NORNICKEL ANNOUNCES PRODUCTION RESULTS FOR 4Q AND FY2020

29 Jan 2021 10:04

MMC Norilsk Nickel (MNOD) NORNICKEL ANNOUNCES PRODUCTION RESULTS FOR 4Q AND FY2020 29-Jan-2021 / 13:04 MSK Dissemination of a Regulatory Announcement that contains inside information according to REGULATION (EU) No 596/2014 (MAR), transmitted by EQS Group. The issuer is solely responsible for the content of this announcement.


 PRESS RELEASE

Public Joint Stock Company «Mining and Metallurgical Company «NORILSK NICKEL» (PJSC "MMC "Norilsk Nickel", "Nornickel" or the "Company") 

NORNICKEL ANNOUNCES PRODUCTION RESULTS FOR 4Q AND FY2020

Moscow, 29 January, 2021 - Nornickel, the world's largest producer of palladium and high-grade nickel and a major producer of platinum and copper, announces preliminary consolidated production results for the fourth quarter and the full year of 2020 and reiterates its production outlook for the full year 2021.

First Vice-President, Chief Operating Officer, Sergey Dyachenko commented on the production results,

«The Company fully met its 2020 production guidance despite some unprecedented environmental and epidemiological challenges.

Total nickel output came in line, while platinum group metals production exceeded the guidance owing mainly to productivity improvements and successful ramp-up of the refining shop at Kola MMC after its upgrade to a new chlorine leaching technology.

Copper output was also within the guidance driven by the scheduled ramp-up of Bystrinsky (Chita) project that reached its design capacity for all metals in 4Q 2020.

Nornickel has achieved a material progress in the clean-up of the fuel spill incident in Norilsk. By now we have completed the main phase of the clean-up. We continue developing the most effective approach for the rehabilitation of the contaminated soil and restoration of the damaged ecosystem in close cooperation with all stakeholders.

In the second half of the last year, a unique Great Norilsk Expedition, which was comprised of 30 scientists form 14 leading research institutes of the Siberian Branch of Russian Academy of Sciences, completed its fieldwork in the Norilsk region. Based on the results of the research, a report was published providing an independent assessment of the fuel spill impact on the local environment and recommendations for the most efficient rehabilitation of the disturbed area.

Reduction of the Company's environmental impact remains our absolute strategic priority and we reiterate our commitment to radically improve the environmental situation in the regions of our operations.

In particular, in December 2020, smelting facilities of Kola MMC located in the town of Nickel in Russia's Murmansk region, were shut down as scheduled. As a result, sulphur dioxide emissions at the cross-border area with Norway have been completely eliminated, while overall sulphur dioxide emissions at Kola MMC were down by more than 50% in 2020 and should reduce by 85% in 2021 comparing to 2015 level.

Finally, I would like to highlight that Nornickel is making all necessary arrangements to protect the health and safety of its employees from the impact of COVID-19. The epidemiological situation at our operating sites remains well under control, with the epidemic not having any material impact on Company's operations.

We reiterate our production guidance from own Russian feed for FY2021 as announced at the Capital Markets Day in December 2020».

 

NORILSK NICKEL GROUP

Nickel

In 4Q20, consolidated nickel production increased 13% quarter-on-quarter (q-o-q) to 68 kt, almost all of which were produced from the Company's own Russian feed (67 kt, +12 q-o-q). The growth was attributed to the gradual ramp-up of nickel refinery at Kola MMC, which is using new chlorine-leaching technology, increase of production of nickel concentrate for sale and a low base effect of the previous quarter, when Norilsk Nickel Harjavalta refinery was undergoing annual scheduled maintenance and repairs.

In 2020, consolidated nickel production increased 3% year-on-year (y-o-y) to 236 kt primarily owing to increase in production of nickel concentrate for sale at Kola MMC and higher processing volumes of the Company's Russian feed at Norilsk Nickel Harjavalta.

Nickel output from the Company's own Russian feed amounted to 233 kt, near the top end of the 225-235 kt production guidance for 2020.

Copper

In 4Q20, consolidated copper production increased 8% q-o-q to 129 kt, almost all of which were produced from own Russian feed. The growth was attributed to increased mined ore volumes at the Polar Division, expansion of copper production and higher copper grades at Bystrinsky (Chita) Project and shipment of copper cake from Norilsk Nickel Harjavalta to Boliden.

