Watch the latest episode of focusIR Fireside Chats: Why Edinburgh Investment Trust Is Backing Turnaround Stocks for 2026 Growth. Viewhere

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksORM.L Regulatory News (ORM)

  • There is currently no data for ORM

Drilling Update

2 Jun 2005 07:01

Ormonde Mining PLC02 June 2005 02 June 2005 Ormonde Mining plc La Zarza Drilling Update DUBLIN & LONDON: 02 June 2005 - Ormonde Mining plc ("Ormonde" or "the Company")announces the completion of its initial drilling programme at its La ZarzaGold-Copper Project in southwest Spain and reports assay results received forholes ORM1, ORM4 and ORM5. The Company also outlines the scope of ongoing andforthcoming work programmes. DRILLING PROGRAMME Seven holes have been drilled over a strike length of some 500 metres, for atotal of 2,530 metres. These holes were principally designed to obtainrepresentative samples for metallurgical testwork from both gold and copperresources hosted within the "Silicatado" unit. All holes intersected theSilicatado, with details as follows: Hole From Width Approx. True Width ORM1 57 34 34 ORM2 257 56 40 ORM3 370 17 15 ORM4 358 26 24 ORM5 161 33 30 ORM6 325 29 20 ORM7 113 112 80 Gold and multi-element assay results have been received from holes ORM1, ORM4and ORM5, with the results from the other four holes pending. In a preliminaryinterpretation of the results, intersections presented below have beenclassified by mineralization type and gold equivalent grade is also given forcomparative purposes: Hole From Width Type Au g/t Ag g/t Cu % Au equiv. ORM5 163.0 17.0 Gold 4.1 40.5 0.4 5.6 ORM1 77.0 6.0 Copper-Gold 1.2 52.0 2.0 6.3 ORM4 357.8 11.2 Copper 0.3 25.4 2.1 5.2 (Notes: All lengths are in metres. Widths are approximately true width. Au =gold, Ag = silver, Cu = copper. Gold equivalents are based on in-situ metalvalues using the following prices: $400/oz Au, $7/oz Ag, $2,700/t Cu). Managing Director of Ormonde, Kerr Anderson commented, "Our programmes are progressing as planned at La Zarza with drillingintersecting anticipated intervals of continuous gold, silver and/or coppermineralization, and we look forward to advancing through the next stages of theproject. In addition to the metallurgical testwork and subsequent economicscoping study, we will be maintaining the momentum of the drilling throughoutthe coming months to investigate previously untested extensions to the currentresources." METALLURGICAL TESTWORK PROGRAMME Investigative testwork on composite core samples from both the gold and copperSilicatado will commence at Wardell Armstrong International, UK, upon receipt ofall assay results. The testwork will be designed to determine gold, silver andcopper recoveries achievable by variable-sized grinding, flotation and cyanideleaching. Oxidative stages will also be investigated as a possible route to amaximum gold recovery. Results from the testwork will be incorporated into an economic scoping studywhich will cost the various mining and processing options available to take LaZarza to production. DATA COMPILATION AND RESOURCE ESTIMATION All previous drilling and underground assay data and geological information havebeen compiled to generate a 3-dimensional model of the deposit and an initialblock model using Datamine software. Extensive existing underground development,which could significantly reduce capital costs and development lead times, hasalso been captured as part of the data model. A new resource estimate using varying gold and copper cut-off grades will beprepared upon receipt and interpretation of all assay data from the drillingprogramme. Resources will be classified using the guidelines provided by TheJORC Code (2004). BACKGROUND TO THE LA ZARZA PROJECT Ormonde is currently earning a 70 per cent interest in the La Zarza Project byfunding programmes to the value of €1.8 million during a three year period,under an option agreement with the property