Less Ads, More Data, More Tools Register for FREE

Pin to quick picksNUOG.L Regulatory News (NUOG)

  • There is currently no data for NUOG

GSH Operational Update

31 Mar 2010 07:00

RNS Number : 4628J
Enegi Oil PLC
31 March 2010
 



Enegi Oil Plc

('Enegi' or 'the Company')

 

Garden Hill South Operational Update

 

Highlights:

·; Swabbing exercise to be undertaken to establish inflow rates from reservoir to well

·; Swabbing to take place prior to foam/acid frac

·; Suitable units for both have already been identified by DLMC

·; Enegi carried through swabbing costs

·; Well is economic at around 60bpd on current operational costs and WTI prices

 

Dragon Lance Management Corporation (DLMC), the Company's partner in the development of the the PAP1 ST#3 well, has provided an update of operations on Garden Hill South.

As part of the test programme currently being performed on the PAP1 ST#3 well, a swabbing exercise will take place to establish inflow rates from reservoir to the well. The inflow rate will give an indication of the continuous flow rate that can be expected from the well, prior to foam/acid frac. In addition, it will also add to our understanding concerning well performance, which will provide valuable input into the design of the foam/acid frac programme. The swabbing exercise is the final part of the test programme.

The swabbing process alone may enable the well to flow continuously; although the production rate is unlikely to be as high as post acid/frac. On current operational costs and WTI prices, even a continuous production rate as low as 60 barrels per day would make the well economical.

DLMC has identified a swabbing unit suitable for performing the exercise, and are currently in discussions to mobilise the swabbing unit to site over the coming weeks. The swabbing unit contractor has confirmed they would supply the needed personnel to operate the unit. Costs associated with the entire swabbing exercise will be borne by DLMC.

The foam/acid frac programme will commence imminently following the end of the test programme. DLMC has informed the Company that it has already identified a suitable contractor and coiled tubing unit (CTU) for foam/acid fraccing the well.

In carbonate reservoirs such as GHS, it is common that wells need to be stimulated using various fraccing techniques. Tests on the well to date have confirmed that the wellbore pressure declines when the well is flowed, but recovers when the well is shut-in. This indicates that the well can produce on an interval basis, and significantly, that the wellbore is in contact with a large volume of oil, but that connectivity is poor. Therefore, if the connectivity between the wellbore and reservoir can be improved, the well will produce at commercial rates on a sustainable basis. The intention is to achieve this by performing a foam/acid frac using a CTU.

An acid frac could make the well flow economically without the need to continuously swab the well, it may also substantially increase the continuous production rate that is achieved by swabbing alone. The contractor that DLMC has identified for the foam/acid frac has indicated that significant enhancement in flow rates can be achieved using the technique.

Prior to the acid/frac, the CTU will be used to run a suite of electrical logs in the well, which will give a better insight into reservoir characteristics such as porosity and permeability data. These logs will be used for geological and petrophysical analysis, to estimate the In Place Volume (IPV) with a much higher level of certainty. Such logs will also help the company to identify fracture networks and any minor faulting that may affect well performance. These logs will also give a broader dataset knowledge and understanding for possible further drilling activities into the same reservoir in the future. Mobilisation dates for the CTU and operational personnel will be finalised after the test programme.

In the event the well produces consistently on a commercial basis, the Company will be able to book the calculated reserves in contact with the well.

 

Alan Minty, CEO of Enegi Oil commented:

"We are delighted with the progress that we, and DLMC, are making. These developments should further increase our understanding of the well and the geology as we strive to achieve continuous production.

We look forward to receiving and providing further updates over the coming weeks."

 

31 March 2010

 

Enquiries:

 

Enegi Oil

Tel: + 44 161 817 7460

Alan Minty, Chairman

Cenkos Securities

 Tel: + 44 207 397 8900

Joe Nally

Stephen Keys

Fox-Davies Capital

Tel: + 44 207 936 5200

Daniel Fox-Davies

College Hill

Tel: + 44 207 457 2020

Nick Elwes

 

 

www.enegioil.com

 

Qualified Persons

 

The information in this release has been reviewed by Barath Rajgopaul MSc (Mech. Eng.) C. Eng, a director of Enegi. Mr. Rajgopaul has over 25 years experience in the petroleum industry.