In 2020, consolidated copper production decreased 2% y-o-y to 487 kt. The decline was attributed to changes in saleable product mix, reallocation of copper intermediates within the Company's divisions and lower processed volumes of concentrate, which was purchased from Rostec.

Copper output from the Company's own Russian feed (excluding Bystrinsky project) amounted to 424 kt, which was in line with 420-440 kt production guidance range for 2020. Copper output at Bystrinsky GOK increased 44% y-o-y to 63 kt, which was at the top end of the 60-63 kt production guidance for the asset.

Platinum Group Metals

In 4Q20, palladium and output reduced 1% q-o-q to 773 koz and 5% q-o-q to 182 koz, respectively, almost all of which were produced from the Company's own Russian feed. The decrease of PGMs output was attributed to the commissioning of the new precious metals concentrate production line at the metallurgical shop of Kola MMC and termination of temporary processing of chlorine leaching residues at the facilities of the Polar Division.

In 2020, palladium and platinum output reduced 3% y-o-y to 2,826 koz and 1% y-o-y to 695 koz, respectively, owing to the commissioning of the new precious metals concentrate production line at the metallurgical shop of Kola MMC, as well as high base effect of 2019, when Krasnoyarsk Precious Metals Plant processed earlier accumulated work-inprogress inventory.

In 2020, palladium and platinum output from the Company's own Russia feed amounted to 2,820 koz and 693 koz, respectively, which was above the production targets for palladium of 2,648-2,777 koz and 611-675 koz for platinum.

RUSSIAN OPERATIONS

In 2020, all saleable metals produced by the Company's Russian operations were from their own feed.

Nickel

In 4Q20, nickel output at Kola MMC increased 6% q-o-q to 50 kt. The increase was attributed to the scheduled ramp-up of nickel refinery at Kola MMC operating new chlorine leaching technology as well as higher production of nickel concentrate for sale.

In 2020, Kola MMC's nickel production increased 4% y-o-y to 172 kt, including 18 kt (+41% y-o-y) of nickel concentrate for sale to third parties. As part of strategic diversification of sales into premium products, carbonyl nickel production at Kola MMC increased 2% y-o-y to 4 kt.

Copper

In 4Q20, copper output at the Company's operations in Russia increased 8% q-o-q to 128 kt. owing to the increase in mined ore volumes at Polar Division, as well as the ramp-up of Bystrinsky (Chita) Project and higher mined copper grades there.

In 2020, the Company's copper output in Russia remained practically unchanged at 485 kt, including 63 kt in copper concentrate (+44% y-o-y) of Bystrinsky (Chita) Project .

Platinum Group Metals

In 4Q20, the Company's palladium and platinum output in Russia reduced 2% q-o-q to 766 koz and 5% q-o-q to 180 koz, respectively. Lower production was attributed to the start of processing of chlorine-leaching residues in-house at Kola Division following the ramp-up of new precious metals concentrate production line at the metallurgical shop at Kola MMC and termination of temporary processing of chlorine leaching residues at the facilities of the Polar Division.

In 2020, palladium and platinum output reduced 2% y-o-y to 2,809 koz and increased marginal 0,2% y-o-y to 691 koz, respectively. The decrease in palladium production and an insignificant increase in platinum production were attributed to the ramp-up of the new precious metals concentrate production line at the metallurgical shop at Kola MMC, where precious metal concentrates are produced from residues of chlorine leaching, the feed coming from the new chlorine leaching nickel refinery at Kola MMC. During the ramp-up phase, concentrates of precious metals, which were produced at Kola MMC, were shipped for processing to Polar Division, which led to increase of work-in-progress materials in transit. Another reason for palladium production being small down y-o-y was the high base effect of 2019, when Krasnoyarsk Precious Metals Plant processed earlier accumulated work-inprogress inventory.

NORILSK NICKEL HARJAVALTA (FINLAND)

Nickel

In 4Q20, Norilsk Nickel Harjavalta increased its nickel production 38% q-o-q to 18 kt, primarily due to a low base effect of the previous quarter, when the refinery was undergoing scheduled repairs and maintenance.

