRNSReceipt of Balance Payment of COSE
21st May 20187:00 amRNSFinal Payment of Calcatreu Project
9th May 20182:21 pmRNSResult of AGM
27th Apr 20187:00 amRNSNotice of AGM
24th Apr 20182:18 pmRNSOperations Update
12th Apr 20187:00 amRNSProposed Capital Reorganisation and Notice of AGM
12th Apr 20187:00 amRNSFinal Results
26th Mar 20187:00 amRNSOperations Update
21st Feb 20187:00 amRNSOperations Update
1st Feb 20187:00 amRNSAcquisition of Calcatreu Deposit
18th Jan 201811:00 amRNSPrice Monitoring Extension
28th Dec 20177:00 amRNSDefinitive Agreement - Calcatreu Deposit
19th Dec 20177:00 amRNSGrant of Options
11th Dec 20177:00 amRNSCalcatreu Option
7th Dec 20174:38 pmRNSResult of General Meeting and Open Offer
21st Nov 20177:00 amRNSSubscription and Open Offer

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.