Watch the latest episode of focusIR Fireside Chats: Why Edinburgh Investment Trust Is Backing Turnaround Stocks for 2026 Growth. View here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPCI.L Regulatory News (PCI)

  • There is currently no data for PCI

Algerian Operational Update

3 Oct 2011 07:00

RNS Number : 3739P
Petroceltic International PLC
03 October 2011
 



 

Petroceltic International plc

Algeria Operational Update - AT-8 Produces Positive Test Results

 

Petroceltic International plc ("Petroceltic" or "the Company"), the upstream oil and gas exploration and production company focused on North Africa, the Middle East and the Mediterranean, is pleased to issue an update on operations at the Ain Tsila field on its Isarene permit (Blocks 228 & 229a) in south eastern Algeria. Petroceltic operates the permit with a 56.625% interest, Sonatrach holds a 25% interest, and Enel holds an 18.375% interest, pending final Government of Algeria ratification.

 

·; AT-8 well flows at 15.4 mmscf/d without fracture stimulation

·; Highest pre-frac flow rate achieved to date on Ain Tsila field

·; AT-9 drilling update

·; Delineation programme on schedule for year end completion

 

 

AT-8 well testing results update

 

The AT-8 well, a vertical well located in the north of the Ain Tsila field reached a total depth of 1,662m TVDSS on 22 August 2011. A gross Ordovician reservoir interval of 121m was penetrated with 33m of net sand and 24m of interpreted net pay.

 

Following the logging three separate open-hole zones were isolated for individual testing. All three zones have now been tested without fracture stimulation ("fraccing"), and the test results are set out below.

 

Zone

Choke setting

64ths"

 

Gas rate

MMscf/d

FWHP

PSIG

Condensate

bpd

Water

bpd

Upper

80

6.5

256

119

0

Upper

64

5.4

306

99

0

Upper

32

5.0

1,054

116

0

Middle

72

6.5

312

112

8

Middle

48

5.9

594

126

0

Middle

32

4.8

1,015

133

9

Lower

32

2.4

582

122

22

Lower

16

1.8

1,497

115

0

 

The cumulative maximum rate for the three zonal tests is 15.4 mmscf/d.

 

The AT-8 well is now being prepared for fracture stimulation in the Upper zone and a further announcement will be made in due course.

 

The AT-8 well was designed to appraise a pop-up feature with a mapped fault system and to test the extent of the hydrocarbon column in the north of the field. The well, which is the first well to be drilled with the KCA Deutag Rig T-211, is located 5km north east of AT-1 and 4.5km north west of the AT-5 well in an undrilled section of the field.

 

AT-9 operational update

 

The AT-9 well was spudded on 12 September and is now drilling ahead, towards a planned total along hole depth of 2,494m. The well, which is the 6th in the current appraisal programme, is currently ahead of schedule.

 

AT-9 is a horizontal appraisal well and is located towards the centre of the Ain Tsila field 4.3km north east of the AT-2 appraisal well and 7.8km south east of the AT-1 discovery well. The planned horizontal section within the Ordovician reservoir is up to 390m long.

 

It is anticipated that AT-9 will take about 60 days to drill. The well will then be completed prior to being suspended for testing. Testing will be carried out with the rigless testing unit once it has completed operations on AT-7, which is currently anticipated to be around the middle of November 2011.

 

Brian O'Cathain, Chief Executive of Petroceltic commented:

 

"We are delighted to have achieved such excellent flow results from the Ordovician reservoir at AT-8 without fracture stimulation. These results confirm the potential for good productivity towards the north of the field, are likely to have a positive impact on our estimate of recoverable gas reserves and are very encouraging for the ultimate commercial development of Ain Tsila. They will be incorporated into the Final Discovery Report, (Field Development Plan), which we plan to submit to the Algerian competent authorities by the end of January 2012.

 

Our appraisal programme is continuing at a rapid pace with further results from AT-8, the AT-7 well test results, and the AT-9 well logging and testing scheduled before year end."

 

 

 

Ends

For further information, please contact:

 

Brian O' Cathain / Tom Hickey, Petroceltic International Tel: +353 (1) 421 8300

Philip Dennis / Rollo Crichton-Stuart,

Pelham Bell Pottinger Tel: +44 (20) 7861 3919

Joe Murray / Joe Heron, Murray Consultants Tel: +353 (1) 4980300

Hugh McCutcheon / John Frain, Davy Tel: +353 (1) 679 6363

 

Dr. Dermot Corcoran, Head of Exploration, Petroceltic International plc, is the qualified person who has reviewed and approved the technical information contained in this announcement. Dr. Corcoran has a B.Sc in Geology, a M.Sc. in Geophysics, and a Masters degree in Business Administration, all from the National University of Ireland, Galway. He also holds a Ph.D in Geology from Trinity College, Dublin. Dr. Corcoran has over 20 years experience in oil & gas exploration and production, and has previously worked at ExxonMobil, the Petrofina Group, and Statoil.