In 2020, Harjavalta increased its nickel output 1% y-o-y to 63 kt owing to a slight increase in volumes of Russian feed shipped for processing.

Copper

In 4Q20, Norilsk Nickel Harjavalta increased copper output 3-fold to 841 t, which was driven by the deliveries of copper cake to Boliden to meet contractual obligations.

In 2020, copper output at Harjavalta decreased 81% y-o-y to just over 2 kt, owing to the shipment of copper cake to Copper Plant of the Polar Division for further refining.

Platinum Group Metals

In 4Q20, Harjavalta's output of saleable palladium and platinum (both contained in copper cake) amounted to 7 koz (a 3-fold increase q-o-q) and 2 koz (a 2- fold increase q-o-q), respectively. The increase was attributed to the deliveries of copper cake to Boliden to meet contractual obligations.

In 2020, Harjavalta's output of palladium and platinum reduced 69% y-o-y to 17 koz and 68% y-o-y to 4 koz, respectively, due to shipment of copper cake (containing PGMs) to Copper Plant of the Polar Division for further refining.

NKOMATI (SOUTH AFRICA) (*)

In 2020, Nkomati (50% - owned by Norilsk Nickel) produced 6 kt of nickel (-10% y-o-y), 3 kt of copper (-16% y-o-y), 30 koz of palladium (-8% y-o-y) and 13 koz of platinum (-8% y-o-y). The decrease in metal production was attributed to the mine being put on care and maintenance as scheduled and depletion of the existing open pit reserves.

Note: (*) Nkomati production results are not consolidated in the Group's total operating results.

 

Production Guidance from the Company's Russian feedstock for 2021:

Metal

Volume

Norilsk Nickel Group (excluding Chita)

Ni, kt

220-230

Cu, kt

390-410

Pd, koz

2,715-2,843

Pt, koz

647-711

Bystrinsky (Chita) Copper Project (1)

Cu, kt

65-70

Au, koz

230-240

Note: 1. Norilsk Nickel Group owns 50.01% of Bystrinsky GOK (Chita Copper Project). Production results are shown metal in concentrate for sale on 100% basis and fully consolidated in total operational results. The concentrator at the Bystrinsky project was launched 2019.

 

NORILSK NICKEL GROUP SALEABLE METALS PRODUCTION 1

 

4Q 2020

3Q 2020

Q-o-Q

FY

2020

FY

2019

Y-o-Y

Total nickel

t

67,956

60,165

13%

235,709

228,687

3%

 including from own Russian feed

t

66,547

59,414

12%

232,532

225,204

3%

Total copper

t

128,598

118,674

8%

487,186

499,119

-2%

 including from own Russian feed

t

128,369

118,623

8%

486,816

498,838

-2%

Total palladium

koz

773

783

-1%

2,826

2,922

-3%

 including from own Russian feed

koz

769

782

-2%

2,820

2,919

-3%

Total platinum

koz

182

190

-5%

695

702

-1%

 including from own Russian feed

koz

180

190

-5%

693

700

-1%

Polar Division and Kola MMC (Russia)

 

 

 

 

 

 

 

Nickel

t

50,419

47,483

6%

172,357

166,265

4%

 Kola MMC, including

t

50,419

47,483

6%

172,357

166,265

4%

refined Ni from own Russian feed

t

42,323

40,879

4%

154,402

153,558

1%

saleable intermediate products from own Russian feed

t

8,096

6,604

23%

17,955

12,707

41%

from 3d parties feed

t

0

0

-

0

0

-

Copper

t

110,872

102,901

8%

422,031

442,682

-5%

 Polar Division

t

89,029

85,961

4%

351,413

355,706

-1%

 Kola MMC, including

t

21,843

16,940

29%

70,618

86,976

-19%

Cu cathodes from own Russian feed

t

19,741

14,280

38%

64,731

75,093

-14%

saleable intermediates from own Russian feed

t

2,102

2,б60

-21%

5,887

11,883

-50%

from 3d parties feed

t

0

0

-

0

0

-

Palladium

koz

766

780

-2%

2,809

2,868

-2%

 Polar Division

koz

300

330

-9%

1,180

1,042

13%

 Kola MMC, including

koz

466

450

4%

1,630

1,826

-11%

from own Russian feed

koz

466

450

4%

1,630

1,826

-11%

from 3d parties feed

koz

0

0

-

0

0

-

Platinum

koz

180

190

-5%

691

690

0,2%

 Polar Division

koz

78

81

-4%

302

251

20%

 Kola MMC, including

koz

102

109

-6%

390

439

-11%

from own Russian feed

koz

102

109

-6%

390

439

-11%

from 3d parties feed

koz

0

0

-

0

0

-

Bystrinsky GOK ( Russia, Zabaykaisky Krai) 2

 

