Less Ads, More Data, More Tools Register for FREE

Pin to quick picksMIRL.L Regulatory News (MIRL)

  • There is currently no data for MIRL

Drilling Report

30 Apr 2007 07:04

Minera IRL Limited30 April 2007 Minera IRL Limited Press Release Minera IRL Limited reports positive drilling results from the Jaguelito Silver-Gold Project, Argentina LONDON: 30 April 2007 - Minera IRL Limited (MIRL or The Company), the emergingprecious metals mining company, with assets in Peru, Argentina and Chile, ispleased to announce the results of a recently completed diamond drilling programat its high sulphidation epithermal silver gold Jaguelito Project in Argentina.The project is located in the mining friendly province of San Juan which is alsohome to Barrick's Veladero Mine and Pascua Lama Project. The diamond drilling program comprised 52 drill holes for a total of 5,762 mtargeting two principle mineralized zones, Capote (42 holes) and Alcatraz (10holes). In addition some 493m of surface trench sampling was completed. Thisprogram supplements 23,000m of drilling by the previous explorer, IndustriasPenoles. The objectives of the MIRL program were to provide verificationinformation on the Penoles database, to conduct in-fill drilling to lift thecategorization of the existing Inferred resource to Measured and Indicated, andto better define the limits of the deposit. The results will be incorporatedinto a pre-feasibility study which is currently underway and scheduled forcompletion in the third quarter of 2007. Highlights of the drilling and trenching program include: • At Capote, Hole DDH07 Jag 104A intersected 70m grading 0.77g/t Au and 309.9 g/t Ag. • Also at Capote, Hole DDH07 Jag 111 intersected 64 m graded 0.96 g/t Au and 125.9 g/t Ag; • At Alcatraz, Hole DDH07 Jag 137 intersected 116 m grading 4.07 g/t Au and 52.0 g/t Ag; and • Trench 8 over an interval of 60 m grading 2.09 g/t Au and 19.1 g/t Ag Minera IRL Limited Vice President, Exploration, Donald McIver commented "Thesepositive results, obtained from within oxidized material which extendsvertically to more than 150 metres below surface, serve to confirm the potentialfor an open pittable mining operation. The new geological understanding whichMIRL has developed will serve to optimize this mineralized zone and assist inour exploration of this highly prospective 11,700 hectare concession." Infill drill holes are as follows: Capote Zone Hole Intersection Grade depth gm/t Section Hole Number From To Inter m M M m Au AgS-550 DDHO7-JAG-101 64.6 34.0 64.0 30.0 0.01 293.5S-550/-600 DDHO7-JAG-101A 111.6 8.0 94.0 86.0 0.06 124.1 including: 54.0 94.0 40.0 0.03 181.0S-600/-550 DDHO7-JAG-105 71.4 36.0 69.7 33.7 0.19 85.2S-600/-550 DDHO7-JAG-105A 74.5 2.0 74.5 72.5 0.41 57.1S-600/-550 DDHO7-JAG-104A 104.1 30.0 100.0 70.0 0.77 309.9 including: 32.0 78.0 46.0 1.07 409.5S-600 DDHO7-JAG-BDJ52T 120.0 0 72.8 72.8 0.07 49.3S-600 DDHO7-JAG-106 59.6 6.0 45.1 39.1 0.15 44.7S-600 DDHO7-JAG-BDJ37T 145.8 12.0 126.0 114.0 0.46 96.7 including: 54.0 82.0 28.0 1.15 143.3S-650/-600 DDHO7-JAG-110 93.1 30.0 83.3 53.3 0.92 111.0 including: 34.0 60.0 26.0 1.50 169.0S-650/-600 DDHO7-JAG-111 160.0 82.0 146.0 64.0 0.96 125.9 including: 84.0 106.0 22.0 2.35 101.2S-650/-600 DDHO7-JAG-112 152.0 100.0 148.0 48.8 1.18 54.5S-650 DDH07-JAG-107A 80.3 20.0 40.0 20.0 0.33 46.6S-650 DDHO7-JAG-109 88.4 7.2 70.0 62.8 0.55 45.9S-700/-650 DDHO7-JAG-116 104.0 26.0 104.8 78.8 0.59 31.7S-700/-650 DDHO7-JAG-116T 125.3 24.0 114.0 90.0 0.50 24.0S-700 DDHO7-JAG-113 48.2 0 36.0 36.0 0.90 39.9S-700 DDHO7-JAG-BDJ34T 79.7 4.0 56.0 52.0 0.67 41.6 including: 12.0 42.0 30.0 1.01 39.6S-700 DDHO7-JAG-114 73.6 14.0 46.0 32.0 0.76 44.1S-700 DDHO7-JAG-120A 100.1 12.0 52.0 40.0 1.15 62.8S-700 DDHO7-JAG-115 76.7 12.0 40.0 28.0 0.52 31.6S-750 DDHO7-JAG-119 62.3 0 48.0 48.0 0.48 98.7S-750 DDHO7-JAG-120 71.4 0 20.0 20.0 1.60 20.6S-750 DDHO7-JAG-121 72.2 10.0 32.0 22.0 0.83 39.9S-750 DDHO7-JAG-CIJ5T 61.7 6.8 48.0 41.2 0.78 24.4 including: 8.0 24.0 16.0 1.70 30.3S-750 DDHO7-JAG-122 83.3 10.0 74.0 64.0 0.27 30.7 Alcatraz Zone Hole Interval Grade depth gm/t Section Hole Number From To Inter M M m m Au AgS-700 DDHO7-JAG-118 