Operational Update

13 Oct 2017 07:00

RNS Number : 5003T
JKX Oil & Gas PLC
13 October 2017
 

 

13 October 2017

JKX Oil & Gas plc

("JKX", the "Company" or the "Group")

Operational Update

 

· Average Group production for September 2017 was 8,590 boepd, a 6.1% month-on-month decrease and a 14.9% year-on-year decrease for the first nine months of the year.

 

· An extensive review of the Phase 1 fracturing campaign at the Rudenkivke field in Ukraine determined that a significant amount of geological work is still required to understand this complicated reservoir before further significant expenditure can be justified.

 

· The Company is re-evaluating field development plans in Ukraine, with the aim of restarting drilling as soon as possible. For the moment, the focus on well workovers and other operations in producing fields.

 

· A delay of the workover of Well 5 in Russia is pushing back planned production to late November or early December.

 

· In Slovakia, project operator, Alpine Oil and Gas, following repeated delays caused by protesters and growing environmental reporting requirements is reconsidering its options with regard to continued operations.

 

Production for September 2017

 

September

2017

August

2017

% Change

9 months to September

2017

9 months to September

2016

% Change

Total production (boepd1)

8,590

9,146

(6.1)%

8,645

10,155

(14.9)%

Ukraine (boepd)

3,029

3,293

(8.0)%

3,595

4,039

(11.0)%

- Average gas production (MMcfd2)

14.3

15.4

(7.1)%

17.3

18.6

(7.0)%

- Average oil and condensate production (boepd)

646

721

(10.4)%

711

938

(24.2)%

Russia (boepd)

5,501

5,747

(4.3)%

4,905

6,116

(19.8)%

- Average gas production (MMcfd)

32.6

34.1

(4.4)%

29.1

36.3

(19.8)%

- Average condensate production (boepd)

63

65

(3.1)%

54

65

(16.9)%

Hungary (boepd)

60

106

(43.4)%

145

-

100%

- Average gas production (MMcfd)

0.3

0.6

(50.0)%

0.8

-

100%

- Average condensate production (boepd)

5

8

(37.5)%

10

-

100%

 

Average Group production for September 2017 was 8,590 boepd, a 6.1% month-on-month decrease and a 14.9% year-on-year decrease for the first nine months of the year. The year-on-year decrease was largely due to the delayed workover of well 25 in Russia and natural production decline in Ukraine and Hungary.

 

In Ukraine, production was down month-on-month in September mainly due to a scheduled shut-down of the Novonik gas plant during which shut-in BHP surveys were conducted on the majority of the producing wells.

 

In Russia, production was down month-on-month, primarily due to decline in output from Well 27 where an acid job was carried out at the end of the month as opposed to the beginning in the previous month.

 

In Hungary, production from well Hn-2 at the Hajdunanas field was down due to natural decline, as well as a shut-in ahead of a workover of well Hn-1.

 

Rudenkivske fracturing campaign update

 

An extensive review of the Phase 1 fracturing campaign was conducted which resulted in the following main conclusions:

 

· A significant amount of geological work is still required to understand this complicated reservoir before further significant expenditure can be justified.

· The presence of large volumes of formation water in post fracture production was not predicted, primarily because the petrophysical constants utilized in calculations were not suitable for lower quality rock that was fractured.

· Operationally the fracturing program went as planned with majority of stages pumped as per design, while the use of monobores enabling safe fracturing of old soviet wells.

 

Out of the 4 fractured wells, the Company plans to introduce gas lift at R6 and, if successful, at R19, while R25 and R10 are in the process of being abandoned.

 

We are now updating the Field Development Plans for Ukraine. This will enable us to embark on an investment program to increase production volumes and restart our drilling program in 2018. We are currently looking at different options to raise external financing needed to implement this strategy.

 

Technical Update for July-September

 

In Ukraine, after a break due to preparation for the fracturing campaign, the Company is refocusing on workovers and other operations at producing fields:

 

· M153 was worked over to clear a wax and salt blockage in the tubing, which resulted in the well restarting production at the rate of 50 boepd.