 

 

 

 

 

 

Copper

t

16,885

15,520

9%

62,664

43,489

44%

Gold

koz

65

62

5%

241

177

36%

Iron ore concentrate

kt

580

594

-2%

2,046

1,311

56%

Norilsk Nickel Harjavalta (Finland)

 

 

 

 

 

 

 

Nickel, including

t

17,537

12,682

38%

63,352

62,422

1%

from own Russian feed

t

16,128

11,931

35%

60,175

58,939

2%

from 3d parties feed

t

1,409

751

88%

3,177

3,482

-9%

Copper, including

t

841

253

232%

2,491

12,948

-81%

from own Russian feed

t

612

202

203%

2,121

12,667

-83%

from 3d parties feed

t

229

51

349%

370

281

32%

Palladium, including

koz

7

3

182%

17

54

-69%

from own Russian feed

koz

3

2

19%

11

51

-79%

from 3d parties feed

koz

5

0

1076%

6

3

115%

Platinum, including

koz

2

1

144%

4

12

-68%

from own Russian feed

koz

0

1

-93%

2

9

-83%

from 3d parties feed

koz

2

0

736%

2

2

-4%

Nkomati (South Africa) 3

 

 

 

 

 

 

 

Nickel

t

1,452

1,761

-18%

5,839

6,485

-10%

Copper

t

842

898

-6%

2,877

3,419

-16%

Palladium

koz

8

9

-11%

30

33

-8%

Platinum

koz

3

4

-25%

13

14

-8%

 

Notes:

Totals may value from the sum of numbers as a result of rounding. The production results of Nkomati is not reflected in totals of Norilsk Nickel Group. Norilsk Nickel Group owns 50.01% of Bystrinsky GOK (Chita Copper Project). Production results are shown metal in concentrate for sale on 100% basis and fully consolidated in total operational results. The concentrator at the Bystrinsky project was launched 2019. Norilsk Nickel Group owns 50% of Nkomati. Production results are shown metal in concentrate for sale on 50% basis and not consolidated in total operational results. The mine will be put on care and maintenance as part of the asset conservation plan scheduled for completion by 2021.

This announcement contains inside information in accordance with Article 7 of EU Regulation 596/2014 of 16 April 2014.

Full name and position of person making the announcement - Vladimir Zhukov,

Vice - president, Investor Relations

 

ABOUT THE COMPANY

MMC Norilsk Nickel is a diversified mining and metallurgical company, the world's largest producer of palladium and high-grade nickel and a major producer of platinum and copper. The company also produces cobalt, rhodium, silver, gold, iridium, ruthenium, selenium, tellurium, sulphur and other products.

The production units of Norilsk Nickel Group are located at the Norilsk Industrial District, on the Kola Peninsula and Zabaykalsky Krai in Russia as well as in Finland and South Africa.

MMC Norilsk Nickel shares are listed on the Moscow and on the Saint-Petersburg Stock Exchanges, ADRs are traded over the counter in the US and on the London, Berlin and Frankfurt Stock Exchanges.

Media Relations:     Investor Relations:

Phone: +7 (495) 785 58 00    Phone: +7 (495) 786 83 20

Email: pr@nornik.ru     Email: ir@nornik.ru

 


ISIN:US55315J1025
Category Code:MSCH
TIDM:MNOD
LEI Code:253400JPTEEW143W3E47
Sequence No.:92592
EQS News ID:1164403
 
End of AnnouncementEQS News Service

UK Regulatory announcement transmitted by DGAP - a service of EQS Group AG. The issuer is solely responsible for the content of this announcement.