owner, Nueva Tharsis S.A.L., signedin June 2004. Ormonde's focus at La Zarza is on inferred resources of 5.9 Mt grading 5.0 g/tgold and 50 g/t silver (950,000 ounces of gold, 9.5 million ounces of silver),and an adjacent copper resource of 2.9 Mt grading 2.8 % copper (81,000 tonnes ofcopper). These resources are hosted by the "Silicatado" rock type. All resourcesare open laterally and at depth, and the total mineralized system at La Zarzahas a strike length of over three kilometres. The deposit is situated within an existing Mining Concession, and the Companyhas received early indications of local government support including grants forinvestigation works. Enquiries to: Kerr Anderson, Managing Director, Ormonde Mining plc Tel: +353 (0)46 9073623 Fraser Gardiner, Investor and Media Relations, Ormonde Mining plc Mobile: +353 (0)86 3931178 Simon Rothschild, Bankside Consultants Tel: +44 (0)207 444 4153 Mobile: +44 (0)7703 167065 ENDS BACKGROUND INFORMATION Ormonde Mining is quoted on the AIM and IEX markets in London and Dublin,respectively. The Company is focused on acquiring and developing gold projectsin Spain where it has a strong local Spanish management team, supported by aBoard with extensive exploration expertise in the region and mine developmentexperience. For more information and contact details including email, please visitwww.ormondemining.com. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
4th Jun 20202:50 pmRNSHolding(s) in Company
15th May 20207:00 amRNSBusiness Update, Salary Reductions, Options Grant
8th Apr 20207:00 amRNSFinal Results
30th Mar 20204:41 pmRNSSecond Price Monitoring Extn
30th Mar 20204:37 pmRNSPrice Monitoring Extension
30th Mar 202011:00 amRNSPrice Monitoring Extension
13th Mar 202011:15 amRNSHolding(s) in Company
9th Mar 20207:55 amRNSDirector/PDMR Shareholding
17th Feb 20207:00 amRNSCompletion of Disposal
13th Feb 20201:53 pmRNSEGM Results
10th Feb 20207:00 amRNSDirectorate Change
27th Jan 20204:39 pmRNSPublishing of Circular and Proposed Board Changes
10th Jan 20203:58 pmRNSHolding(s) in Company
8th Jan 20204:41 pmRNSSecond Price Monitoring Extn
8th Jan 20204:36 pmRNSPrice Monitoring Extension
8th Jan 20202:05 pmRNSSecond Price Monitoring Extn
8th Jan 20202:00 pmRNSPrice Monitoring Extension
8th Jan 202012:58 pmRNSProposed Disposal
27th Dec 201911:05 amRNSSecond Price Monitoring Extn
27th Dec 201911:00 amRNSPrice Monitoring Extension
25th Nov 20197:00 amRNSOperational Update
24th Oct 20193:15 pmRNSHolding(s) in Company
24th Oct 20193:14 pmRNSHolding(s) in Company
17th Oct 20197:00 amRNSSaloro Financing Update
30th Sep 20197:00 amRNSInterim Results
23rd Sep 20193:31 pmRNSResult of AGM
20th Sep 20197:00 amRNSBarruecopardo Tungsten Mine Update
27th Jun 20192:49 pmRNSAnnual Financial Report
19th Jun 20197:00 amRNSFinal Results
23rd May 20197:00 amRNSBarruecopardo Update
26th Feb 20197:00 amRNSBarruecopardo Project Update
14th Dec 20187:00 amRNSBarruecopardo Tungsten Project Update
11th Oct 20183:14 pmRNSChange of Registered Office
27th Sep 20183:53 pmRNSResult of AGM
27th Sep 20187:00 amRNSInterim Results for six months ended 30 June 2018
12th Sep 20187:00 amRNSBarruecopardo Tungsten Project Update
27th Jun 201812:19 pmRNSAnnual Financial Report
19th Jun 20187:00 amRNSFinal Results
17th Jan 201811:58 amRNSGranting of Options
28th Nov 20177:00 amRNSBarruecopardo Tungsten Mine Construction Update
6th Oct 20174:07 pmRNSHolding(s) in Company
28th Sep 20177:00 amRNSInterim Results 2017
18th Sep 20172:09 pmRNSResult of AGM
5th Sep 20177:00 amRNSBarruecopardo Tungsten Project
28th Jun 20177:00 amRNSPublication of Annual Report
20th Jun 20177:00 amRNSFinal Results for the year ended 31 December 2016
2nd Jun 20177:00 amRNSBarruecopardo Project Update
22nd Dec 201612:36 pmRNSBarruecopardo Tungsten Project
6th Oct 20166:04 pmRNSGranting of Options
30th Sep 20167:00 amRNSInterim Results 2016

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.