· M202 was put on gas lift which resulted in an increase in the monthly average gas rate from 0.1 to 0.3 MMscfd and an increase in condensate production of 20 boepd seen in September.

· M166X was re-started in September and has produced 1050 stb of oil and 3 MMscf of gas at an average water cut of 78%.

· In both Ignativske and Elyzavetske tests were conducted on the gas producing wells to determine the potential benefit from installing additional compression. These tests were encouraging with an increase of 1.25 MMscfd seen in Ignativske and 0.8 MMscfd benefit seen in Elyzavetske.

· After the failure of an ESP at IG110 in August the Company is re-evaluating the Ignativske field waterflood project.

· Attempts at workover of R15 targeting an oil zone, which produced in the past, have so far been unsuccessful due to fish in the hole and a suspected casing leak, but will continue.

 

In Russia,

 

· After a second acid job on 6th July, Well 25 has continued to perform well after the installation of chrome tubing. At the end of September it was producing 10.5 MMscfd.

· 2 acid jobs were carried out on Well 27 in the period, the first on the 5th August and the second on the 25th September. After the second acid job the initial choke was reduced from 38 to 36/64th" in an effort to stabilise production and lengthen the time between acid jobs.

· Well 20 is currently producing 12.4 MMscfd with only a slight decline in the production seen during the reporting period.

· Well 5 workover is experiencing delays due to the difficulty of releasing the tubing string from the ratch latch. Production is anticipated to re-start on this well in late November or early December.

 

In Hungary, the Hn-2ST well has been cycled to minimise water production and improvements to the separator and gas refrigeration system have helped to prolong gas & condensate production. In late September the well was shut in prior to the workover of the Hajdúnánás Hn-1 well where several new zones will be perforated for production. The workover should be completed by mid-October at which time sales gas deliveries will restart.

 

Slovakia

 

Environmental Impact Assessments (EIA) have been completed for three well locations within the Carpathian Fold Belt. The Operator (Alpine Oil & Gas) is in negotiation with the authorities in Bratislava to review the results of the EIAs and secure agreements to allow exploration drilling to take place. To date the government has refused to engage in dealing with landowner/environmental protests despite the mechanisms to bypass the protestors being available through the mining law. Access to and construction of rig sites has now been blocked by protestors for nearly two years. The Joint Venture is considering its options with regard to continued activity in Slovakia.

 

Bond repayments and restructuring

 

In January 2017 the Company was able to restructure the remaining $16 million of Bonds resulting in the liability being amortised over three years starting from February 2018.  In August 2017, the Company paid the convertible bond interest of $1.1million.

 

The next bond payment of $6.9 million is planned to be made in February 2018. The financing of the Bonds is within the operating cash flow capabilities of the Company.

 

Board changes and transition period

 

Following results of the AGM on June 30, the Board is actively looking for new Executive and Non-Executive Directors. Victor Gladun and Dmitriy Poddubny, the General Director and the Finance Director of our Ukrainian operating subsidiary, have taken on the role of Acting CEO and Acting CFO to secure a smooth management transition over this challenging period.

 

Reductions in overheads

 

The third quarter was a period of cost reduction initiatives. A few measures were taken immediately to significantly reduce the cost burden of the Company's London headquarters. In September 2017 we extracted ourselves from the long-term lease on one of the unoccupied floors. The Company carefully reviewed all current contracts and terminated the agreements with a few service providers to eliminate unnecessary expenses. We also continue to identify cost efficiency possibilities in all Group companies.

 

Legal disputes in Ukraine

 

For claims relating to 2010, amounting to approximately $11.3 million (including interest and penalties), the case has been transferred to the High Administrative Court of Ukraine and we are expecting a hearing.

 

For claims related to 2015 of approximately $25.9 million, PPC is involved in proceedings in the Poltava District Administrative Court, which are temporarily suspended and related to the main Arbitration case. The Ministry of Justice in Ukraine filed an appeal to set aside the arbitration award for damages against Ukraine and in favour of JKX. The High Court of the United Kingdom considered the appeal on 12 October 2017 and we are expecting the official ruling shortly.