 

Glossary

 

 

Bpd: Barrels per day

Choke setting 64"s: The choke setting in diameter, measured in 64ths of one imperial inch.

MMscf/d: Million standard cubic feet per day

FWHP PSIG: Flowing well head pressure in pounds per square inch (gauge)

TVDSS: True vertical depth sub-sea in metres

 

 

Notes to Editors:

 

Petroceltic International plc is a leading Upstream Oil and Gas Exploration and Production Company, focused on North Africa, the Middle East and the Mediterranean, and listed on the London Stock Exchange's AIM Market and the Irish Stock Exchange's ESM Market. The Company has exploration and appraisal assets in Algeria, the Kurdistan Region of Iraq and Italy.

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLLLFSTILLFIIL
Date   Source Headline
16th Jun 20144:10 pmRNSFurther Adjournment of EGM
16th Jun 20149:45 amRNSEquity Placing and EGM Update
9th Jun 20142:56 pmRNSEGM Adjournment
6th Jun 20145:44 pmRNSAdjournment of EGM
30th May 20145:08 pmRNSHolding(s) in Company
30th May 20147:00 amRNSNotice of AGM
30th May 20147:00 amRNSResponse to Worldview Announcements
30th May 20147:00 amRNSOperations Update
30th May 20147:00 amRNS2013 Annual Financial Report & Notice of AGM
29th May 20145:01 pmRNSHolding(s) in Company
27th May 20142:52 pmRNSWorldview Announcements
27th May 20147:00 amRNSHolding(s) in Company
22nd May 20142:57 pmRNSHolding(s) in Company
21st May 20147:00 amRNSEnterprise Securities Market Notice
20th May 20142:22 pmRNSHolding(s) in Company
16th May 20145:00 pmRNSPosting of Circular
16th May 201410:12 amRNSResult of Placing
16th May 20147:00 amRNSPlacing
16th May 20147:00 amRNSPreliminary Results
9th May 20144:23 pmRNSHolding(s) in Company
8th May 20147:00 amRNSOperations Update
10th Apr 201410:43 amRNSHolding(s) in Company
8th Apr 201411:13 amRNSHolding(s) in Company
7th Apr 201412:39 pmRNSKurdistan Operational Update
2nd Apr 201411:22 amRNSHolding(s) in Company
18th Mar 20145:36 pmRNSHolding(s) in Company
18th Mar 20142:35 pmRNSHolding(s) in Company
28th Feb 201410:26 amRNSHolding(s) in Company
13th Feb 20147:00 amRNSAlgeria Farmout Update
14th Jan 20147:00 amRNSEnterprise Securities Market Notice
8th Jan 20142:59 pmRNSIssue of Equity
7th Jan 20147:00 amRNSOperational Update and Guidance
13th Dec 20137:00 amRNSRomanian Exploration Drilling
14th Nov 20137:00 amRNSRomanian Drilling Update
9th Oct 201312:28 pmRNSHolding(s) in Company
7th Oct 20137:00 amRNSAlgeria Farmout Process Update
16th Sep 20132:50 pmRNSDirector/PDMR Shareholding
16th Sep 20137:00 amRNSAppointment of Non-Executive Director
16th Sep 20137:00 amRNSBulgarian Operational Update
9th Sep 20137:00 amRNSInterim Results and Operational Update
2nd Sep 20137:00 amRNSKurdistan and Romania Drilling Campaigns Commence
15th Aug 20134:35 pmRNSPrice Monitoring Extension
9th Aug 20135:36 pmRNSHolding(s) in Company
2nd Aug 20134:34 pmRNSEnel Receivable Determination
12th Jul 20137:00 amRNSAward of New Greek Licence
5th Jul 20137:00 amRNSIssue of Legal Proceedings
3rd Jul 20137:29 amRNSItalian Operational Update
12th Jun 20134:02 pmRNSHolding(s) in Company
7th Jun 20137:00 amRNSBoard Change
30th May 20133:10 pmRNSResults of AGM and Withdrawal from Scheme

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.