Date   Source Headline
14th Apr 20234:07 pmEQSNORNICKEL DISCONTINUES DISCLOSURE VIA PRIMARY INFORMATION PROVIDER
6th Apr 20234:00 pmEQSMMC Norilsk Nickel: NINE INDEPENDENT CANDIDATES ARE NOMINATED TO NORNICKEL’S BOARD OF DIRECTORS
17th Mar 20238:01 amEQSNORNICKEL COMPLETED SELF-ASSESSMENT FOR IRMA CERTIFICATION
22nd Feb 20234:45 pmEQSMMC Norilsk Nickel: THE BANK OF NEW YORK MELLON NOTIFIED OF THE TERMINATION OF THE DEPOSIT AGREEMENT FOR NORNICKEL’S ADR PROGRAM
10th Feb 20232:30 pmEQSNORNICKEL REPORTS FULL YEAR 2022 AUDITED CONSOLIDATED IFRS FINANCIAL RESULTS
10th Feb 20231:31 pmEQSNORNICKEL REPORTS FULL YEAR 2022 AUDITED CONSOLIDATED IFRS FINANCIAL RESULTS
8th Feb 20233:00 pmEQSPOLAR LITHIUM, A JOINT VENTURE OF NORNICKEL AND ROSATOM, RECEIVES LICENSE TO DEVELOP KOLMOZERSKOYE PROJECT
8th Feb 20232:00 pmEQSPOLAR LITHIUM, A JOINT VENTURE OF NORNICKEL AND ROSATOM, RECEIVES LICENSE TO DEVELOP KOLMOZERSKOYE PROJECT
24th Jan 202312:31 pmEQSNORNICKEL ANNOUNCES CONSOLIDATED PRODUCTION RESULTS FOR 2022
24th Jan 202311:31 amEQSNORNICKEL ANNOUNCES CONSOLIDATED PRODUCTION RESULTS FOR 2022
22nd Dec 20223:00 pmEQS«NORNICKEL» SUCCESSFULLY PLACED CNY 5 BILLION EXCHANGE-TRADED BONDS
22nd Dec 20222:00 pmEQS«NORNICKEL» SUCCESSFULLY PLACED CNY 5 BILLION EXCHANGE-TRADED BONDS
16th Dec 20223:08 pmEQSNORNICKEL APPROVES BUDGET FOR 2023
16th Dec 20222:09 pmEQSNORNICKEL APPROVES BUDGET FOR 2023
24th Nov 20223:31 pmEQSSHAREHOLDERS OF NORINICKEL ELECTED NEW DIRECTORS
24th Nov 20222:31 pmEQSSHAREHOLDERS OF NORINICKEL ELECTED NEW DIRECTORS
15th Nov 202210:00 amEQSNORNICKEL HAS DEVELOPED LONG-TERM SCENARIOS FOR GLOBAL ECONOMY AND CLIMATE CHANGE
15th Nov 20229:00 amEQSNORNICKEL HAS DEVELOPED LONG-TERM SCENARIOS FOR GLOBAL ECONOMY AND CLIMATE CHANGE
1st Nov 20221:50 pmEQSNORNICKEL PROVIDES UPDATE IN RELATION TO LOAN PARTICIPATION NOTES DUE 2025
1st Nov 202212:50 pmEQSNORNICKEL PROVIDES UPDATE IN RELATION TO LOAN PARTICIPATION NOTES DUE 2025
28th Oct 20224:00 pmEQSNORNICKEL’S BOARD OF DIRECTORS RECOMMENDS NEW DIRECTORS
28th Oct 20224:00 pmEQSNORNICKEL’S BOARD OF DIRECTORS RECOMMENDS NEW DIRECTORS
24th Oct 20222:00 pmEQSNORNICKEL ANNOUNCES CONSOLIDATED PRODUCTION RESULTS FOR 9 MONTHS OF 2022
24th Oct 20222:00 pmEQSNORNICKEL ANNOUNCES CONSOLIDATED PRODUCTION RESULTS FOR 9 MONTHS OF 2022
17th Oct 202212:00 pmEQSNORNICKEL REPORTS SUCCESSFUL PLACEMENT OF RUB 25 BN EXCHANGE-TRADED BONDS