 

The Company

 

Enegi Oil Plc is an independent oil and gas group whose objective is the identification, development and operation of hydrocarbon opportunities. The Group's current operations are focused on assets on and around the Port au Port Peninsula in Newfoundland, which, although lightly explored, is in an active petroleum system with light oil having previously been discovered there. The Group's assets include Garden Hill South, Shoal Point, Garden Hill Central, Garden Hill North and Lourdes.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCQBLFXBXFFBBQ
Date   Source Headline
22nd Dec 20097:09 amRNSOption with CIVC exercised
22nd Dec 20097:09 amRNSFinal Results
15th Dec 20097:00 amRNSCorporate Update & Placing
11th Dec 20094:25 pmRNSHolding(s) in Company
20th Nov 20097:00 amRNSInterest Swap
16th Nov 20093:06 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
3rd Nov 200912:45 pmRNSRecommencement of Operation
30th Oct 20093:34 pmRNSHolding(s) in Company
23rd Oct 20091:32 pmRNSHolding(s) in Company
23rd Oct 20091:28 pmRNSHolding(s) in Company
16th Oct 20091:01 pmRNSHolding(s) in Company
16th Oct 20091:00 pmRNSHolding(s) in Company
13th Oct 200910:39 amRNSHolding(s) in Company
12th Oct 20094:36 pmRNSDirector/PDMR Shareholding
9th Oct 20093:10 pmRNSHolding(s) in Company
1st Oct 20097:00 amRNSResumption of Operations
18th Sep 200912:11 pmRNSHolding(s) in Company
18th Sep 20099:01 amRNSHolding(s) in Company
18th Sep 20098:59 amRNSHolding(s) in Company
18th Sep 20098:57 amRNSHolding(s) in Company
16th Sep 200912:41 pmRNSTotal Voting Rights
15th Sep 20092:36 pmRNSResult of General Meeting
28th Aug 20097:00 amRNSPlacing
25th Aug 200912:04 pmRNSStmnt re Share Price Movement
17th Jul 20097:00 amRNSOperational & Corporate Update
15th May 20097:00 amRNSBoard Changes
3rd Apr 20093:13 pmRNSStmnt re Share Price Movement
31st Mar 20097:00 amRNSInterim Results
24th Mar 20097:00 amRNSBoard Changes
6th Mar 20097:00 amRNSRe: Directorate
2nd Mar 20097:56 amRNSResult of AGM
16th Feb 20097:00 amRNSOperational & corporate update
9th Feb 20097:03 amRNSOperational Update
6th Jan 20097:00 amRNSGarden Hill South Drilling Update
31st Dec 20087:00 amRNSPosting of report and accounts
19th Dec 200810:50 amRNSDrilling update
3rd Dec 20087:00 amRNSLicense Award
25th Nov 20087:00 amRNSDrilling Update
3rd Nov 20087:00 amRNSGarden Hill South Update
8th Oct 20087:00 amRNSDrilling Update
7th Oct 20087:00 amRNSDirector/PDMR Shareholding
2nd Oct 20087:00 amRNSDirector/PDMR Shareholding
30th Sep 20086:00 pmRNSPreliminary Results
12th Aug 20087:00 amRNSGarden Hill South Update
25th Jul 20087:00 amRNSDirector/PDMR Shareholding
23rd Jul 20084:00 pmRNSDirector/PDMR Shareholding
23rd Jul 20087:00 amRNSDirector/PDMR Shareholding
22nd Jul 20087:00 amRNSDrilling Update
3rd Jul 20087:00 amRNSGreen Point Shale Rpt
3rd Jun 20087:30 amRNSActivities Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.