 

 

1boepd - Barrels of oil equivalent per day

2MMcfd - Million cubic feet per day

 

 

 

This announcement contains inside information as defined in EU Regulation No. 596/2014 and is in accordance with the Company's obligations under Article 17 of that Regulation.

 

ENDS

JKX Oil & Gas plc +44 (0) 20 7323 4464

Victor Gladun, Acting Chief Executive Officer

 

Stockdale Securities +44 (0) 20 7601 6100

Robert Finlay, Daniel Harris

 

EM Communications +44 (0) 20 3709 5711

Stuart Leasor, Jeroen van de Crommenacker

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLFLLLFDBFEFBF
Date   Source Headline
21st Apr 20202:00 pmRNSPrice Monitoring Extension
15th Apr 20207:00 amRNSQuarterly Operations Update
27th Mar 202010:05 amRNSMore 2015 Poltava rental fees closed for PPC
9th Mar 202010:23 amRNSDisposal of non-core assets
20th Feb 20207:00 amRNSJKX becomes debt free and an executive change
9th Jan 20207:00 amRNSQuarterly Operations Update
16th Dec 20197:00 amRNSUpdate
12th Nov 20197:00 amRNSAppointment of Broker
22nd Oct 20197:00 amRNS2nd 2015 Poltava rental fee claim closed for PPC
9th Oct 20197:00 amRNSQuarterly Operations Update
20th Sep 20197:00 amRNSBoard Committee Appointments
16th Sep 20197:00 amRNSDirectorate Changes
23rd Aug 20197:54 amRNSDirectorate Changes
31st Jul 20197:00 amRNSHalf-year Report
19th Jul 20197:00 amRNSIG142 test results
12th Jul 20197:00 amRNSQuarterly Operations Update
2nd Jul 20191:00 pmRNS2015 Poltava rental fee claim closed in favour PPC
2nd Jul 20197:00 amRNSWell 5 initial test results
21st Jun 20197:00 amRNSReport on Payments to Govts
11th Jun 20197:00 amRNSDrilling Update
30th May 20197:00 amRNSBoard Update
23rd May 20195:55 pmRNSPost AGM Update
23rd May 20194:53 pmRNSResult of AGM
9th May 20197:00 amRNSUpdate on Well 5 sidetrack in Russia
2nd May 20191:08 pmRNSUpdate on 2015 Poltava rental fee claims
2nd May 20197:00 amRNSWM3 initial test results
26th Apr 20194:39 pmRNSNotice of AGM
18th Apr 20192:43 pmRNSUpdate on 2015 Poltava rental fee claims
17th Apr 20197:00 amRNSQuarterly Operations Update
8th Apr 20197:00 amRNSPublication of Annual Report 2018
29th Mar 20197:00 amRNSUNAUDITED PRELIMINARY RESULTS YE 31 DEC 2019
7th Mar 20197:00 amRNSUpdate on Well 5 sidetrack in Russia
29th Jan 20198:17 amRNSUkraine production update - replacement
29th Jan 20197:00 amRNSUkraine production update
10th Jan 201911:05 amRNSSecond Price Monitoring Extn
10th Jan 201911:00 amRNSPrice Monitoring Extension
10th Jan 20199:23 amRNSQuarterly Operations Update
9th Jan 20192:16 pmRNSTotal Voting Rights
5th Dec 20184:05 pmRNSUpdate on 2015 Poltava Rental Fee claims
5th Dec 201810:22 amRNSJKX announces increased revolving credit facility
29th Nov 201812:00 pmRNSMartial Law in Ukraine
16th Nov 201810:09 amRNSCorrection: Share Purchase by PCA
15th Nov 20187:00 amRNSShare Purchase by Person Closely Associated
7th Nov 201812:25 pmRNSDirector Share Purchase
30th Oct 20183:12 pmRNSDirector Share Purchase
25th Oct 20188:57 amRNSUpdate on 2015 Poltava Rental Fee claims
22nd Oct 201811:05 amRNSSecond Price Monitoring Extn
22nd Oct 201811:00 amRNSPrice Monitoring Extension
17th Oct 201811:35 amRNSUpdate on 2015 Poltava Tax Cases
17th Oct 20187:00 amRNSAppointment of BDO LLP ("BDO") as auditor

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.