17th Oct 202212:00 pmEQSNORNICKEL REPORTS SUCCESSFUL PLACEMENT OF RUB 25 BN EXCHANGE-TRADED BONDS
4th Oct 202212:45 pmEQSNORNICKEL CANCELS TREASURY SHARES
4th Oct 202212:45 pmEQSNORNICKEL CANCELS TREASURY SHARES
28th Sep 202212:00 pmEQSNORNICKEL’S BOARD OF DIRECTORS DECIDED TO HOLD EXTRAORDINARY GENERAL MEETING OF SHAREHOLDERS
28th Sep 202212:00 pmEQSNORNICKEL’S BOARD OF DIRECTORS DECIDED TO HOLD EXTRAORDINARY GENERAL MEETING OF SHAREHOLDERS
16th Sep 20225:01 pmEQSNORNICKEL PROVIDES FURTHER UPDATE ON NOTEHOLDERS’ CONSENT SOLICITATION
16th Sep 20225:01 pmEQSNORNICKEL PROVIDES FURTHER UPDATE ON NOTEHOLDERS’ CONSENT SOLICITATION
15th Sep 20222:26 pmEQSMMC Norilsk Nickel: FIRE AT KOLA MMC EXTINGUISHED. NICKEL AND PLATINUM GROUP METALS PRODUCTION UNAFFECTED
15th Sep 20222:25 pmEQSMMC Norilsk Nickel: FIRE AT KOLA MMC EXTINGUISHED. NICKEL AND PLATINUM GROUP METALS PRODUCTION UNAFFECTED
14th Sep 202211:01 amEQSMMC Norilsk Nickel: FIRE BREAKS OUT IN ELECTROWINNING SHOP AT KOLA DIVISION
14th Sep 202211:00 amEQSMMC Norilsk Nickel: FIRE BREAKS OUT IN ELECTROWINNING SHOP AT KOLA DIVISION
2nd Sep 20225:21 pmEQSNORNICKEL PROVIDES UPDATE ON NOTEHOLDERS’ CONSENT SOLICITATION
2nd Sep 20225:20 pmEQSNORNICKEL PROVIDES UPDATE ON NOTEHOLDERS’ CONSENT SOLICITATION
18th Aug 20223:45 pmEQSINFORMATION NOTICE FOR HOLDERS OF DEPOSITARY RECEIPTS
18th Aug 20223:45 pmEQSINFORMATION NOTICE FOR HOLDERS OF DEPOSITARY RECEIPTS
11th Aug 20224:30 pmEQSNORNICKEL’S SHAREHOLDERS APPROVED REDUCTION OF THE AUTHORIZED CAPITAL OF THE COMPANY
11th Aug 20224:30 pmEQSNORNICKEL’S SHAREHOLDERS APPROVED REDUCTION OF THE AUTHORIZED CAPITAL OF THE COMPANY
10th Aug 20225:12 pmEQSMMC Norilsk Nickel: NOTEHOLDERS’ CONSENT SOLICITATION LAUNCH
10th Aug 20225:12 pmEQSMMC Norilsk Nickel: NOTEHOLDERS’ CONSENT SOLICITATION LAUNCH
2nd Aug 20225:22 pmEQSNORNICKEL REPORTS FIRST HALF 2022 INTERIM CONSOLIDATED IFRS FINANCIAL RESULTS
2nd Aug 20225:21 pmEQSNORNICKEL REPORTS FIRST HALF 2022 INTERIM CONSOLIDATED IFRS FINANCIAL RESULTS
28th Jul 202211:01 amEQSNORILSK NICKEL ANNOUNCES CONSOLIDATED PRODUCTION RESULTS FOR 1H 2022
28th Jul 202211:01 amEQSNORILSK NICKEL ANNOUNCES CONSOLIDATED PRODUCTION RESULTS FOR 1H 2022
22nd Jul 20229:51 amEQSKRASNOYARSK COURT APPROVES SETTLEMENT BETWEEN NORNICKEL SUBSIDIARY AND FISHERIES AGENCY
22nd Jul 20229:51 amEQSKRASNOYARSK COURT APPROVES SETTLEMENT BETWEEN NORNICKEL SUBSIDIARY AND FISHERIES AGENCY

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.