177.0 114.0 152.0 38.0 1.62 5.8S-750 DDHO7-JAG-BDJ18T 210.2 76.0 160.0 84.0 1.40 14.2 including: 138.0 156.0 18.0 2.31 43.6S-750 DDHO7-JAG-137 220.2 100.0 216.0 116.0 4.07 52.0 including: 116.0 188.0 72.0 5.79 76.8S-800 DDH07-JAG-138 181.0 91.0 110.0 19.0 0.77 1.35 and: 150.0 174.0 24.0 1.29 79.5 Notable results of trenching over the Capote deposit are as follows: Interval Number Trench Number Of Samples Length Grade - gm/t M Au Ag Capote 4 27 54 0.80 42.4Capote 5 14 28 0.80 62.0Capote 6 29 58 0.73 27.9Capote 8 30 60 2.09 19.1 More detailed drill intersection and hole location information, as well asstatements of quality control procedures, can be found at the Minera IRL website www.minera-irl.com. This information will form an important component ofdetailed JORC compliant resource estimates by RSG Global to be compiled shortlyand reported at a later date. The Competent Person that has signed off on the contents of this release is MrDonald McIver, Vice President, Exploration, Minera IRL Limited, who is a memberof the AustIMM. For more information contact: Minera IRL +61 408 888 803Courtney Chamberlain, Executive Chairman Arbuthnot Securities + 44 (0)20 7012 2000Graham SwindellsPaul Vanstone Bankside Consultants + 44 (0)20 7367 8888Simon RothschildLouise Mason This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
28th Mar 20137:01 amRNS2012 Year-End Results
28th Feb 20137:00 amRNSCFO Appointment
13th Feb 20134:40 pmRNSSecond Price Monitoring Extn
13th Feb 20134:35 pmRNSPrice Monitoring Extension
13th Feb 20133:54 pmRNSNotification of interest
13th Feb 20137:00 amRNSSuccessful Completion of Exploration Drive
7th Feb 20132:26 pmRNSClosing of Offering
1st Feb 20136:23 pmRNSDirector's Dealing
1st Feb 20137:00 amRNSC$15 Million Offering
28th Jan 20137:00 amRNSMinera IRL to raise up to C$32 Million
14th Jan 20134:40 pmRNSSecond Price Monitoring Extn
14th Jan 20134:35 pmRNSPrice Monitoring Extension
21st Dec 20127:00 amRNSOllachea Environmental Impact Assessment submitted
13th Dec 20127:00 amRNSRenegotiated Agreement on Bethania Project
10th Dec 201210:52 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
3rd Dec 20127:00 amRNSUnderground Exploration Drilling Initiated
29th Nov 20127:00 amRNSOllachea Feasibility Study
21st Nov 20127:00 amRNSDon Nicolas Resource Upgrade
16th Nov 20124:35 pmRNSPrice Monitoring Extension
5th Nov 20127:00 amRNSThird Quarter 2012 Financial Results
17th Oct 20127:00 amRNSDon Nicolas EIA and Development Permit
28th Sep 20123:08 pmRNSAnnual General Meeting Voting Results
27th Sep 20124:35 pmRNSPrice Monitoring Extension
6th Sep 20127:00 amRNSNew Mineralized System at Don Nicolas Project
24th Aug 20124:00 pmRNSNotice of Annual General Meeting
13th Aug 20127:00 amRNSQ2 financial results for the period ended 30 June
24th Jul 20122:58 pmRNSHolding(s) in Company
18th Jul 20127:00 amRNSOllachea Resource Estimate
13th Jul 20124:00 pmRNSPreliminary Base Shelf Prospectus
10th Jul 20127:03 amRNSCommunity Agreement
7th Jun 20127:00 amRNSMinera and Ollachea Community Sign Agreement
25th May 20126:23 pmRNSPreliminary Shelf Base Prospectus
16th May 20127:00 amRNSDon Nicolas EIA Permitting
10th May 20127:00 amRNSInterim Financial Accounts for Q1
10th May 20127:00 amRNSFinancial Results for Q1
12th Apr 20123:33 pmRNSExercise of Options and Total Voting Rights
4th Apr 20127:00 amRNSGrant of Options
3rd Apr 20127:00 amRNSDirectors' Dealing and Exercise of Options
30th Mar 20121:01 pmRNSAnnual Results Part 2
30th Mar 20121:01 pmRNSAnnual Results Part 1
30th Mar 20121:00 pmRNSAnnual Results Part 3
26th Mar 20127:00 amRNSAdviser Change of Name
5th Mar 201212:58 pmRNSClosing of C$33.1 Million Offering
5th Mar 20127:00 amRNSExercise of Option by Agent, RBC Capital Markets
24th Feb 20127:01 amRNSAgency Agreement
20th Feb 20127:00 amRNSFiling of Preliminary Short Form Prospectus
17th Feb 20127:00 amRNSommencement of exploration drive at the Ollachea
14th Feb 20127:00 amRNSDon Nicolas Feasibility Study
29th Nov 20117:00 amRNSFinal Payment to Rio Tinto & Update for Ollachea
14th Nov 20117:00 amRNSThird Quarter 2011 Financial Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.